April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage SPIE, May 2006 The Green Bank Telescope: Science Results and Lessons Learned.

Slides:



Advertisements
Similar presentations
Software Engineering Software Engineering is the science and art of building significant software systems that are: 1) on time 2) on budget 3) with acceptable.
Advertisements

April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage GBT Future Instrumentation Workshop, September 2006 The Green Bank Telescope:
Slide 1 Andromeda galaxy M31Milky Way galaxy similar to M31.
The Milky Way PHYS390 Astrophysics Professor Lee Carkner Lecture 19.
15 The Milky Way More than just a candy bar.. 15.
Gamma-Ray Astronomy Dana Boltuch Ph. D
The Milky Way Galaxy James Binney Oxford University.
Pulsar population overview Dunc Lorimer (WVU) November 2, 2006 The observed sample Spin frequencies > 10 Hz - normal pulsars - recycled objects Current/future.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Green Bank Laser Rangefinders.
AST 444 Problems.
Variable SiO Maser Emission from V838 Mon Mark Claussen May 16, 2006 Nature of V838 Mon and its Light Echo.
Our Galaxy The Milky Way. The Milky Way Almost everything we see in the night sky belongs to the Milky Way We see most of the Milky Way as a faint band.
The Milky Way and Other Galaxies Science A-36 12/4/2007.
We walked around Sinchon midnight, we discovered a white color river, like Milky Way …
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Instrumentation K. Constantikes.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Chapter 2 The process Process, Methods, and Tools
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
PSR J1400 – 1410 Jessica Pal Rowan County Senior High School Introduction Data Analysis Summary Acknowledgements Results A pulsar is a rapidly rotating.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
The jet of Mrk 501 from millions of Schwarzschild radii down to a few hundreds Marcello Giroletti INAF Istituto di Radioastronomia and G. Giovannini, G.
Chapter 16 The Milky Way Galaxy 16.1 Overview n How many stars are in the Milky Way? – About 200 billion n How many galaxies are there? – billions.
WVU Senior Research Projects
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Masses of Galaxy Groups Brent Tully University of Hawaii.
GWDAW - Annecy December 17 th 2004 LIGO-G Z1 Searching for gravitational waves from known pulsars Matthew Pitkin for the LIGO Scientific Collaboration.
December 3-4, 2003 Green Bank GBT PTCS In Progress Review Future Development Program Kim Constantikes, Richard Prestage.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array FPGA Spectrometer.
Pulsar surveys at Arecibo and Green Bank David Champion Gravity Wave Meeting, Marsfield, Dec 2007.
An Integrated Program for GBT Focal Plane Array Development Steven White Based on discussions with: Rick Fisher, John Ford, Matt Morgan, Roger Norrod,
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array GBT Control System.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Large Area Surveys - I Large area surveys can answer fundamental questions about the distribution of gas in galaxy clusters, how gas cycles in and out.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Out of Focus (OOF) Holography for the GBT Claire Chandler.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Overview of the High Frequency Observing System Richard Prestage.
Searching for Gravitational Waves from Binary Inspirals with LIGO Duncan Brown University of Wisconsin-Milwaukee for the LIGO Scientific Collaboration.
December 3-4, 2003 Green Bank GBT PTCS In Progress Review EMS/LRF Update Richard Prestage.
Software Engineering1  Verification: The software should conform to its specification  Validation: The software should do what the user really requires.
UNIT 1 The Milky Way Galaxy.
Our Milky Way Galaxy. The Milky Way Almost everything we see in the night sky belongs to the Milky Way. We see most of the Milky Way as a faint band of.
The Green Bank Telescope Frank Ghigo, National Radio Astronomy Observatory 7 th US VLBI Technical Meeting, Haystack, Nov 2009.
SPIE – June 25, The Details….. SPIE – June 25, Previous Focus Tracking Curves.
Astronomy 1143 – Spring 2014 Lecture 21: The Evidence for Dark Matter.
20 June 2006 Green Bank GBT Performance Dana S. Balser.
January 6, 2005 URSI Nation Radio Science Meeting, Boulder, CO. Pointing and Focusing the GBT K. T. Constantikes NRAO Green Bank.
WVU Astronomy / Engineering and The Green Bank Observatory Richard Prestage Scientist, NRAO.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage, Kim Constantikes, Dana Balser, Jim Condon The GBT Precision Telescope Control.
“Globular” Clusters: M15: A globular cluster containing about 1 million (old) stars. distance = 10,000 pc radius  25 pc “turn-off age”  12 billion years.
1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) Netherlands Institute for Radio Astronomy Astronomy at ASTRON George Heald.
Astronomy 2 Overview of the Universe Spring Lectures on External Galaxies. Joe Miller.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Modern cosmology 1: The Hubble Constant
© 2017 Pearson Education, Inc.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Software Life Cycle “What happens in the ‘life’ of software”
Green Bank Telescope Mark M. McKinnon
Computing Architecture
System Development Life Cycle (SDLC)
Matthew Pitkin on behalf of the LIGO Scientific Collaboration
GBT and other Green Bank Capabilities
Antenna Monitor & Control Subsystem Engineering Requirements
Our Milky Way Galaxy.
GBT Status: Current Observing Capabilities
Gustaaf van Moorsel September 9, 2003
Software Engineering Software Engineering is the science and art of
The Megamaser Cosmology Project
Software Engineering Software Engineering is the science and art of
The Green Bank Telescope: Overview and Antenna Performance
Millimeter Megamasers and AGN Feedback
Presentation transcript:

April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Richard Prestage SPIE, May 2006 The Green Bank Telescope: Science Results and Lessons Learned

2 Overview Brief summary of telescope and performance requirements Lessons learned – or at least identified? Recent Science results

3 The GBT

4 100 x 110 m section of a parent parabola 208 m in diameter Cantilevered feed arm is at focus of the parent parabola GBT optics

5 GBT Size

6 Scientific Requirements

7 14GHz half-power track

8 “Out-of-focus” Holography

9 Surface Accuracy Large scale gravitational errors corrected by “OOF” holography. Benign night-time rms ~ 350µm Efficiencies: 43 GHz: η S = 0.67 η A = GHz: η S = 0.2 η A = 0.15 Now dominated by panel- panel errors (night-time), thermal gradients (day- time)

10 Lessons learned (identified?) Be very aware of system complexity Be wary of scaling up existing designs Pay attention to fabrication, quality assurance, hardware prototyping and testing Development work must clearly lead to concrete, intermediate deliverables Leave some flexibility and agility in your project plan Prototypes will remain in the system forever Plan to replace one sub-system before all the rest are fully in use Have some clearly defined observing modes fully implemented from day one Minimize the number of items to commission at any one time And be prepared for the lengthy commissioning process...

11 Complexity – metrology system Ambitious project to measure and control location and figure of each mirror to 100µm over 100m length-scales in unprotected open-air environment Had high-level system design High-level system design didn’t flow down into M&C implementation Interfaces were defined, but not implemented Extremely high level of system complexity, but little focus on system integration, field deployment, etc. Project was not on critical path to initial operation of the telescope Now have a huge, “cannot back out of existing implementation” problem From a reasonable start, project is now on hold

12 Complexity – software GBT delivered with monitor and control software (largely) complete System delivered with two, incomplete user interfaces; one which could configure the instrumentation but not execute observations, and vice-versa Telescope was extremely difficult to use, even for black belts Not really a software problem, more a requirements and project management problem Individual software components are not that challenging Root cause: lack of a plan for defining observing modes, defining and controlling system complexity Still some issues (latencies and efficiency) a but huge turn-around in about two years, delivering incremental improvements (config tool, then turtle, then full-up Astrid) Project has gone from depths of despair to resounding success

13 Lessons learned Metrology system: currently on hold High level control software: resounding success What was the difference? => s/w system layered and modular => metrology system became an “all-or-nothing” implementation Some lessons: –You have to actively manage system complexity –Define in detail an initial set of observing modes; these will be useful throughout the development process –Sub-projects must have concrete, intermediate deliverables, which tie back in to the critical path of the project (this is different from early integration)

14 Science Highlights - Pulsars Double pulsar system J Most stringent test of GR in the strong-field limit so far (Kramer et al.) Mass-mass diagram summarizing observational constraints on the masses of the neutron staff in the double pulsar system. (Kramer et al.) Globular cluster pulsars The GBT has found at least 57 new globular cluster pulsars since it has been in operation More in only 3 years than any of the other radio telescopes in the world have uncovered in their entire lifetimes Terzan5ad - fastest millisecond pulsar yet discovered: 1.39ms (716 Hz) (Hessels, Ransom et al.)

15 Science Highlights - HI HI (neutral hydrogen) halo of the Milky Way near the Scutum spiral arm 7 kpc from the Sun and 4 kpc from the Galactic center Total mass ~ 1M solar masses energy powering outflow ~ 100 supernova explosions million years old Yurii Pidopryhora, Jay Lockman & Joe Shields

16 super-bubble in our own back yard

17 Distances to H 2 O Megamasers Requires: Detect the best candidates (GBT surveys) Measure accelerations (GBT Monitoring) Assess VLBI calibrators (VLA snapshots) VLBI imaging (VLBA + GBT + Eff) Modeling Goal: 10+ distances to obtain H 0 with better than 3% uncertainty NGC 4258

18 NGC 6323 V = 7772km/s, D ~ 110Mpc for H 0 = 70 (km/s)/Mpc (Work by Braatz et al.)

19 Conclusions GBT is now in reliable, routine operation at frequencies up to 50 GHz => All “phase II” specifications met or exceeded Lessons learned: –Development projects must be tied to main project –Must have concrete intermediate goals which in a real sense tie in to critical path of the whole project –Have an “early science” plan which can make genuine bread and butter use of the telescope while continued development/commissioning is underway –Be prepared for 2-3 challenging years from first light to stable operation, and be prepared for one major sub-system to be replaced The potential of the GBT is fantastic. All commissioning tests to date confirm full 3mm operation is technically within our grasp! Delivery of array receivers to the GBT will increase productivity by further orders of magnitude