Hall A Installation Review John J. LeRose 2/25/2009.

Slides:



Advertisements
Similar presentations
Hall A Collaboration Meeting S. Nanda, June 23, 2005 Hall A Compton Polarimeter For Hall A Collaboration Meeting June 23 rd 2005 Sirish Nanda Thomas Jefferson.
Advertisements

Overview of the GlueX Tagger and Photon Beamline..
Existing Arcs and 4m Dipole Preliminary Design and Safety Review Beam Transport Interface Mike Bevins February 22, GeV Upgrade - Beam Transport.
12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
Hall A 11 GeV Arc Energy Mapping. Mapper in shed = “fixed” NMR to measure B 0 Mapper measures ∫Bdl and B 0 In this configuration the mapper and.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Thomas Jefferson National Accelerator Facility Secretary of Technology Page 1 Jefferson Lab Overview Deb Magaldi Public Affairs
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
7/23/99 NIH/NIGMS Support of Structural Biology NIH individual research grants with crystallography projects (FY 98) –primary: 225 grants, $51M total costs.
Overview of the GlueX Tagger and Photon Beamline..
EIC Compton detector update October 24 th 2014 Alexandre Camsonne.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
ELECTRON MOVING AT CONSTANT VELOCITY
The Hall A Compton Polarimeter Upgrade
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
Starting cost discussion Vladimir N. Litvinenko Brookhaven National Laboratory, Upton, NY, USA Stony Brook University, Stony Brook, NY, USA Center for.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
Y. R. Roblin Hall A beamline and accelerator status.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
Thomas Jefferson National Accelerator Facility Page 1 IPR September 28-30, 2010 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Hall C Compton Polarimeter Working Group Meeting Jefferson Lab August 8, Meeting agenda 2.Compton Polarimeter overview 3.Subsystem status.
Early Career Internal Review Research and development in superconducting detectors and associated electronics for high rates experiments. Study of radiation.
Thomas Jefferson National Accelerator Facility Page 1 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab September 22-24, 2009 Physics.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy The Department.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Electronics for GEM R&D at the University of Virginia
Alignment of the 12 GeV CEBAF Accelerator
LUSI Coordination with LCLS
Bubble Chamber Planning Meeting
Introduction to Jefferson Lab
Electron Source Configuration
Operations Department
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
View from Lab Management HPS Collaboration Meeting
Hall C Beamline Upgrade
X-Ray Endstations Update
Extraction Michael Bevins May 17, 2007
SOLID Collaboration Meeting
JLEIC Engineering Status
Presentation transcript:

Hall A Installation Review John J. LeRose 2/25/2009

“Installation” work for 12GeV in Hall A Arc dipole calibration extension Møller upgrade to handle 11 GeV Beam Compton upgrade to handle 11 GeV Beam

Thomas Jefferson National Accelerator Facility Page 3 Leave the magnets and mapper alone Just upgrade the arc dipole magnets power supply Cross calibrate 8 arc dipoles and the 9 th using the unmodified mapper* * WBS BEAMLINE - ARC Energy Measurement

Thomas Jefferson National Accelerator Facility Page 4 Add quadrupole Q1’ New field-exclusion insert Raise detector by 100 mm WBS BEAMLINE - Møller Polarimeter

Thomas Jefferson National Accelerator Facility Page 5 11 GeV upgrade builds on 6 GeV changes (infrared to green laser) Raise D2, Optical Cavity, Photon Detector, & D3 by 82 mm Rebuild vacuum line Add motion mechanism to electron detector WBS BEAMLINE - Compton Polarimeter Done

Thomas Jefferson National Accelerator Facility Page 6 WBS Construction Schedule FY2009FY2010FY2011FY2012FY2013FY

Thomas Jefferson National Accelerator Facility Page 7 Arc Energy Calibrations Schedule and Manpower Calibration effort involves multiple moves of the 8 arc dipoles interchanging with the 9 th magnet. Time/Manpower Estimate: Work begins Q3 FY 11 (6 mo “down before the down”) 2011 Electrical Technician2 MW Mechanical Technician15 MW Staff Scientist12 MW Paid University Staff12 MW Paid University Students15 MW

Thomas Jefferson National Accelerator Facility Page 8 Møller Manpower and Schedule Bulk of the work is done in 2012 with some trickle over into 2013 Time/Manpower Estimate: Electrician1 MW Electrical Tech1 MW Staff Scientist3 MW1 MW Computer Scientist1 MW Visiting Users3 MW1 MW

Thomas Jefferson National Accelerator Facility Page 9 Compton Manpower and schedule Preliminary work starts in 2011 with the bulk in 2012 and some trickle over into Electrician3 MW1 MW Electrical Technician1 MW2 MW1 MW Mechanical Technician21 MW7 MW Staff Scientist3 MW5 MW2 MW Paid University Staff2 MW 1 MW Paid University Students4 MW5 MW1 MW

Thomas Jefferson National Accelerator Facility Page 10 Detailed Schedules Compton/Møller Arc Magnet Calibration