1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Low Emittance RF Gun Developments for PAL-XFEL
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
1 1. Some recent views ( ) 2 Linac tunnel
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
The Stripping Foil Test Stand in the Linac4 Transfer Line
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Linac4 Status 1 M. Vretenar sLHC public event
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
RF source, volume and caesiated extraction simulations (e-dump)
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Beam Measurements After the Sources at the Ion Source Test Stand Including H 2, N 2 and Kr Gas Injection R Scrivens, Linac 4 10/04/2014 Lots of input from.
PAC Meeting, December 12, Prebys 1 The Problem.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Pulsed Magnet Power Supply Feasibility Study
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Linac4 status and perspectives
The CERN Linac4 history, performance, perspectives
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Superbeams with SPL at CERN
LINAC4 commissioning plans etc.
Report from the 1st meeting of Linac4 Machine Review Committee
Progress towards Pulsed Multi-MW CERN Proton Drivers
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
(Beam) Commissioning Plan
Status of the JLEIC Injector Linac Design
Accelerator Installation Schedule
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster

Problems with the H- source 2  2005: decision to build an RF Volume source based on the DESY design: - no resources for an internal development; - DESY source had high reliability (external antenna, Cesium-free); - higher extraction voltage + improvements to RF generator and matching to achieve higher current: 45 kV, 100 kW for 80 mA (DESY: 35 kV, 30 kW, 30 mA).  June 2009: source started in the “3 MeV test stand”. Extensive measurements at 35 kV.  From May 2010: increase extraction to 45 kV but severe sparking forbids operation. Reason: intense electron beam co-extracted with the H- melts the e ¯ dump (up to > 200 kW instantaneous power in e- beam!). Vaporization (and destruction) of the dump induces sparking. DESY had less electrons (with less voltage) and more H-. A “chemical” reason? extraction electrode

Reaction 3  From July 2010 it was clear that there was no hope to get the Linac4 beam from the original H- source.  Decision: convert the present source to protons and use it to commission diagnostics and LEBT (in 2011), then RFQ and chopper (in 2012). In parallel, start the construction of a new H- source.  Strengthen the source team (J. Lettry, E. Mahner) and find additional funds.  Select an appropriate source type and define a construction roadmap compatible with Linac4 schedule.  Confront the choice and the roadmap with the community → organize an ion source review with external experts. Present measurement set-up after ion source and LEBT (protons)

Ion Source Review 4 Review Committee: Representing the laboratories with more experience in building and operating H- sources.  14 presentations covering all aspects of Linac4 source programme  6 hours for committee discussions  30’ presentation and discussion from the reviewers  Report (still to be delivered…) M. Stockly (SNS,chair) D. Faircloth (RAL) J. Alessi (BNL) O. Tarvainen (Jyvaskyla Univ.) June 7 – 8,

The program to be reviewed 5 (slide from J. Lettry presentation) 1. Extend and improve the source test stand in Bld. 352 (ex-SPL source test stand). 2. Build quickly an improved version of the DESY RF source for L4 commissioning. 3. Build and optimize a Cesiated RF source for L4 2 nd part of commissioning and operation. 4. Study (and build) a magnetron-type source to go to high currents – if needed. 2 test stands, B.357: ion source (+LEBT, diagnostics) B.152: RFQ and chopper testing

More on ion source program 6  Builds on the SLHC-PP EU program (2 years of work on plasma generator at 50 Hz, plasma test stand).  Old SPL test stand transformed in a full source test stand (with HV extraction, LEBT, diagnostics, Cs lab).  Choice of RF surface source builds on existing work and investment on RF volume source and profits of the SNS experience.  New sources are of modular design, 2 units/source, with new and improved power supplies.  Redesign Faraday cage for pulsed power supplies and easier access for maintenance.  Magnetron source as high-current backup (BNL, simple and reliable, but large emittance).

Comments from the reviewers 7 Very important: agreement on the technical choices! i.e. to have again the problem that we had with the DESY source. Extensive 3D simulations give us enough confidence. Important statement ! i.e. try to get as quickly as possible the H- on the test stand High source availability is possible – but not the first years…

Reviewers’ Recommendations 8 Note that Linac4 design current of 40 mA needs 80 mA from ion source (40% chopped, 10% loss). But all present operational beams + some improved LHC beam can be provided with half the current: 20 mA for the linac and 40 mA for the source.

Additional messages from the review 9 - an H- source can be reliable (goal of 99.5% availability) and maintenance can be organized within the standard CERN schedule (short technical stops and longer yearly shut- downs). - using Cesium presents some safety concerns, but is feasible and done routinely in all other laboratories.

10

Linac4 commissioning schedule 11 Start of beam commissioning (3MeV): May 2013 End of beam commissioning (160 MeV): April 2014 (version November 2010) 5 commissioning stages: (on intermediate dumps) 3 MeV10 MeV50 MeV100 MeV160 MeV Linac4 ready : April 2014

Comparison with SNS and JPARC 12 Question: is the Linac4 commissioning schedule realistic ? Compare with SNS and JPARC SNS (2003/04)JPARC (2006/07)LINAC4 Front-end run2.5 months?1 month DTL1 run2.5 months? (done at KEK)1 month DTL 50 MeV run3 months?1 month MeV run3 months2 months4.5 months From DTL1 start to end of commissioning to ~ 160MeV 14 months10 months Comments Mixed installation and commissioning Installation followed by commissioning Most of installation done before commissioning - Linac4 schedule in line with JPARC and 30% shorter than SNS. - JPARC has done more installation before (shorter commissioning). - SNS commissioned at 5 Hz (then 60 Hz), JPARC at 25 Hz → more time than for 1 Hz. (my) conclusion: The Linac4 schedule looks realistic, but there is no margin for compression.

Timeline for connection to PSB 13 Note 1: the goal at start-up is to reproduce the same beams as with Linac2 Note 2: Linac4 connection is a non-reversible operation (requires civil engineering work in Linac2 area for shielding and extensive installation/recabling in PSB). 7 months from the “green light” to start dismounting the PSB proton injection to beam at LHC entrance 3 months hardware modifications 3 months PSB recommissioning 1 month PS and SPS start-up

LHC-independent connection scenario 14 “green light” to dismounting of the PSB injection after successful Linac4 commissioning (April 2014) Beam to LHC December 2014 Important point: what will be the reliability of Linac4 after commissioning? - : it is a new machine… + : for production of the normal beams the top performance is not required (50% of current is sufficient). Putting together the two schedules (Linac4 commissioning & Linac4 connection):

LHC-dependent scenarii for LS1 15 A. “green light” Jan. 2014, Linac4 commissioned only to 100 MeV B. “green light” June 2015, Linac4 commissioned + 5 months reliability run + : Linac4 + PSB available from 2015 (PSB performance + mitigate risk of Linac2 failure) - : a) Risk of reliability/performance issues appearing in the last phase of commissioning b) Injectors have to stop in : Linac4 + PSB available from 2015 (PSB performance + mitigate risk of Linac2 failure) - : a) Start LHC only in 2015 b) Injectors have to stop in 2014.

LS2 connection scenario 16 Present baseline scenario (in my understanding): 1.Keep the Linac4 commissioning schedule (April 2014) → optimum use of resources; 2.Schedule connection to the PSB only in Long Shutdown 2 → time to improve offline reliability and performance and to optimize the connection process → minimum risk, but need to operate in parallel Linac2 and Linac4 for some years; 3.In case of problems with Linac2, be ready from 2015 to an “emergency” connection of Linac4, with 2 possible options: a) with H- and full performance after a 7-month shutdown; b) with protons at 50 MeV after a few days shutdown but with reduced PSB performance.

50 MeV protons from Linac4 17 Preliminary study (mainly A. Lombardi and C. Carli):  The ion source could be rapidly exchanged with a proton source (duoplasmatron Linac2 type, 60 mA – 100  s);  Acceleration of protons in Linac4 to 50 MeV is not straightforward. The fixed-polarity PMQ focusing channel in the DTL requires careful rematching using the EMQs in the chopper line, but it can be done.  50 MeV is exactly the output energy of the DTL → all other RF structures need to be off and detuned (with one CCDTL acting as debuncher).

50 MeV protons from Linac  Physical connection: segment of beam pipe to install, magnet BHZ20 to be turned, some additional shielding (bricks?).  But: beam current is limited to 40 mA by the Linac4 RF, vs. 160 mA from Linac2; however emittance from Linac4 is about 3 times smaller. Pulse length is limited by the proton distributor to about 100  s (Linac4 can make 400  s) → PSB performance will be limited by the lower current.  Recent simulations (V. Raginel, 11.8) compare Linac2 and Linac4 proton injection. With 7 turns injection instead of 2 and longer injection bump fall time looks like we can produce the LHC beam in the PSB with about ~ 37% reduction in intensity (preliminary results, need more understanding).  Lower efficiency to be expected for the high-intensity beams, unless the PSB distributor is changed allowing for longer pulses (Linac4 H- distributor?).

19

Back-up slides 20

Linac4 status – August  RFQ: 2/3 segments completed, 3 rd being brazed. Commissioning expected for end  All 3 prototypes of accelerating structures completed and tested at full RF power.  DTL: Drift tubes and tanks in production, Tank1 expected to be assembled beginning  CCDTL: in construction in Russia, modules 1 and 2 (/7) ready at end  PIMS: production started in Poland.  Klystrons: prototypes (Thales and CPI) expected at end LEP klystrons under test.  Modulators: prototype tested, contract for series construction being placed.  Quadrupoles: PMQs for DTL1 received and tested, for DTL2 and 3 ordered; call for tenders out for EMQs.  Building completed, installation of infrastructure (electricity, cooling, cabling, waveguides) in progress, to be completed by June 2012.

Linac4 status from EVM – Aug11 22 Building and infrastructure Linac systems RFQDTL