Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Role of Management and Technical Coordination
HL-LHC IR Higher Order Corrector Magnets Conceptual Design & Construction Activity F. Alessandria, G. Bellomo, F. Broggi, A. Paccalini, D. Pedrini, A.Leone,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
Italy contribution: Design Effort, Tools and Methods HL-LHC Standard & Best Practices Workshop CERN, June 11, 2014 Giovanni Volpini w/ contributions from.
HL-LHC Sextupole Magnet Design Review Giovanni Volpini on behalf of the LASA team with the help of Paolo Fessia CERN, May 26 th, 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
G. Volpini, J. Rysti CERN 15 July 2015 Round Coil Superferric Magnets (RCSM) magnetic field properties 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Giovanni Volpini, INFN Milano LASA lab., WAMSDO 2008, CERN 1 low loss wire design for the DISCORAP dipole G. Volpini, F. Alessandria, G. Bellomo, P. Fabbricatore,
CERN- KEK about LHC upgrades programs Lucio Rossi 14 December 2011.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
High Order Corrector Magnets Status F. Alessandria, G. Bellomo, F. Broggi, A. Paccalini, D. Pedrini, A.Leone, V. Marinozzi, M. Quadrio, M. Sorbi, M. Statera,
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
Graham Sellers Simulations of the beamline and detector regions of the LHC and FP420.
D2 CONFIGURATIONS P.Fabbricatore & S.Farinon INFN Genova  Starting from previous studies done at CERN, BNL and BLNL, possile cross sections of D2 dipole.
HL-LHC IR Corrector Magnets Design & Construction Activity Giovanni Volpini on behalf of the LASA team CERN, 9 October 2014.
FP7 HiLumi LHC Design Study Lucio Rossi CERN. Structure of the project HL-LHC and the FP7 HiLumi FP7 Design Study
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
O. Brüning, CERN USLARP Meeting, SLAC, 18 th – 20 th May, 2016 HL-LHC: New Collaboration Board 1.
O. Kester, NuSTAR annual meeting, 27/02/2013
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
The High Luminosity LHC Project
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
HL-LHC Magnet components and assemblies
WP11 – ANAC Report on First Semester
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
Dipole status & update DISCO_RAP (NTA)
Energy deposition studies on magnets. Aim. First applications
HL-LHC Corrector Magnet Design & Construction Activity Status
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
HL-LHC IR Corrector Magnets Conceptual Design & Construction Activity
EIC Accelerator Collaboration Meeting
Triplet corrector layout and strength specifications
AMICI WP5 INDUSTRIALIZATION
Review of Quench Limits
Presentation transcript:

Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni Volpini CERN, June 30 th, 2015

MAGIX & INFN participation to HL-LHC MAGIX WP1CORRAL Design, construction and test of the five prototypes of the corrector magnets for the HL interaction regions of HiLUMI WP2 PADS 2D & 3D engineering design of the D2 magnets WP3SCOW-2G Development of HTS coil for application to detectors and accelerators WP4SAFFO Low-loss SC development for application to AC magnets MAGIX is a INFN-funded research project, (GrV, «Call») whose goal is to develop superconducting technologies for application to future accelerator magnets. It includes four WP’s, two of which are relevant to HL-LHC , 1 M€ + personnel funds CERN-INFN Collaboration Agreement INFN already involved in FP7- HiLumi (UE-HILUMI, GrV) WP2 beam dynamics, LNF WP3 magnets, MI-LASA WP6 cold powering, MI-LASA 1 2 CERN endorses MAGIX WP1 & WP2 deliverables and milestones, contributing with 527 k€, through the collaboration agreement KE2291/TE/HL-LHC Giovanni Volpini CERN, 30 June 2015

The collaboration agreement

Giovanni Volpini CERN, 30 June 2015 IR layout IP design WP1 Design, construction and test of the five prototypes of the corrector magnets for the HL interaction regions of HiLUMI, from quadrupole to dodecapole. These magnets will be based on a superferric design. MI, LASA, Giovanni Volpini WP2 Electromagnetic and Mechanical Design, both 2D and 3D, the 2-in-1 separation dipole, «D2», reducing the harmonic multipole components. To deliver an engineering design of the dipole cross section and an overall design of the 3D layout of the magnet cold mass. GE, Pasquale Fabbricatore

Economic Plan CostsCERN contribution Personnel521,900 €50%260,950 € Materials for magnet construction 113,000 €75% 84,750 € Costruction & test363,000 €50%181,500 € Travels, lab operation, tooling, R&D activities 305,000 €0% 0 € TOTAL527,200 € 781,000 € WP1 (679k€) + WP2 (102 k€) 93 m.u. (WP1) + 18 m.u. (WP2) (INFN personnel only, no University employees) Payment linked to deliverables Giovanni Volpini CERN, 30 June 2015

Giovanni Volpini, CERN 30 June 2015 Schedule

Milestones and Deliverables Giovanni Volpini, CERN 30 June %

The End