Low Energy RHIC e - Cooling Meeting Minutes – 12/23/14 1 1. Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,

Slides:



Advertisements
Similar presentations
Measurement of transverse emittances with a Solenoid (for GUN-0.1) - Jens Völker – ( )
Advertisements

EMMA LAYOUT Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov LEReC overview: project goal and cooling approach.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
October, 2009 Internal Review Beam Instrumentation David Gassner.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Developments of the FETS Ion Source Scott Lawrie.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
Meeting Minutes: LEReC DC Gun, Transport Lines, and Dump Installation 2016, May 26, 2016 D. Kayran, A. Fedotov, T. Miller, D. Gassner, D. Weiss, G. Mahler,
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
ECOOL Meeting 03/26/10 1 Electron beam transport for FNAL electron cooler E-cooling is referred as “non-magnetized” OVERVIEW Material is taken from FNAL’s.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Report Technical Director Storage-Ring-Installation Completed
EBTF Design Review Technical Meeting Group
Challenges for FCC-ee MDI mechanical design
Thermal emittance measurement Gun Spectrometer
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
RHIC Magnets for JLEIC Yuhong Zhang May 11, 2018.
MEIC Shifting Magnet Tim Michalski August 6, 2015.
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised, will get out to bid by 1/9/14 if possible. –HF (Matching) Solenoids  Corrector magnets will be separate from the solenoids. These will be conventional frame type magnets.  No bucking coils in HF solenoids.  These solenoids have been finalized by Wuzheng. They have low current density at 76 amps/cm 2, so plan is to design for air cooling –180 deg Dipole  Chamber position in magnet is slide-able 6 cm  Magnet gap is 4 inches (same as 20deg dipoles)

Low Energy RHIC e - Cooling Meeting Minutes – 12/23/14 2 –Beam Line  Magnetic Shielding –2.5 milligauss shielding of beam line required (AF). –Mike Mapes asked whether ion pumps need to be shielded – TBD  Bellows to have RF Shields to inch thickness (JT, MM) –Instrumentation:  BPM’s –These will be small button BPM’s as large produce too much wake field from MPF. –Instrumentation alignment of electron beams to be 150μm. A 50μm alignment is required (WF)

Low Energy RHIC e - Cooling System Design Overview 1.0 Fixed Distance – 4.5M Revised Magnet Angle

Low Energy RHIC e - Cooling Revised Cooling Sections 4 Eliminate 2 of 4 high field (matching) solenoids & PS. Keep 2 high field H & V correctors in matching solenoids (& PS) Stretch cooling sections: same number of low field (compensating) solenoids, correctors, PS’s, and BPM’s. New: Old: Cooling Sections

Low Energy RHIC e - Cooling Compensating Solenoids Requisition Complete 5

Low Energy RHIC e - Cooling Matching Solenoids Matching Solenoid w/corrector 2 required in cooling section w/o bucking coil Corrector 100 Gcm, will be separte Complete drawings Generate SOW 6

Low Energy RHIC e - Cooling 20 o Dipole Magnet 7

Low Energy RHIC e - Cooling 180 o Dipole Magnet 8

Low Energy RHIC e - Cooling 180 o Dipole Magnet Large open 180 o vacuum chamber: are there beam impedance concerns? Should the electron beam path be shielded? Similar issue for 21 o chamber? 9

Low Energy RHIC e - Cooling 10 Beam Dump Line to Vacuum Valve: (4) 20o dipoles 10 cm aperture Or (2) 20o dipoles 10 cm aperture (2) 20o dipoles 6 cm aperture ??

Low Energy RHIC e - Cooling Scope: Cooling Sections 11 Cooling Sections BPM = 16 YAG = 4 Flying wire = 2 Emittance slits = 2 Energy Slits = 2 Recombination Mon = 4 Recombination Monitor Em-SlitYAG Energy Slits Em-SlitYAG Flying Wire Flying Wire BPMs (16) 180 Deg Dipole In from Merger Out to Extraction Blue Ring Au Ion Beam Yellow Ring Recombination Monitor Recombination Monitor Recombination Monitor Questions & concerns include: Energy Slits are 4 & 7m away from 180 deg. dipole. They can move to 4 & 1m away if one slit is built into a 3-position profile monitor. This would require a special design for the profile monitor – but this is a well known technique. Did we decide on 6 YAG Profile monitors AND 2 Flying Wire Scanners in the cooling section, or did the two Flying Wire Scanners replace the two middle YAG Profile Monitors? Do we really want the Halo Scrapers and the diagnostic beam line after the 5-Cell or should they be after the SRF Gun? Are all solenoids in the transport spaced 3m apart?

Low Energy RHIC e - Cooling Scope: Extraction 12 Extraction BPM = 1 YAG = 1 DCCT = 1 Faraday Cup (Beam Dump) Quadrupole From Cooling Sections Blue Ring Au Ion Beam BPM DCCT YAG BLM Cage for loss distribution measurement

Low Energy RHIC e - Cooling Cooling Section BPM’s USE MPF buttons and Vacuum Chamber for Cooling Section 13

Low Energy RHIC e - Cooling Vacuum Chamber/System Requirements: 5” (12.7 cm) OD vacuum chamber, bake-out temperature. No ion pump tees in the cooling section. One RHIC shielded bellows per solenoid Transitions to 10 cm aperture dipole magnets. Dipole magnet vacuum chambers. 6 Profile Monitors, screen size?? 14 Magnetic Shields

Low Energy RHIC e - Cooling Flying Wire?? 15 Flying Wire PM