D&D Review 6 August 2007 1 PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Why do accidents happen?  Accidents happen for one or both of the following Unsafe acts & Unsafe conditions.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II DND Engineering Planning S. DeBarger Accelerator Systems Division.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
12 Safe Maintenance Rules HAZARD ISOLATIONS. August 6, 2015 | 2 To protect the persons who intervene on a facility, to be sure of the energy absence (electricity,
Accident Prevention.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
RISK ASSESSMENT AND MANAGEMENT
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
12 Functions of Food Service
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Safety on Call ACCIDENT PREVENTION. Safety on Call WHY DO ACCIDENTS HAPPEN? Accidents happen for one or both of the following: – Unsafe acts – Unsafe.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Hall A Installation Review John J. LeRose 2/25/2009.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
Pulsed Magnet Power Supply Feasibility Study
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Report Technical Director Storage-Ring-Installation Completed
The Survey of the Power Supply Reliability at SSRF
M.J. Barnes : Canadian Involvement with LHC
ILC RTML Meeting EDR Planning for Magnet Power Systems
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
GlueX Electronics Review Jefferson Lab July 23-24, 2003
The Fermi National Accelerator Laboratory is a U. S
SuperB RF and Other Components
Advanced Research Electron Accelerator Laboratory
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
Lockout/tagout Refresher Training
Linac LLP Outline LINAC Long Lead Procurements
Extraction Michael Bevins May 17, 2007
Target Safety System Interfaces
Presentation transcript:

D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)

D&D Review 6 August

3 Requirements Preserve PEP-II Components for potential new use. –Control environment Fire Water Physical damage from earthquake, etc. Theft Unauthorized use Store Components in a Safe manner –Control access to any residual radiation –Ensure Stored Energy Hazards are controlled –Monitor state of components –Maintain a clean environment

D&D Review 6 August Cost Effective Efficiency Storage in place in existing tunnel is most cost effective. –Avoids finding substantial storage space –Avoids handling components twice. Transition to Minimal Maintenance State to be done when manpower available –After down maintenance period starting October 2008 –Less conflict with LCLS construction activities. –Less impact on running program. –Saves overhead of new hires and training. Can Control access to tunnel using existing PPS Gates –Requires maintenance –Operator controlled

D&D Review 6 August Scope Tunnel of 2.2 km circumference Injection lines from LINAC Seven interaction Halls Power Supply/Service buildings

D&D Review 6 August

7

8

9 Power Supply Building 624

D&D Review 6 August Components Number of:HERLER Quadrupole Magnets Bend Magnets Dipole Correctors Other Magnets12456 Fast Feed Back kickers33 Beam Position Monitors Loss Monitors7573 Other Diagnostics12 RF Cavities 476 MHz288 RF Stations (DC PS, Klystron, Control)114

D&D Review 6 August PEP-II Control System ComponentNumber Micro Computers11 CAMAC Crates70 CAMAC Modules~ 1200 Gateways OIC Computers~ 20 Network Switches~ 22 Machine Protection System (MPS)

D&D Review 6 August Detailed Component Lists Online Link to V:\AD\PEP_DNDV:\AD\PEP_DND HER list V:\AD\PEP_DND\KH Nomencl. Folder\HERN10.2.SORT.Qty.xls LER list V:\AD\PEP_DND\KH Nomencl. Folder\LERN10.7.SORT.Qty.xls

D&D Review 6 August

D&D Review 6 August

D&D Review 6 August Maintaining Effort Tunnel mechanical integrity –One technician, ½ supervisor Tunnel water removal –Two technicians, ½ supervisor Tunnel lighting (for safety) –One technician, ½ supervisor Component removal for other programs –Must be controlled by knowledgeable people so to not damage equipment or adversely affect safety of area. –Two technicians, one mechanical engineer, one electrical engineer for 2 years, (1/2 that after 2 years)

D&D Review 6 August Cost Estimate Details FY09

D&D Review 6 August Cost Estimate – continued FY10

D&D Review 6 August Cost Estimate – continued FY11

D&D Review 6 August Cost Summary (K$)FY09FY10FY11 PEP-II Accelerator Work Tunnel Facility Maintenance and Security Power Total

D&D Review 6 August Manpower Summary FTE - YearFY09FY10FY11 PEP-II Accelerator Work Tunnel Facility Maintenance and Security Power Total FTE - Year

D&D Review 6 August M&S Summary K$FY09FY10FY11 PEP-II Accelerator Work Tunnel Facility Maintenance and Security Power Total M&S

D&D Review 6 August extra