MP3 List of main Issues during 22-28 March 2010 MP3 - Team.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
NQPS trips due to EMC transients 30/06/20111ZCh, TE-MPE-TM Z.Charifoulline - # nQPS.BS signals in A12 & A34 # statistics over.
Proposal for measurements on RB.A81 on 1st September August 2010 Emmanuele Ravaioli Thanks to A. Verweij.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
MP3 report : W27 to W33 (22 slides, 10’ ?) J.Ph Tock for the MP3 team: TE-MPE : N. Catalan, R. Denz, M. Koratzinos, A. Verweij, M. Zerlauth TE-MSC : B.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
MP3 report – week /05/2010 – 09/05/ actions MP3/QPS team in CCC LMC: 12 th of May 2010.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
QPS Signal Analysis Case studies from MPP and QPS Bob Flora.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Tuesday 7/7 & Night 8/7 06:53 Beam lost due to RF problem, understood  08:30 Access –VIP, Experiments, QPS, EPC, ABT, RF, BI, …. 15:15 Access over, expert.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Saturday 24 March 2012.
Powering the LHC Magnets
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday 14th March Second fill with pilot + 3 nominal bunches
Detailed global view on protection and detection of the circuits
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Machine Protection Xu Hongliang.
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
M. Zerlauth, I. Romera 0v1.
Friday March 4th 08h32: Access for beam dump system.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Planning at 5 o’clock meeting Friday
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
31/3/2010 Difficult day… but at the end stable beams.
Saturday 26 November 2011.
Presentation transcript:

MP3 List of main Issues during March 2010 MP3 - Team

Main issues on previous week CircuitProblemIntervention on field Remarks RB.A12 (22 March) Communication lost on one main dipole magnetYESRB circuit safe if I<2000A, but for higher energy, the heater power supplies must be charged. RU.L4 / RU.R4 (22,23,24 March) Many trips during controlled ramp down, even when using ‘correct’ di/dt NOWrong FGC parameters for slow abort and zero voltage crossing dI/dt (RU.L4) < 0.3A/s, dI/dt (RU.R4) < 0.08A/s RQTD/RQTF (23, 25 March) Tripped several times because of too fast trimming correction or wrong seqeunce when disabling the tune feedback. NO if I < 50A, U_res threshold = 2V if I > 50A, U_res threshold = 100mV RCO.A56B2 (22,24, 25,26) Tripped several times. Why?NO5th trip for RCO and 4th trip for RCD in 6 days. In all 5 events RCO goes first. RB.A23 (27 March) Discharging Heater Power supply on MB.B20R2YESFault on front-panel connector IT (27, 28 March) Inner triplet circuits trip frequently when being stopped with a Slow Power Abort NONeeds detailed analysis by EPC expert, probably related to not synchronized sequence of switching OFF nested converters ROF.A45B2 (28 March) Tripped during pre-cycle without apparent indication of a fault in the converter tbcFault is most likely related to the AC contactor state contact, might need EPC intervention, tbc RB.A45 (28 March) Blocked nQPS crate in B33R4 during beam injection NOReset of crate solved problem, but beam had to be dumped and sector switched off RQX.R2 (28 March) Trip of main triplet circuit at injection levelNONo apparent reason for trip (no signal above threshold), but ‘noisy’ Q2 signals, tbc by QPS expert MP3 Team

Main issues on previous week CircuitProblemIntervention on field Remarks RB.A12 (22 March) Communication lost on one main dipole magnetYESRB circuit safe if I<2000A, but for higher energy, the heater power supplies must be charged. RU.L4 / RU.R4 (22,23,24 March) Many trips during controlled ramp down, even when using ‘correct’ di/dt NOWrong FGC parameters for slow abort and zero voltage crossing dI/dt (RU.L4) < 0.3A/s, dI/dt (RU.R4) < 0.08A/s RQTD/RQTF (23, 25 March) Tripped several times because of too fast trimming correction or wrong sequence when disabling the tune feedback. NO if I < 50A, U_res threshold = 2V if I > 50A, U_res threshold = 100mV RCO.A56B2 (22,24, 25,26) Tripped several times. Why?NO5th trip for RCO and 4th trip for RCD in 6 days. In all 5 events RCO goes first. RB.A23 (27 March) Discharging Heater Power supply on MB.B20R2YESFault on front-panel connector IT (27, 28 March) Inner triplet circuits trip frequently when being stopped with a Slow Power Abort NONeeds detailed analysis by EPC expert, probably related to not synchronized sequence of switching OFF nested converters ROF.A45B2 (28 March) Tripped during pre-cycle without apparent indication of a fault in the converter tbcFault is most likely related to the AC contactor state contact, might need EPC intervention, tbc RB.A45 (28 March) Blocked nQPS crate in B33R4 during beam injection NOReset of crate solved problem, but beam had to be dumped and sector switched off RQX.R2 (28 March) 2 trips of main triplet circuit at injection levelNONo apparent reason for trip (no signal above threshold), but ‘noisy’ Q2 signals, tbc by QPS expert MP3 Team

RQX.R2 tripped twice while at injection current (450A) – No magnet quench at this low current – Heaters fired in both events (21:46 and 01:32), without clear indication as to the source of the (QPS) trigger – No apparent fault of the power converter RQX.R2 MP3 Team

RU.L4 still show frequent trips during controlled ramp downs – Problem related to incorrect ramp rate solved (now 0.3A/s) – Seems zero-voltage crossing problem, as QPS threshold will be raised when <50A, propose to align ramp rate with RU.R4, ie 0.08A/s to delay zero voltage crossing into <50A region RU.L4 MP3 Team

Resistance of 2 Ω in parallel on the circuit Note for operators : 600A detectors must be properly reset before re- starting the machine Frequent problems due to teething problems with tune feedback – Procedures and sequence fixed during the week RQTD/RQTF MP3 Team

RCO.A56B2 + ROF.A45B2 + IT MP3 Team ROF.A45B2 tripped with a fault which seems related to the AC contactor state contact -> might need an intervention to replace the power module (tbc by EPC) -> Currently not vital for beam operation RCO.A56B2 and RCD.A56B2: 5th trip for RCO and 4th trip for RCD in 6 days. In all 5 events RCO goes first, all events seem triggered by U_RES jumping to 250 mV in a step function (needs detailed analysis with EPC and QPS) -> Currently not vital for beam operation IT in general: Repetitive trips when switching them OFF or after Slow Power Aborts -> needs to be analysed by EPC, rather important as > pre-cycles