Internship final report EDYTA PILORZ (Cracow University of Technology) September – October 2015 1 Supervisors: Jérôme Daguin Philippe Lenoir.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Smart Bridge Quarterly Progress Report #13 Task Further Refinements to GLHE Design Task Testing of a Medium-Scale Bridge Deck Heating System.
R.Becker (MIT) 15/10/02 UGBS Main Plate Patrick Schmid (left) of ETHZ did the CNC machining of the plate. Urs Horisberger (ETHZ) Completed follow up machining.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Trap Manifold design Constraints – The traps had to be able to withstand 300 degrees Celsius for at least 3 hours. – The traps must be easily accessible.
Given Connections Solution
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
© 2004 Swagelok Company igc ™ II Modular Surface-mount Design Design.
CONNECTORS, CABLES & SOLUTIONS Presentation I-Net M12 Crimp Field Industrial Ethernet D-Code 360° EMI/RFI Shielding with crimp flange system 8/2010.
Modification to Allow Automatic Filling of TSI Nephelometer with CO 2 Patrick Sheridan NOAA.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
Nikhef Amsterdam Mechanical- Technology Short update on CO 2 cooling activities at Nikhef 13 October 2010.
BGV 05-may-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : test & installation plans  point 8  LHC tunnel.
Copyrigth (c) Product Managment Leister
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
Modular Origami Grade 11 Project for School Year
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
PREZENTACJA WSPÓŁFINANSOWANA PRZEZ UNIĘ EUROPEJSKĄ ZE ŚRODKÓW EUROPEJSKIEGO FUNDUSZ SPOŁECZNEGO W RAMACH PROJEKTU MBM – KIERUNEK ZAMAWIANY.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
CMS COMMUNITY UPDATE PRESENTED BY : JOHN H. GONZAGA.
TXZ Heated Gas Line and Hot Box Valve Replacements Spire.
Internship final presentation Paula Skrobucha September- October 2015 Cracow University of Technology Paula Skrobucha PH-DT26/10/2015.
Krzysztof Śliwa 26 August, Krzysztof Śliwa 26 August, 2015  Tests done between 7th to 25th of August 2015  Circulation in by-pass over the manifold.
Created by Daniel Gargas Student from Cracow University of Technology.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Internship final report Joanna Staniszewska Cracow University of Technology –
Automotive Heating And Air Conditioning
The Low Inclination kit has been developed to overcome some of the limitations of the Heat Pipe collector and increase its installation flexibility,
Feedback on transfer line sizing and flow calculations for UT
“CENTRAL SUPPORT FRAME” -
WHY? HOW? Test Valve Measure Vibrations Contain Valves
new straw end plug: D=10.6 mm straws support frame Levan option
Alessandro Mapelli - µcool weekly - CERN
PANDA Yoke of the Magnet
DESIGN FINDINGS FOR THE CONSOLIDATION OF THE DIODE BUS BAR INSULATION
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Flexible lines assembly
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
Update on Junction Box Design
Update on Junction Box Design
رؤية مستقبلية لتطوير كلية الزراعة جامعة الفيوم
دانشگاه شهیدرجایی تهران
Implementation of bolt spacers to the oil cooler hardware
007DCDA 2½”-3”.
تعهدات مشتری در کنوانسیون بیع بین المللی
007DCDA 2”.
Industrial Cylinder Division - USA
The blades.
3000B 2”.
How to build a computer.
007DCDA 2½”-3”.
007DCDA 2”.
3000B 2”.
709 3/4”-2”.
Presentation transcript:

Internship final report EDYTA PILORZ (Cracow University of Technology) September – October Supervisors: Jérôme Daguin Philippe Lenoir

Main tasks 1. Integration the dummy load inside the TIF manifold 2. Attaching the Carel Valve with the dummy load 3. Replacing the old bypass valve with the Carel Valve in the plant Additional tasks 1.Designing the flange which will connect the DP flowmeters with the capillaries 2.Placing the DP flowmeters both in TIF and CMS P5 manifolds 3D models 2 Edyta Pilorz – internship final report

Integration the dummy load inside the manifold Measuring the connectors 3 Edyta Pilorz – internship final report

Integration the dummy load inside the manifold Preparing the 3D model of the dummy load 4 Edyta Pilorz – internship final report

Integration the dummy load inside the manifold The view of the manifold containing the dummy load inside 5 Edyta Pilorz – internship final report

Attaching the Carel Valve with the dummy load Simplified model of the Carel Valve 6 Edyta Pilorz – internship final report 3D of the Carel Valve provided by manufacturer

Attaching the Carel Valve with the dummy load The assembly of the connectors and the Carel Valve 7 Edyta Pilorz – internship final report

Attaching the Carel Valve with the dummy load Modifications of the tubing 8 Edyta Pilorz – internship final report

Replacing the bypass valve with the Carel Valve in the plant 9 Edyta Pilorz – internship final report The view of the present bypass valve in TIF plant

Replacing the old bypass valve with the Carel Valve in the plant First version of mounting the Carel Valve 10 Edyta Pilorz – internship final report disadvantages of this solution: -Short gland -Tee microfit Second version of mounting the Carel Valve 60 mm 14 mm

Designing the flange which will connect the DP flowmeters with the capillaries 11 The first concept Edyta Pilorz – internship final report

Designing the flange which will connect the DP flowmeters with the capillaries 12 Edyta Pilorz – internship final report CMS manifold with DP flowmeters The first concept

Designing the flange which will connect the DP flowmeters with the capillaries 13 Edyta Pilorz – internship final report The second concept

Designing the flange which will connect the DP flowmeters with the capillaries 14 Edyta Pilorz – internship final report The second concept Swagelok standard pieces Swagelok standard piece Swagelok ½inch 6 mm gland Swagelok tee microfits

Designing the flange which will connect the DP flowmeters with the capillaries 15 Edyta Pilorz – internship final report The second concept

Placing the DP flowmeters both in TIF and CMS P5 manifolds 16 Edyta Pilorz – internship final report The view of the loop in CMS manifold

Placing the DP flowmeters both in TIF and CMS P5 plant 17 Edyta Pilorz – internship final report Before in TIF After in TIF one standard Swagelok element The view of the loop in TIF manifold

Thank you for the attention! 18 Edyta Pilorz – internship final report