JINR WLCG Tier 1 for CMS 2012. 1 CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.

Slides:



Advertisements
Similar presentations
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
Advertisements

Service Data Challenge Meeting, Karlsruhe, Dec 2, 2004 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Plans and outlook at GridKa Forschungszentrum.
Update on Status of Tier-1 GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
Tier 1 in Dubna for CMS: plans and prospects Korenkov Vladimir LIT, JINR AIS-GRID School 2013, April 25.
José M. Hernández CIEMAT Grid Computing in the Experiment at LHC Jornada de usuarios de Infraestructuras Grid January 2012, CIEMAT, Madrid.
Preparation of KIPT (Kharkov) computing facilities for CMS data analysis L. Levchuk Kharkov Institute of Physics and Technology (KIPT), Kharkov, Ukraine.
Task 6.1 Installing and testing components of the LCG infrastructure to achieve full-scale functionality CERN-INTAS , 25 June, 2006, Dubna V.A.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
ICHEP06, 29 July 2006, Moscow RDIG The Russian Grid for LHC physics analysis V.A. Ilyin, SINP MSU V.V. Korenkov, JINR A.A. Soldatov, RRC KI LCG.
Thoughts on Future LHCOPN Some ideas Artur Barczyk, Vancouver, 31/08/09.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
Main title ERANET - HEP Group info (if required) Your name ….
Main title HEP in Greece Group info (if required) Your name ….
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Ian Bird LHCC Referees Meeting; CERN, 12 th March 2013 March 6, 2013
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
ATLAS Tier 1 at BNL Overview Bruce G. Gibbard Grid Deployment Board BNL 5-6 September 2006.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow UK-T0 Meeting 21 st Oct 2015 GridPP.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
Status of India CMS Grid Computing Facility (T2-IN-TIFR) Rajesh Babu Muda TIFR, Mumbai On behalf of IndiaCMS T2 Team July 28, 20111Status of India CMS.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
STATUS OF KISTI TIER1 Sang-Un Ahn On behalf of the GSDC Tier1 Team WLCG Management Board 18 November 2014.
Performance assessment of the 2008 configuration of the JINR CICC cluster A. Ayriyan 1,*, Gh. Adam 1,2, S. Adam 1,2, E. Dushanov 1, V. Korenkov 1, A. Lutsenko.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
Participation of JINR in CERN- INTAS project ( ) Korenkov V., Mitcin V., Nikonov E., Oleynik D., Pose V., Tikhonenko E. 19 march 2004.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
The Worldwide LHC Computing Grid Frédéric Hemmer IT Department Head Visit of INTEL ISEF CERN Special Award Winners 2012 Thursday, 21 st June 2012.
Development of a Tier-1 computing cluster at National Research Centre 'Kurchatov Institute' Igor Tkachenko on behalf of the NRC-KI Tier-1 team National.
IT-INFN-CNAF Status Update LHC-OPN Meeting INFN CNAF, December 2009 Stefano Zani 10/11/2009Stefano Zani INFN CNAF (TIER1 Staff)1.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Operations in R ussian D ata I ntensive G rid Andrey Zarochentsev SPbSU, St. Petersburg Gleb Stiforov JINR, Dubna ALICE T1/T2 workshop in Tsukuba, Japan,
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Global Science experimental Data hub Center April 25, 2016 Seo-Young Noh Status Report on KISTI’s Computing Activities.
Using HLRmon for advanced visualization of resource usage Enrico Fattibene INFN - CNAF ISCG 2010 – Taipei March 11 th, 2010.
INFSO-RI Enabling Grids for E-sciencE Turkish Tier-2 Site Report Emrah AKKOYUN High Performance and Grid Computing Center TUBITAK-ULAKBIM.
Grid technologies for large-scale projects N. S. Astakhov, A. S. Baginyan, S. D. Belov, A. G. Dolbilov, A. O. Golunov, I. N. Gorbunov, N. I. Gromova, I.
1 1 – Statistical information about our resource centers; ; 2 – Basic infrastructure of the Tier-1 & 2 centers; 3 – Some words about the future.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
Current status of the JINR Central Information and Computing Complex (CICC) and its user service V.V. Ivanov Laboratory of Information Technologies, JINR.
LIT participation LIT participation Ivanov V.V. Laboratory of Information Technologies Meeting on proposal of the setup preparation for external beams.
Computing infrastructures for the LHC: current status and challenges of the High Luminosity LHC future Worldwide LHC Computing Grid (WLCG): Distributed.
Report from US ALICE Yves Schutz WLCG 24/01/2007.
The Tier-1 center for CMS experiment at LIT JINR N. S. Astakhov, A. S. Baginyan, S. D. Belov, A. G. Dolbilov, A. O. Golunov, I. N. Gorbunov, N. I. Gromova,
Report on availability of the JINR networking, computing and information infrastructure for real data taking and processing in LHC experiments Ivanov V.V.
LHC collisions rate: Hz New PHYSICS rate: Hz Event selection: 1 in 10,000,000,000,000 Signal/Noise: Raw Data volumes produced.
Ian Bird WLCG Workshop San Francisco, 8th October 2016
The Beijing Tier 2: status and plans
LCG Service Challenge: Planning and Milestones
Grid site as a tool for data processing and data analysis
October 28, 2013 at 14th CERN-Korea Committee, Geneva
Update on Plan for KISTI-GSDC
Proposal for obtaining installed capacity
UK GridPP Tier-1/A Centre at CLRC
RDIG for ALICE today and in future
Dagmar Adamova (NPI AS CR Prague/Rez) and Maarten Litmaath (CERN)
Presentation transcript:

JINR WLCG Tier 1 for CMS 2012

1 CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of 2012 (Prototype) 2013October of 2014 (Tier-1 Start) HEP-SPEC0614,40028,80043,200 Disk, TB Include tape’s buffer pools 6603,1684,224 Tape, TB725, LHCOPN, Gbps WAN, Gbps Moscow & GEANT2) 2x10 More than 5 million tasks were executed in 2012 The computing resources allocated for JINR Tier-1 JINR-LCG2 Tier2 Site In 2012, In 2012, the JINR Grid-site is in the top ten of 143 Tier2 sites worldwide and on the 3-rd place in Europe. It covers about 46% of the RDIG share to the LHC.

2 CICC 2x720 sq m computer rooms

3

4 ObjectiveTarget date Presentation the Execution Plan to WLCG OBSep 2012 Prototype Disk & Servers installation and testsOct 2012 Tape system installationNov 2012 Organization of network infrastructure and connectivity to CERN via GEANT (2 Gb)Nov 2012 WLCG OPN integration (2 Gb) and JINR-T1 registration in GOCDB including integration with the APEL accounting system Dec 2012 M1Dec 2012 LHC OPN functional tests (2 Gb)May 2013 Test of WLCG and CMS services (2 Gb LHCOPN)May 2013 Test of tape system at JINR: data transfers from CERN to JINR (using 2 Gb LHC OPN)May 2013 Test of publishing accounting dataMay 2013 Definition of Tier 2 sites supportMay 2013 Connectivity to CERN 10 GbJul 2013 M2Jul 2013 LHC OPN functional tests (10 Gb)Aug 2013 Test of tape system at JINR: data transfers from CERN to JINR (using 10 Gb LHC OPN)Aug 2013 Upgrade of tape, disk and CPU capacity at JINRNov 2013 M3Nov % of the job capacity running for at least 2 months Storage availability > 98% (functional tests) for at least 2 months Running with > 98% Availabilities & Reliabilities for at least 30 days WLCG MoU as an associate Tier-1 centerFeb 2014 Disk & Tape & Servers upgradeOct 2014 M4Dec 2014 Milestones of the JINR CMS Tier-1 Deployment and Commissioning

5 Staffing ROLE FTE Administrative1.5 Network support2 Engineering Infrastructure 2.5 Hardware support3 Core software and WLCG middleware 4.5 CMS Services 3.5 Total17 Korenkov V. Administrative Dolbilov A. Networking Shmatov S. CMS services Mitsyn V. Core software and WLCG middleware Trofimov V. Core software and dCache

6 Pledges Year CPU (HEPSpec06) Disk (Terabytes)660*3168*4224* Tape (Terabytes) *include tape's buffer pools