Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by.

Slides:



Advertisements
Similar presentations
Information Systems Systems Development Chapter 6.
Advertisements

Facilitated by Joanne Fraser RiverSystems
Information Technology Project Management – Third Edition
PROJECT RISK MANAGEMENT
Project Management 6e..
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Quick Recap. Quick Recap The Project Plan Plan Your Work, then Work Your Plan.
Chapter 3 Managing the Information Systems Project
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Acquiring Information Systems and Applications
Defining the Project CHAPTER FOUR Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Risk Management Chapter 7.
Chapter 3 Managing the Information Systems Project
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Project Management for Public Health Professionals February 2011 David Sabapathy, MD, MBA, PEng Department of Community Health Sciences 3 rd floor TRW.
CHAPTER 19 Building Software.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
Project Management Fundamentals Project Organization and Integration
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
Initiating and Planning Systems Development projects
Project Management Process Overview
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
Project Management for RIM Professionals Last Updated: 3/13/2011 Sarina Arcari, PMP VP Implementation & Product Planning Amerigroup Corporation 3/15/11.
Appendix A Project Management: Process, Techniques, and Tools.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
What’s a Project? AD642. Copyright 2011 John Wiley & Sons, Inc. Why the Emphasis on Project Management? 2 ❑ Many tasks do not fit neatly into business-as-usual.
Acquiring Information Systems and Applications
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
System Thinking and Project Management Process
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Information Technology Project Management
Acquiring Information Systems and Applications
Project Life Cycle.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
CHAPTER 13 Acquiring Information Systems and Applications.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER NINE SYSTEMS DEVELOPMENT AND PROJECT MANAGEMENT CHAPTER.
Develop Project Charter
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Project Management.
Degree and Graduation Seminar Integration Management
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Information Systems Development
Copyright All Rights Reserved by
Software Project Management
Part II Project Planning © 2012 John Wiley & Sons Inc.
Information Technology Project Management
Project Management and SDLC
Presentation transcript:

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by Dr. Derek Sedlack, South University

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Learning Objectives Project Planning, Execution, and Budget Project Monitoring, Control, and Closing System Development Life Cycle Project Management Concepts

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Management Concepts Deliverable – Items that you hand off to the client or management for their review and approval and that must be produced to complete a project or part of a project. Project Portfolio Management (PPM) – Set of business practices to manage projects as a strategic portfolio. Business Case – Identifies an opportunity, problem, or need and the desired business outcomes of the project. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Management Concepts Project Portfolio Management Path Chapter 13 Map proposed projects to organizational strategies. Assess the value that a proposed project brings to the company. Assess the complexity of proposed projects. Prioritize project proposals for project selection.

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Management Concepts Operations vs. Projects Operations – Business as usual Projects – Clearly defined scope, deliverables, and results. – Estimated time frame or schedule subject to a high degree of uncertainty. – Estimated budget subject to a high degree of uncertainty. – Requirement of extensive interaction among participants. – Tasks that may compete or conflict with other business activities. – Risky but with a high profit potential or benefits. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Management Concepts Chapter 13 ScopeTime Project Success Cost Figure 13.3 Project success triple constraint.

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Management Concepts Scope Creep – Project growth is the piling up of small changes that by themselves are manageable but in aggregate are significant. – Contributes to overages in budget, deadline, and/or resources. – Standard project management approaches reduce scope creep. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Management Concepts 1.What is a deliverable? 2.What is the purpose of PPM? 3.What distinguishes a project from operations? 4.What are the triple constraints? 5.How can scope creep contribute to project failure? 6.What identifies an opportunity, problem, or need and the desired business outcomes of the project? 7.What is the approach that examines projects holistically and manages them as a strategic portfolio? 8.What are the items that you hand off to the client or management for their review and approval? 9.What are the three attributes that must be managed effectively for successful completion and closure of any project? 10.What is the term for the piling up of small changes that by themselves are manageable but in aggregate are significant? Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Learning Objectives Project Planning, Execution, and Budget Project Monitoring, Control, and Closing System Development Life Cycle Project Management Concepts

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Planning, Execution, and Budget Project Business Case – Identifies an opportunity, problem, or need and the desired business outcomes of the project. Statement of Work (SOW) – A definitive statement that defines the project plan, but does not offer any options or alternatives in the scope. – After the project plan in the SOW is reviewed, a go or no-go decision is made. Go/No-Go Decision – Formal decision made by PM, sponsor, and appropriate executives and stakeholders. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Planning, Execution, and Budget Chapter Project management key stages and activities.

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Planning, Execution, and Budget Work Breakdown Structure (WBS) – Identifies all work or activities that need to be performed, the schedule of work, and who will perform the work. Milestones – Used to manage the project work effort, monitor results, and report meaningful status to project stakeholders. Crowdfunding – Raising funds for a project from the public, or crowd, via the Web. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Planning, Execution, and Budget Responsibility Matrix – Shows who has primary responsibility and who has support responsibility for the activities listed in the WBS. Gantt Chart – A bar chart that shows the timeline of the project schedule. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Planning, Execution, and Budget Baseline (Master Plan) – Finalized and accepted project plan. – Changed only through formal change control processes. Variance – Any change to the baseline. Crowdfunding – Raising funds for a project from the public, or crowd, via the Web. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Planning, Execution, and Budget 1.If the business case is accepted, what document is prepared? 2.What events are used to manage the project work effort, monitor results, and report a meaningful status to project stakeholders? 3.What is the longest path of tasks through a project? 4.What shows who has primary responsibility and who has support responsibility for the tasks listed in the WBS? 5.What is the type of bar chart that shows the timeline of the project schedule? 6.When the project plan is finalized and agreed to, what is any change to the baseline? Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Learning Objectives Project Planning, Execution, and Budget Project Monitoring, Control, and Closing System Development Life Cycle Project Management Concepts

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Monitoring, Control, and Closing Integrated Change Control – Process helps to manage the disruption resulting from requested changes and corrective actions across the project life cycle. – Required to defend: Approved/rejected change requests Updates to the project plan/scope Approved corrective and preventive actions Approved/validated defect repair Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Monitoring, Control, and Closing Critical Path – Longest path of tasks through a project. Extends the length of the project with delays unless something is done to compensate. Contains critical tasks or activities. Critical Tasks – Tasks or activities on the critical path that must be completed on schedule in order for the project to finish on time. Noncritical tasks – Tasks or activities not on the critical path, but may go critical if delayed enough. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Monitoring, Control, and Closing Chapter Project controls.

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Monitoring, Control, and Closing Project Control – Used to identify when to declare the ongoing project a failure and kill it. Sunk Cost – Money already spent on the project. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Monitoring, Control, and Closing Project Closing and Postmortem – Project closure does not benefit the completed project. – The enterprise and people who worked on the project benefit. – Post-project reviews, or postmortems, identify the reasons the project was successful or not, strengths and weaknesses of the project plan, how problems were detected and resolved, and how the project was successful in spite of them. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Project Monitoring, Control, and Closing 1.What processes help to ensure that the impacts resulting from requested changes and corrective actions are managed across the project life cycle? 2.What is the length of a project? 3.Assuming no changes are made, what happens when a task on the critical path is delayed? 4.What costs should not be considered when deciding whether to kill a project? 5.When are lessons learned from a completed project identified? Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Learning Objectives Project Planning, Execution, and Budget Project Monitoring, Control, and Closing System Development Life Cycle Project Management Concepts

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. System Development Life Cycle System Development Life Cycle (SDLC) – The traditional system development method for large IT projects, such as IT infrastructure or an enterprise system. – A structured framework that consists of a sequential set of processes. – Highly susceptible to scope creep through: Additional feature requests Unnecessary stakeholders Technological change/improvement Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. System Development Life Cycle Chapter 13 Initial Idea Requirements Analysis System AnalysisDevelopmentImplementationMaintenance Objectives Expectations Specifications

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. System Development Life Cycle Requirements Analysis – Deficiencies are identified and used to specify new system requirements. – More time invested in analysis mean greater probability of IS success. System Analysis – Design of the proposed system. Feasibility Studies – Technical, Economic, Legal and Organizational, and Behavioral. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. System Development Life Cycle System Development – Creation based on functional objectives to solve the business problem. Testing – Verification that apps, interfaces, data transfers, etc., work correctly under all possible conditions. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. System Development Life Cycle Implementation – Conversion of the old system to the new system. Parallel: simultaneous transfer Direct: cut off and migration Pilot: test new than roll out Phased: specific components in stages Maintenance – Perform audits to assess capabilities and determine operational correctness. Chapter 13

Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. System Development Life Cycle 1.What are the stages of the SDLC? 2.Why is information system design highly susceptible to scope creep? 3.What can be done to prevent runaway projects? 4.Explain the feasibility tests and their importance. 5.What are four conversion methods? Chapter 13