Introduction The best foundation for a successful project starts with a comprehensive construction estimate prepared by a group of professional estimators.

Slides:



Advertisements
Similar presentations
Bring The Best to VeriSign. 2 CORE: T2 Engineer –QA Req # : 227,226,237,233,238 Position : Software Engineer – QA Job Descriptions + The candidate should.
Advertisements

Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
QLD Group established in July 2010 & it`s still at it`s infancy stage Similar model to WA – in partnership with SPE and mainly focus on Technical Events.
TabWare Overview for NetSuite
Please open full screen The new effective way for reducing costs in construction projects.
Introduction to Business Unit II: Business Ownership and Environments.
The Potential for CHP in the Northeast Provided by the Industrial Energy Consumers Group, 1/18/07 Source: Energy and Environmental Analysis, Inc.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
The Committee of Registration and Licensing the Practice of Engineering Consultancy Profession and Contracting # Activity codeActivity Architectural design.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
CORE Centre for Offshore Research and Engineering Offshore Engineering Specialization Department of Civil Engineering National University of Singapore.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Tiger Supplies. About Us Tiger Supplies is a big provider of various equipments which located in Irvington, New Jersey. We are a leading provider for.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
About Us We are a natural gas EPC company specializing in a wide variety of aspects of natural gas installations Providing full service package.
1 RICS The Royal Institution of Chartered Surveyors London Quantity Surveying & Construction Faculty The Built Environment Group Corporate Professional.
 We will be watching the video about the population of the world again. I want you to pay attention to the little white dots. There are time periods.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
June 2012 ACM ENGINEERING SERVICES PTY LTD Contact Name Phone Number Address COMPANY / CAPABILITY OVERVIEW Established in 2005, ACM Engineering Services.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Also called: Factors of Production and Economic Inputs
Bring The Best to VeriSign. 2 VM3:Software Engineer –Network Operations Req # : 175,183 Position : Software Engineer - Network Operations Job Description.
Office of Natural Resources Revenue Office of Natural Resources Revenue (ONRR) U.S. Department of Interior Director Greg Gould Office of Natural Resources.
Copyright 2010, The World Bank Group. All Rights Reserved. Industry statistics General overview 1 Business statistics and registers.
Gas Lift Training Feb 5, 2002 ASME Gas Lift Workshop Mike Johnson, EMPC/Central Engineering-SSE.
ECONOMIC RESOURCES Also called: Factors of Production and Economic Inputs.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Course guide on Food Plant Design and Pilot Demonstration (FST 409) University of Agriculture, Abeokuta Department of Food Science and Technology.
Measuring the blue economy ad-hoc Member States' Expert Group 29 September 2015.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
2002 Numerical List of Manufactured and Mineral Products Publication Parts: Introduction, Conversion Table Mining Sectors 211, Oil and Gas Extraction 212,
Superloads. Completion Year Largest Volumes of Superloads Issued – Power Industry – Oil and Gas Exploration – Infrastructure 2013 – Volumes will decrease.
ECONOMIC RESOURCES Also called: Factors of Production and Economic Inputs.
Bringing together skilled Engineering & ICT professionals and companies.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
FIELD SERVICE upstream solutions. statement of capability We deliver reservoir, well, and integrated field management services to the upstream oil and.
CEM CEM – 520 Measuring the Effectiveness of Materials Management for Industrial Construction Projects in Saudi Arabia Thesis By Ali Al-Darweesh.
David Jurd – Managing Director, Abigroup Ian Luck – Managing Director, Baulderstone David Marchant – Managing Director, Conneq Core Competencies and Growth.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Projects India Projects India helps companies to keep updated themselves with New, Upcoming & Ongoing Projects in India. Projects India offers a range.
© ABB Automation Products GmbH ABB Instrumentation Customer Presentation TSP100, TSP300.
Application of the ISO for BIM Xenia Fiorentini, Engisis.
Industry Compliance Accurate Revenues & Data Professionalism & Integrity NOIA ANNUAL MEETING OFFSHORE BONDING & ROYALTIES PANEL Greg Gould, Director, Office.
© 2010 The Williams Companies, Inc. All rights reserved. Safe and Reliable.
Civil Engineering FALL 2013 Karen Medrano. What is Civil Engineering?
Arkom Engineering Consultants
2016 Alaska Western Workshop Cost Estimating 101
MATERIAL MANAGEMENT.
Estimating the Cost for the Concrete Pad
INTRODUCTION The company has been founded by a group of senior professionals having immense technical knowledge and experience in the respective fields.
Fundamentals of PROCESS PLANT PIPING DESIGN
9/18/2018 Bids CONTRACTING Khamis…..
Estimating the Cost for the Concrete Pad
Well Identification Industry Meeting
Also called: Factors of Production and Economic Inputs
The Construction Industry
How will the item be received by Hotel clientele?
Estimating the Cost for the Concrete Pad
The Construction Industry
Environmental Impact Assessments
Estimating the Cost for the Concrete Pad
Cost Estimating Best Practices
Empyrean Consulting, Inc.
Presentation transcript:

Introduction The best foundation for a successful project starts with a comprehensive construction estimate prepared by a group of professional estimators. Estimating requires the ability to prepare quantity surveys, determine labor productivity, price materials and know construction methodologies. Estimating requires experienced, professional estimators knowledgeable in construction practices and procedures. It involves knowledge in civil, architectural, mechanical and electrical disciplines. It includes coordinating these disciplines into a total project scope for a complete, understandable estimate submittal. GUCIERLI has the skilled, experienced professional estimators needed for any estimating effort. As an independent firm, GUCIERLI provides thoroughly researched, unbiased and accurate estimates for the construction industry. and also cost comparison as an International Benchmark such as IPA & Performance Forum.

Cost Estimating Services  Scope Of Services Scope Of Services  Tool and Benchmarking Tool and Benchmarking  Product Of Services Product Of Services  Project Experiences (Hydrocarbon/Oil & Gas) Project Experiences (Hydrocarbon/Oil & Gas)  Project Experiences (Non-Hydrocarbon) Project Experiences (Non-Hydrocarbon)  Cost Of Services Cost Of Services  Term Of Payment Term Of Payment  Your Benefit Your Benefit  Contact us Contact us

Scope Of Services Hydrocarbon / Refinery ( Oil and Gas ) Pipeline ( Onshore / Offshore ) Mineral and Infrastructures Power Plant and Power Distributions High Rise Building Food and Beverages General Industries

Tool and Benchmarking TOOLS – QUE$TOR, Ver.2012-Q3 – Excel Spreadsheet BENCHMARKING – IPA (Independent Project Analysis) – PERFORMANCE FORUM – MSS ( Market Survey System) from ODS Petrodata / IHS

Product of services Conceptual / Screening Feasibility Study Definitive Comparison / Analysis Modeling based on Tool

Project Experiences Hydrocarbon (Oil & Gas)  Offshore Pipeline – 10 Km  Offshore Pipeline – 110 Km  Onshore Pipeline – 120 km  ORF – East Java  ORF - Batam  Wellhead Platform – Irian Jaya  Wellhead Platform – Madura Sea  Subsea Facility 2000 Meter Water Depth  Etc  Santos  PETRONAS  ConocoPhillips  Santos  PETRONAS  ConocoPhillips  BP Tangguh  PETRONAS

Project Experiences Non – Hydrocarbon  Nickel Mine Infrastructure  Nickel Process Plant  Nickel Mine Infrastructure  Coal Mine Infrastructure  Coal Bed Methane  Ammonium Nitrate Plant  Public Water Treatment Plant  Food and Beverages  High Rise Building  Etc  SOLWAY  BHP Billiton  BANPU  SHELL  ORICA  Government  NESTLE  Various

Cost Of Services Minimal USD for every 100 Mil USD Project Value and add 150 USD every >100 Mil USD Project Value. (Net) 15 USD for Additional Item/Revision/Comments Minimum 500 USD/Equipment for procurement Support in Definitive stage (only)/FEED/FEL-3 if Equipment price not Provided USD/Development Modeling/Que$tor Modeling, and add 500 USD for each special /specific Modeling Items.

Term of Payment 15% Commitment fee Add 75% Payment for first Issue (IFC) Add 5% Payment for second Issue (IFA) Add 5% Payment for last Issue (AFD) Note : IFC: Issued For Comments IFA: Issued For Approved AFD: Approved For Development

Your Benefit Not need to Hire Employee/Contract, Etc. Not need to provide Office Furniture Not need to Provide IT/PC infrastructure Not need to use/rent Special Software Not Need Office Space and Consumables Etc.

Contact us Oil and Gas Mining