GOES-R High Latitude Proving Ground Status November 23, 2010 Reported by Tom Heinrichs UAF-GINA With thanks to colleagues at GINA, CIMSS, STAR, and NWS.

Slides:



Advertisements
Similar presentations
Alaska Region Proving Ground Activities, Demonstration and Evaluation or Where We Are Eric Stevens UAF / GINA 6/18/20131.
Advertisements

Transitioning unique NASA data and research technologies to operations SPoRT Update GOES-R Proving Ground November 23, 2010.
NWS Pacific Region “Preparing for GOES-R with Himawari-8” Bill Ward National Weather Service Pacific Region Headquarters Honolulu, Hawaii Wednesday, February.
Transitioning unique NASA data and research technologies to operations GOES-R Proving Ground Activities at the NASA Short-term Prediction Research and.
Update on Delivery System Options for ABI and VIIRS Air Quality Products Ray Hoff.
Alaska Region Satellite Products and Data Needs −or− “Where We Are Going” Eric Stevens UAF/GINA 6/18/20131.
NASA/SPoRT GOES-R PG update 1.Transition and Use of RGB Imagery 2.UAH CI Evaluation at WFOs 3.PG Related Presentations at NWA/GUC 4.QPE 5.Pseudo-GLM /
September 12, 2011 – Conference Call GOES-R Proving Ground All Hands SPoRT Update HWT Spring Program National Centers Activity OCONUS activities PG products.
Transitioning unique NASA data and research technologies to operations Relevant OCONUS Products Gary Jedlovec NASA / MSFC, Earth Science Office
Upcoming AQPG Activities Amy Huff Battelle Memorial Institute NOAA GOES-R AQPG 2 nd Annual Advisory Group Workshop January 12, 2012.
ASSESSING THE IMPACT OF COLLABORATIVE RESEARCH PROJECTS ON NWS PERFORMANCE Jeff Waldstreicher Scientific Services Division – Eastern Region Northeast Regional.
Science Mission Directorate National Aeronautics and Space Administration transitioning unique NASA data and research technologies The SPoRT Center – Infusing.
GOES-R Synthetic Imagery over Alaska Dan Lindsey NOAA/NESDIS, SaTellite Applications and Research (STAR) Regional And Mesoscale Meteorology Branch (RAMMB)
An Update of CIRA’s GOES-R and JPSS Proving Ground Activities Ed Szoke 1,2, Dan Bikos 1, Renate Brummer 1, Hiro Gosden 1, Steve Miller 1, Curtis Seaman.
H-8 Project Update COPC May 27, H-8 Project Update JMA planning for full H-8 operations in July 2015 – Commissioning progressing well Data quality.
A DVANCES IN C RYOSPHERIC P REDICTION IN A LASKA Jessica Cherry, Katrina Bennett Tom Heinrichs, Eric Stevens, Carl Dierking, Jiang Zhu University of Alaska.
Sandy Supplemental Project: New AWIPS Data for NWS in Alaska Carl Dierking, Tom Heinrichs, Gwen Bryson, Jay Cable, Scott Macfarlane, Jessie Cherry, Eric.
F OG AND L OW S TRATUS T RAINING R ESOURCES : B LOGS, V IDEOS AND F ACTS SHEETS ( AND HOW THEY COMPLEMENT EACH OTHER ) Scott Lindstrom University of Wisconsin-Madison.
High Latitude Proving Ground Liaison Eric Stevens, UAF/GINA
11 GOES-R Proving Ground CIRA / RAMMB Progress Report 16 April 2010 Proving Ground Product Status –New ORI case –Land Surface Temperature –Cloud Climatology.
High Latitude Satellite Proving Ground All-hands Meeting Update November 13, 2012
OCONUS Direct Readout Activities GOES-R OCONUS Workshop Reported by Tom Heinrichs Dayne Broderson, Jiang Zhu, Jay Cable
Poster 1.66 An Update on CIRA’s GOES-R Proving Ground Activities Ed Szoke 1,2, Renate Brummer 1, Hiro Gosden 1, Steve Miller 1, Mark DeMaria 3, Dan Lindsey.
GOES-R Proving Ground GOES-R Proving Ground Demonstration of Imagery Products at NOAA’s Storm Prediction Center and Hazardous Weather Testbed Chris Siewert.
NOAA Satellite Proving Ground/User Readiness Meeting
GOES-R Proving Ground Storm Prediction Center and Hazardous Weather Testbed Chris Siewert 1,2, Kristin Calhoun 1,3 and Geoffrey Stano OU-CIMMS, 2.
The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving Ground Update 6 January 2014 Contributions from: Kevin Fuell, Geoffrey.
1 CIMSS Participation in the Development of a GOES-R Proving Ground Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite.
Air Quality Proving Ground R. M. Hoff 1, A. Huff 2, S. Kondragunta 4, P. Ciren 4, C. Xu 4, H. Zhang 1, S. Christopher 3, E.-Y. Su 3 1 UMBC 2 Battelle Memorial.
NWS Pacific Region “Preparing for GOES-R with Himawari-8” Bill Ward National Weather Service Pacific Region Headquarters Honolulu, Hawaii Wednesday, January.
The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving Ground Update 9 September 2013 Contributions from: Kevin Fuell, Geoffrey.
1 CIMSS Participation GOES-R Proving Ground Status January 2011 UW-Madison Contributors to this presentation: Tim Schmit, Wayne Feltz, Jordan Gerth, Scott.
1 GOES-R AWG Product Validation Tool Development Aviation Application Team – Volcanic Ash Mike Pavolonis (STAR)
1 GOES-R AWG Product Validation Tool Development Aviation Application Team – Volcanic Ash Mike Pavolonis (STAR)
1 GOES-R Proving Ground CIRA / RAMMB Progress Report 10 January 2011 National Center Interactions WFO Interactions ORI Case Study Conferences and Meetings.
Update on Delivery System Options for ABI and VIIRS Air Quality Products Ray Hoff.
The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving Ground Update 9 July, 2012 Contributions from: Gary Jedlovec, Kevin.
Proving Ground Activities with Aviation Weather Center, Storm Prediction Center and NASA SPoRT GLM Science Meeting Huntsville, Alabama 20 September 2012.
NWS Operations Proving Ground November 2012 Update Proving Ground All Hands Teleconference 13 November 2012 Chad Gravelle.
1 CIMSS/ASPB Participation GOES-R Proving Ground Status September 2011 UW-Madison Contributors to this presentation: Tim Schmit, Wayne Feltz, Jordan Gerth,
Proving Ground All-Hands Meeting March 4 th, 2013 Presented by Eric Stevens March 4th, 2013Geographic Information Network of Alaska.
AVIATION WEATHER TESTBED UPDATE Amanda Terborg PG All-Hands call July 13 th, 2015.
1 NOAA/NWS Satellite Training Actions Update Anthony Moste k Office of Chief Learning Officer Chief, Forecast Decision Training Division (FDTD) Satellite.
January 7, 2015 Walter Wolf, Jaime Daniels, and Lihang Zhou NOAA/NESDIS, Center for Satellite Applications and Research (STAR) Shanna Sampson, Tom King,
GOES-R Proving Ground Status/Update Bonnie Reed January 2011.
GOES-R Recommendations from past GOES Users’ Conference: Jim Gurka Tim Schmit Tom Renkevens NOAA/ NESDIS Tony Mostek NOAA/ NWS Dick Reynolds Short and.
AWIPS II Activities SPoRT Virtual Workshop 13 February 2014 Transitioning unique data and research technologies to operations.
Transitioning research data to the operational weather community Overview of GOES-R Proving Ground Activities at the Short-term Prediction Research and.
Summary of GOES-R Activities at CIMSS/ASPB and Recommendations for the Future Steven Ackerman, Tom Achtor GOES-R Algorithm Working Group GOES-R Algorithm.
Current State of GOES-R/JPSS User Readiness and the Operations Proving Ground Chad Gravelle GOES-R/JPSS Proving Ground / User-Readiness Meeting 3 June.
The Evolving Role of the NWS Operations Proving Ground in the Research-to-Operations Process Kim Runk, Director.
Hydrometeorological Prediction Center Preparing for GOES-R at HPC David Novak Science and Operations Officer With contributions from Ed Danaher 2011 GOES-R.
A collaboration between Environment Canada will allow for a detailed analysis of the GOES-R FLS products that is not possible with standard surface based.
Alaska High Latitude Proving Ground GOES-R Aviation Products Experiment Volcanic Ash & SO2 - MVFR/IFR and Cloud Products NOAA Satellite Science Week Kansas.
1 Development of a GOES-R Automated Volcanic Cloud Alert System Michael Pavolonis (NOAA/NESDIS/STAR) Justin Sieglaff (UW-CIMSS) Ron Thomas, Paul Krehbiel,
Transitioning unique NASA data and research technologies to operations The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving.
Transitioning unique NASA data and research technologies to operations Gary Jedlovec and the SPoRT Team SPoRT Accomplishments.
Proving Ground All-Hands Meeting November 4 th, 2013 Geographic Information Network of Alaska High Latitude Proving Ground GINA Update Summary of Activities.
Update on Satellite Proving Ground Activities at the Operations Proving Ground Chad Gravelle GOES-R/JPSS All-Hands Call – 13 July 2015.
SANDY SUPPLEMENTAL PROJECT: NEW AWIPS DATA FOR ALASKA Carl Dierking, Tom Heinrichs, Gwen Bryson, Jay Cable, Scott Macfarlane, Jessie Cherry, Eric Stevens.
Alaska Region-specific Products: Satellite Data Activities and Impacts to NWS Alaska Operations GOES-R OCONUS Workshop Reported by Tom Heinrichs Dayne.
High Latitude Proving Ground Update Presented by Tom Heinrichs UAF GINA & CIFAR July 9, 2012.
1 Status of Satellite Training Actions Anthony Mostek Chief, Forecast Decision Training Division (FDTD/OCLO) LeRoy Spayd NOAA/National Weather Service.
GOES-R Proving Ground OCONUS Meeting Update on Product Implementation and Challenges Eric Lau NWS Pacific Region June
High Latitude Proving Ground / GINA Update Proving Ground All-Hands Meeting July 1, 2013 Presented by Tom Heinrichs, GINA
The GOES-R/JPSS Approach for Identifying Hazardous Low Clouds: Overview and Operational Impacts Corey Calvert (UW-CIMSS) Mike Pavolonis (NOAA/NESDIS/STAR)
1 PG-UR Annual Meeting: Welcome from the GOES-R Program Scientist Steven J. Goodman GOES-R Program Senior Scientist NOAA/NESDIS Annual NOAA Satellite Proving.
High Latitude Satellite Proving Ground Dayne Broderson, Tom Heinrichs, Jessica Cherry, Jiang Zhu, Carl Dierking, and Eric Stevens Geographic Information.
Sandy Supplemental for Alaska - Update Presented by Tom Heinrichs University of Alaska Fairbanks Geographic Information Network of Alaska.
The GOES-R Proving Ground
Presentation transcript:

GOES-R High Latitude Proving Ground Status November 23, 2010 Reported by Tom Heinrichs UAF-GINA With thanks to colleagues at GINA, CIMSS, STAR, and NWS Okmok Volcano July 13, 2008 (MODIS from UAF-GINA) 1

High Latitude GOES-R Proving Ground Status November 23, 2010 Real-time MODIS data (being used as GOES-R proxy data) is being pulled from UAF-GINA to CIMSS. Sample volcanic ash and cloud product cases have been produced and visualized in CIMSS AWIPS. GOES-R products flowing to UAF-GINA LDM since October 25. Will be moving to local Alaska processing of products sooner rather than later in order to reduce latency, which is currently about 20 minutes due to transfer MODIS data. 2

High Latitude GOES-R Proving Ground Status continued Orientation demonstration via gotomeeting with SOOs performed on November 2 nd. D2D (AWIPS visualizer) is running at UAF GINA so we can check product presentation. WFO forecaster job shadows performed the week of November 15. Numerous interactions between UAF-GINA and Alaska NWS IT staff working on firewall exceptions for LDM and network bandwidth issues; progress anticipated at the end of November following NWS firewall hardware upgrade On-site visit to Madison; Volcanic ash workshop in Anchorage; Interactions with NWS science staff; Hosted visit by SPoRT 3

High Latitude Proving Ground Near-Term Plans Training: provide asynchronous training materials to WFOs – Less than 30 minute modules – Narrated PowerPoints or videos – Written tutorials (PDF) Information Technology – Configure LDM connections between UAF-GINA and Alaska NWS – Consolidate University of Alaska LDMs – Continue to work on bandwidth issues 4

High Latitude Proving Ground Near-Term Plans, cont’d Evaluation – Develop surveys following deployment of data into Alaska NWS AWIPS (planned – early December 2010) – Gather feedback from forecasters (8 weeks – end of January 2011) – Prepare report (2 weeks – mid February 2011) 5

High Latitude GOES-R Proving Ground Experiment Product Overview 6 Slides from training provided by Mike Pavolonis

GOES-R Proving Ground Products (MODIS is used as a proxy for the GOES-R ABI) Cloud type (phase) Fog/low cloud probability Volcanic ash mass loading, height, and particle size SO 2 detection and loading 7 Pavolonis slide

SOO Training: Described for Each Product Algorithm output Primary limitation Applications Sample imagery (several examples) Accuracy assessment report 8

9 Cloud Type product visualized in AWIPS Pavolonis slide

Progress Recap Products being generated SSEC – GINA LDM data flow in place AWIPS working at GINA Training underway 10