PC21 Coal Retirement Study TAS/TEPPC – Nov. 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.

Slides:



Advertisements
Similar presentations
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
Advertisements

Will CO2 Change What We Do?
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
RGGI Leakage Workshop Presentation June 15, 2006 Stephen J. Rourke Vice President, System Planning ISO New England.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Study Results February 10, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
ENERGY MARKET PERSPECTIVE
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Data Work Group(DWG) TEPPC 2026 Common Case - Fuel Prices November 17, 2015 Jamie Austin, PacifiCorp.
Fuel Prices TEPPC 2026 CC Data Work Group January 26, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
The following slides provide information about integrating wind energy into the electricity grid. Photo by Dennis Schroeder, NREL 25907NREL
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2026 Common Case Development Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Contents Introduction Focus area Wind scenarios
Integrated Resource Plan 2016
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
2017 Study Program Discussion
2017 Integrated Resource Plan
Zonal Electricity Supply Curve Estimation with Fuzzy Fuel Switching Thresholds North American power grid is “the largest and most complex machine in the.
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Key Findings and Resource Strategy
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Western Electricity Coordinating Council
RE Grid Integration Study with India
PC21 Coal Retirement Study
Byron Woertz, Manager—System Adequacy Planning
Study Results PC8-PC16 System Stress Tests
Scenario Development Subcommittee January 4, 2018
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Byron Woertz, Manager—System Adequacy Planning
Study Results Drought Scenario Study
PDWG Validation of the 2028 ADS PCM V1.0
Presentation transcript:

PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning

Overview Study Description › Scope › Input assumptions › Study qualifications Study Results › Details Generation Paths Other Observations 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Study Description 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Study Description - Purpose Model a scenario that approaches the 2024 trajectory of reducing carbon emissions to 80% below the 2005 levels by W ESTERN E LECTRICITY C OORDINATING C OUNCIL 248 in 2024

Study Description - Assumptions Modeling assumptions include: – Retirement of several high CO 2 intensity coal-fired generators based on vintage and location – Addition of renewable resources (wind + solar) – Additional energy efficiency – Addition of gas-fired generation – Addition of energy storage resources – More details on next slides 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

6 ABAZCACOMTUTWY Battle River 4,5 [537] Apache 2,3 [350] ACE Cogen [103] Comanche 1,2 [660] Colstrip 1,2,3 [1354] Huntington 1,2 [909] Dave Johnston 1-4 [762] Genesse 2 [390] Cholla 1,3 [387] Argus 8,9 [50] Craig 1,2 [863] Intermountain 1,2 [1800] Jim Bridger 1,2,3 [1581] Sheerness 1,2 [780] Coronado 1 [380] Casterville [1] Hayden 1,2 [446] NM KUCC 1-4 [175] Naughton 1,2 [357] Sundance 3 [362] H.W. Sundt 4 [156] Fellow [1] M Drake 5,6,7 [254] Four Corners 4,5 [1540] Sunnyside [53] Neil Simpson 2 [80] Navajo 2,3 [1500] Jackson Valley [21] Nucla 1-4 [100] Wygen 1,2 [180] Lassen [22] R D Nixon 1 [208] NVWA Wyodak [340] Mt Poso [35] N Valmy 2 [268] Centralia 2 [688] Phillips Carbon [16] TS Power 1 [227] Portland Cement [28] Port of Stockton [44] PC21 Additional Coal Retirements

PC21 Coal Retirements by State/Province 7 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Replacement Sources 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL The Retired MWh represents the energy produced by the PC21 retired coal resources in the 2024 v1.5 common case. The EE energy was modeled as a load reduction and resulted in a total reduction of about 1700 GWh.

Study Qualifications Path Ratings: The WECC paths associated with a few of the retired generators and their replacements would likely need to be re- rated through the path rating process. No changes in path or branch ratings were assumed for this study. Constraints: Other operating constraints and nomograms were also not modified. Flexibility Reserves: The flexibility reserve adders for each reserve area are derived from the loads and amount of variable generation. The flexibility reserve adders were not recalculated for this study. Resource Adequacy: A check of the peak planning reserve margins was not done. System Stability: Tests of system stability were not conducted. 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Results 10 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Dump Energy ReservesNomogramsCostDeliverableConstraints 11 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Generation that is chosen by the PSM model for commitment and dispatch for a least-cost solution may be dumped if its dispatch will break a modeling constraint regarding generation, transmission, reserves, and/or nomograms.

12 W ESTERN E LECTRICITY C OORDINATING C OUNCIL From New Gen 0 269, ,409,645 1,801, Load side ,820,604 38,636,263 61,938, ,356 -1,731,070

Category Change – Estimated/Actual 13 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

14 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Generation Comparison 15 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Difference in Annual Energy - WECC 16 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

2024 CO 2 PC21 Coal Retirement Case 17 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Generation Change by State and Fuel 18 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

19 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

20 W ESTERN E LECTRICITY C OORDINATING C OUNCIL This was the only replacement ES unit that had any significant operation. The others didn’t seem to reach the price thresholds.

WECC Paths 21 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Top 15 Heavily Utilized in PC21 22 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Comparison of Net Annual Flow – Top 15 U90 23 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Path 8 24 W ESTERN E LECTRICITY C OORDINATING C OUNCIL The retirement of the base load generation at Colstrip 1,2,3 had an impact on the Path 8 flows. It is also possible that the path rating would be reduced.

Path (COI plus PDCI) 25 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Path W ESTERN E LECTRICITY C OORDINATING C OUNCIL In the past a nomogram has been used to define a relationship between generation and path 27 flows. The nomogram was not modified to specify how the replacement generation in Utah would be treated with respect to southern California.

Path W ESTERN E LECTRICITY C OORDINATING C OUNCIL

More Results 28 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC Peak Week 29 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC Peak Hour – PC21 30 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

WECC Early April 31 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Dump Energy 4/7/24 – PC21 32 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Peak hour on April 2 – WECC PC21 33 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

California Peak Week 34 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

California Early April 35 W ESTERN E LECTRICITY C OORDINATING C OUNCIL The gaps between the demand and generation represent energy imports. The hours where the generation exceeds the demand represents exports.

36 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Observations The PC21 study had no unserved load. PC21 CO 2 was 29 million metric tons short of goal Overall energy from PC01 CC and CT units increased Overall energy from remaining coal units increased Share of annual energy from renewable resources is 23.1% in PC21 vs. 17.7% in PC01 Poor performance of PC21 pump storage projects except for project added in SRP area 37 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

38 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Contact Stan Holland Western Electricity Coordinating Council Senior Engineer (801) Stan Holland Western Electricity Coordinating Council Senior Engineer (801)