1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.

Slides:



Advertisements
Similar presentations
Electricity Balancing Framework Guidelines
Advertisements

Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Completing the EU internal energy market
EBADGE EU wide inteligent balancing market Peter Nemček.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Ana Arana Antelo Electricity and Gas Unit Implementing the 3rd Energy package, Commission’s role EUROPEAN COMMISSION “IFIEC Europe Energy Forum” Brussels.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Energy Tom Howes DG Energy European Commission Europe's renewable energy strategy.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Valeria Termini Member of the CEER GA FTS-CEER bilateral meeting, Florence 06 th February 2012 Investment planning rules in Europe.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas Third Package Progress GIE conference
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2009, Groningen.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
TITRE ACER: Mission, Structure and Activities Alberto Pototschnig Director E-Control Energy Dialogue Vienna, 7 December 2011.
Gas Regional Initiative South South-East
FlorenceForum November 2008
ERGEG GRI South South East – , Maribor
EER Work Programme 2011 – electricity
Update on European Network Codes
Steven Gordon ACER Gas Department
EUROPEAN TRANSPARENCY UPDATE
Gas Regional Initiative South South-East
Gas Regional Initiative South South-East
Presentation transcript:

1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The European regulatory framework

2FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 What has to be done to reach 2014 internal market deadline (1/2) Market integration Internal market Coordinated network development

3FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 What has to be done to reach 2014 internal market deadline (2/2) Establishment of new institutions ENTSO-E (European Network of TSOs – Electricity) ACER (Agency for the Cooperation of Energy Regulators) Framework GuidelinesCodesDevelopment of Framework Guidelines and Codes Priority list (Commission) Framework Guidelines (ACER) Codes (ENTSO-E) Adoption of binding codes (Commission) Coordination of network development Ten-year network development plan

4FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 ACER Tasks as Regards the ENTSO-E Opinions Draft statutes, list of members and draft rules of procedures of ENTSO-E Draft annual programme, non-binding 10-year network development plan and network codes Where it considers that the draft annual work programme / non- binding 10-year network development plan / network code do not ensure non-discrimination, effective competition and the efficient functioning of the market Monitoring tasks Execution of the tasks of ENTSO-E Regional cooperation of the TSOs

5FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 ACER work on electricity framework guidelines Framework guidelines (non binding) set out clear and objective principles for the development of network codes relating to the areas identified in the priority list contribute to non-discrimination, effective competition and the efficient functioning of the market Deliverables in 2011: Grid connection Capacity allocation and congestion management System operation Balancing

6FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Development of framework guideline Identification of problem and objectives Identification of policy options Selection of policy option Public workshop Meetings of ad- hoc expert group Meetings with ENTSO-E ACERStakeholdersTSOs Draft Frame- work Guideline + GA Approval Public consultation Network Code process Revised FG + GA Approval ENTSO-E

7FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Grid connection Highlights Minimum requirements for all transmission grid users (Generators, Consumers, DSOs) New and (where applicable and necessary) existing grid users Next steps Final Framework Guideline (July 2011) Follow up on Network Codes on Grid Connection including ACER opinion ongoing until 2012

8FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Capacity Allocation & Congestion Management Highlights Intraday Day ahead Forward Governance (EC guideline) Next steps Final Framework Guideline (September 2011) Follow up on Network Codes Capacity Allocation and Congestion Management Forward Market network code

9FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 System operation Objectives operate the electrical system within defined limits apply same principles for different systems enable the integration of innovative technologies (Smart grids applications, renewable energy sources) make full use of information and communication technologies Next steps Final Framework Guideline (July 2011) Follow up on Network Codes NC on operational security NC on operational planning and scheduling NC on load-frequency control and reserves

10FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Balancing Highlights Depends on scoping discussions Most technical subject of the 3 rd package Next steps Final Framework Guideline (early 2012) Follow up on Network Code on balancing

11FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 EC priorities after 2011 Third party access rules Rules regarding harmonised transmission tariff structures Ten-year network development plan

12FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Thank you for your attention!