KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Recent Surface Studies in KEK-STF
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
Sample tests for stain problem at KEK LCWA2009 at Albuquerque 01 Oct T. Saeki 1.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Dec/1/2015WG3 in TTC Meeting Test Result of STF-2 Cryomodule Kirk Jun/2013Jul/2015 Preliminary.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Dec/3/2015WG2 in TTC Meeting Field emission / Radiation in V.T. Kirk.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
Cavity status; recent KEK activities MHI-06, MHI-7, MHI-8 were vertical tested on June, July.  EP acid (1000l) was re-newed on May 15. These cavity was.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Summary of STF-EP facility at KEK.
Recent Result for the STF-2 Cryomodule Operation
Rongli Geng ILC Cavity Group Meeting October 25, 2011
R&D for Fundamental Power Coupler in SRF Mass-Production
Cornell Updates Commissioning of T-map for ILC single cell starts.
Jan 2016 Solar Lunar Data.
ILC10 Beijing Global Design Effort
Juliette Plouin, Enrico Cenni, Olivier Napoly (CEA)
STF Plan of gradient improvement
Inspection of STF Baseline cavity #5 and #6
FNAL recent coupler troubles
New Cavity Techniques and Future Prospects
for the FNAL/ANL, JLab, and Cornell cavity teams
Progress and Issues with VTS Upgrade
S0 Status report from KEK
Effort Torwards Improving Large Scale Production for SC Cavities
R&D Activity for Field Emission and Vertical EP
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Recent SCRF Activities in IHEP
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping Result Summary For V.T. of IHEP #1 Cavity 1 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 2009/12/2 Kirk

Brief History & Future Plan 2007/May Construction started Pit, Cavity hanger, Control room and etc. 2008/Mar V.T. facility completed 2008/Jul First V.T. at STF Commissioning test AES#001 cavity used (Rental from FNAL) 2008/Dec V.T. for S1-Global started MHI#5-#9 cavities used 2009/Dec V.T. for S1-Global will be finished This final test will be done at 16/Dec. 2010/Mar V.T. for S0 plan will be started MHI#10 and #11 cavities used 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 2

3 New Vertical Test 2009/12/2

2nd Workshop of the IHEP 1.3GHz SRF R&D Project Status of V.T. in STF 42009/12/2

2nd Workshop of the IHEP 1.3GHz SRF R&D Project 5 T-mapping system Fish-bone structure carbon resistor 30° Pinpoint attachment 2009/12/25 Totally 352ch resistors 0.1sec sampling time

2nd Workshop of the IHEP 1.3GHz SRF R&D Project 6 X-ray-mapping system Top flange Totally 142ch PIN diodes 0.1sec sampling time Bottom flange 20 PIN diodes are attached at each iris. At the iris between #3 and #4 cell, and #6 and #7 cell, they are not attached. 2009/12/26

Best Result of MHI#1-#9 Cavities 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 72009/12/2

Final Result of MHI#1-#9 Cavities 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 8 Performance of MHI#8 and #9 was degraded! 2009/12/2

2nd Workshop of the IHEP 1.3GHz SRF R&D Project 9 Max E acc of MHI#1-#9 Cavities cable breakdown study of magnetic shield brown stains 1 st batch2 nd batch3 rd batch ? 2009/12/2

Recent problem at STF Heavy field emission After exchange for new EP acid on May Many brown stains found on the inner surface Radiation level was much higher 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 10

Before exchange for new EP acid Over-range Comparison of radiation level among recent 10 V.T.s 11 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 2009/12/2 After exchange for new EP acid

Result of MHI#7 cavity at 2 nd V.T. 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 12

13 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 14/Oct (Wed)10:50Installation of MHI#7 into cryostat 11:32Helium transfer starts 17:56Helium transfer finishes pass-band mode measurement and TDR check 15/Oct (Thu) 7:00cable correction 7:35Helium transfer starts 10:03Measurement starts at 4.2K 10:12Measurement finishes at 4.2K (E acc, max =8.9MV/m, P 0 =192W, power limit, no x-ray) 10:46Decompression from 4.2K to 2K 12:06Helium transfer at 2.38K 14:33Decompression restarts 17:191 st power rise at π mode (E acc, max =33.5MV/m, P 0 =246W, Radiation Limit) 19:358π/9 mode (E acc, end cell =33.3MV/m) 19:587π/9 mode (E acc, end cell =34.2MV/m) 20:246π/9 mode (E acc, end cell =33.7MV/m) 21:105π/9 mode (E acc, end cell =33.5MV/m) 21:494π/9 mode (E acc, end cell =30.1MV/m) 22:413π/9 mode (E acc, end cell =17.5MV/m) 22:592 nd power rise at π mode (E acc, max =33.6MV/m, P 0 =247W, Radiation Limit) 23:30V.T. finishes Experimental Log for MHI#7 at 2 nd V.T. 2009/12/2

Q 0 -E acc Curve for MHI nd V.T. 14 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 8.9MV/m 33.6MV/m thermal quench by defect or contamination Q t = 2.65 x → 2.58 x MV/m thermal quench by defect or contamination 2009/12/2

Radiation Level in π mode 15 2nd Workshop of the IHEP 1.3GHz SRF R&D Project process 2009/12/2

7 pass-band modes measurement 2nd Workshop of the IHEP 1.3GHz SRF R&D Project /12/2

17 cellπ8π/97π/96π/95π/94π/93π/9E acc, max 1 & & & & final state self- pulse power limit self- pulse limiting cell Cell #9 Cell #5 ? excitation of other pass-band 4π/9, 3π/9, 2π/9, π/9 8π/9, 7π/9, 6π/9 π/9Average 39.6 unit : [MV/m] E acc (on axis) per Cell 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 2009/12/2

2nd Workshop of the IHEP 1.3GHz SRF R&D Project #9 during 6, 7, 8π/9, π mode 18 π π 8π/9 7π/9 6π/9 5π/94π/9 3π/9 2009/12/2 Cell #9 was heating at 6, 7, 8π/9 and π mode.

2nd Workshop of the IHEP 1.3GHz SRF R&D Project 19 π #9 during 2 nd π mode Final state 2009/12/2

2nd Workshop of the IHEP 1.3GHz SRF R&D Project PIN Diode output at top and bottom flanges 20 π 8π/9 7π/9 6π/9 5π/9 4π/9 π Only π mode 1 st π 2 nd π 1 st π 2 nd π 3π/9 Top flange Bottom flange 2009/12/2 Lower level compared to top side Processing!

2nd Workshop of the IHEP 1.3GHz SRF R&D Project 21 1 st power mode2 nd power mode 2009/12/2 PIN Diode output at top and bottom flanges

2nd Workshop of the IHEP 1.3GHz SRF R&D Project PIN Diode output at iris region between #5 and #6 cell 22 π π 8π/9 7π/9 6π/95π/94π/9 3π/9 2009/12/2

33.6MV/m Comparison between T-mapping and X-ray nd π 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 23 T-mappingX-ray-mapping 2009/12/2 There is no correlation between them.

33.7MV/m Comparison between T-mapping and X-ray 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 24 T-mappingX-ray-mapping 2009/12/2 There is no correlation between them.

Online monitor during V.T. 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 25

Online monitor for X-ray-mapping 2nd Workshop of the IHEP 1.3GHz SRF R&D Project /12/2 Low field at π modeMiddle field at π modeHigh field at π mode The display is updated every 5 seconds.

Online monitor of time trend 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 27 X-ray-mapping T-mapping 2009/12/2

Online monitor 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 28 6π/9 5π/9 2009/12/2

Summary of T-mapping result 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 29

1 st nd rd pre-EP: 5μm EP1: μm EP2: 50μm H 2 O 2 +HWR+HPR EP2 : 50μm H 2 O 2 +HWR+HPR EP2 : 20μm Ethanol+HWR+HPR π, 7π/9, 5π/9, 3π/9 (27~28MV/m) 4π/9, 6π/9 (30, 31MV/m) π, 3π/9 (27, 31MV/m) 4π/9 (20MV/m) 30 π, 8π/9, 4π/9, 3π/9 (20~23MV/m) 7π/9 (29MV/m) 6π/9 (33MV/m?) 5π/9 (26MV/m) Transition of heating location for MHI#5 Hot Water Rinsing with Ultrasonic 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project

Transition of heating location for MHI#6 1 st 4 th 6 th π (25.7MV/m) 3π/9 (35.4MV/m) π~4π/9 (20~22MV/m) 3π/9 (40MV/m) 5π/9 (35MV/m) 6π/9 (35MV/m) 4π/9, 8π/9, π (28~32MV/m) 31 pre-EP: 5μm EP1: μm EP2: 50μm H 2 O 2 +HWR+HPR EP2 : 50μm H 2 O 2 +HWR+HPR EP2 : 20μm Ethanol+HWR+HPR (before 5 th V.T.) EP2 : 20μm Ethanol+HWR+HPR 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project

Transition of heating location for MHI#7 1 st 2 nd 32 3, 43MV/m 6, 7, 8π/9, π(17MV/m) 3π/9(31MV/m) 4π/9(27MV/m) 6~8π/9(17~19MV/m) 5π/9(25MV/m) EP2 : 20μm Degreasing(FM-20) +HWR+HPR pre-EP: 5μm EP1: 100μm EP2: 20μm Ethanol+HWR+HPR 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project

33 5, 38MV/m 3, 4, 8π/9, 5, 3, 4, 8π/9, Transition of heating location for MHI#8 EP2 : 20μm Degreasing(FM-20) +HWR+HPR pre-EP: 5μm EP1: 100μm EP2: 20μm Ethanol+HWR+HPR 3, 4, 5, 7, 8π/9, EP2 : 20μm Degreasing(FM-20) +HWR+HPR 1 st nd rd 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project

3, 4, 5, 7, 8π/9, 3, 1 st 7, 8π/9, 2 nd 34 Transition of heating location for MHI#9 1 st nd EP2 : 20μm Degreasing(FM-20) +HWR+HPR pre-EP: 5μm EP1: 100μm EP2: 20μm Ethanol+HWR+HPR 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project

2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project Summary of heating location in T-mapping 35 cavity # of V.T. Cell #1Cell #2Cell #3Cell #4Cell #5Cell #6Cell #7Cell #8Cell #9 MHI#51 st 60~150 (27, 31) MHI#52 nd 180~240 (26) 120~180 (29) 252~360 (33?) 90~150 (20~23) MHI#53 rd 150~180 (27~28) 288~342 (30, 31) MHI#61 st 240~270 (35) 150~210 (26) MHI#64 th 210~300 (40) 300~342 (20~22) MHI#66 th 240~300 (35) 108~210 (36) 60~150 (28~32) MHI#71 st 60~150 (17~19) 240~330 (25) 120~210 (31) 30~120 (27) MHI#72 nd 150~240 (35, 43) 18~108 (33~34) MHI#81 st 180~252 (28) 150~198 (16~17) 210~270 (25, 27) MHI#82 nd 60~120 (27~30) 180~300 (32, 38) 108~30 (41) MHI#83 rd 270~360 (17~20) 180~270 (39) MHI#91 st 198~240 (27~29) 120~180 (39) 240~300 (25~34) MHI#92 nd 30~120 (16~18) 270~360 (40) Red : Defect or contamination Blue : Field emission Black : Unknown angle gradient

Summary New V.T. facility at STF was completed Vertical test is routinely done T-mapping system identified perfectly heating location in every V.T. X-ray-mapping system is useful for evaluation of field emission Online monitor system is recently introduced V.T. for S1-Global will be finished in 16/Dec V.T. for S0 plan will be started from Mar/ /12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 36

For V.T. of IHEP #1 Cavity T-mapping? X-ray-mapping? Radiation monitorO.K. Other monitorO.K. CERNOX, electron probe, helium status and etc. Online monitorO.K. Data analysis? 2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 37

2009/12/2 2nd Workshop of the IHEP 1.3GHz SRF R&D Project 38 Thank you for your attention! This collaboration project will be certainly successful!