EU LIFE programme Bringing peatlands back to life João Pedro e Silva LIFE Nature & Biodiversity expert Neemo - Aeidl Athlone -29th September 2015.

Slides:



Advertisements
Similar presentations
Conservation AQA A2 Biology Unit 4 Populations and energy.
Advertisements

The LIFE Integrated Projects
Evaluating NSRFs with regards to preserving biodiversity and maintaining favourable conservation status of species and habitat types of.
The purpose of restoration - a regulatory overview Lorna Harris (SEPA Wetland Ecologist) January 2011.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Managing wetlands for wildlife and people Tricia Henton 19 April 2010.
ADMINISTRATION OF LAKE RESTORATION AND WATER RESOURCES IN FINLAND 1.Lakepromo seminar Kuopio Division Manager Markku Maunula The Finnish.
EU FUNDING OF NATURA 2000 Graham Bennett. PHARE PROJECT CZECH REPUBLIC Implementation of Natura 2000 ● March 2004–September 2005 ● Main partners: – DDH.
PART 2: THE SUB-PROGRAMMES AND TYPES OF INTERVENTION LIFE presentation1.
Integrated Projects Spetember 2013 Maja Mikosinska DG Environment European Commission.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
1 SURF to Biodiversity 2020 Maria Tiefenbach Environment Agency Austria.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Natura EU ambitions for a coherent ecological network State of Play and Challenges Saskia Richartz Institute for European Environmental Policy.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Boreal Natura 2000 Workshop Helsinki Ministry of Environment January 2012 Dr Roger Catchpole MIEEM Director - Aspen International Honorary Fellow.
Agenda item 3.1 (d) LIFE – proposals on Invasive Species CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
Conservation of Breeding Curlew in Ireland Dr Anita Donaghy Senior Conservation Officer, BirdWatch Ireland.
Expert Group on Natura 2000 Management Meeting of 19 May 2011 Fact Sheet on Member State Natura 2000 Management Planning THE N2K GROUP.
Restoration of Afforested Peatlands across Europe EU LIFE – Rebuilding Ireland’s Natural Capital 29 Sep 2015.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Agenda item 4.B Green Infrastructure CGBN Co-ordination Group for Biodiversity and Nature 8 th meeting – 22/06/10.
Connectivity between protected areas as an adaptation strategy for biodiversity conservation An Cliquet - Ghent University Kris Decleer – Research Institute.
Management planning, conservation and restoration of Natura 2000 sites Suzanne Nally, NPWS, DAHG Suzanne Nally National Parks and Wildlife Service 6 May,
Monitoring Expert, NEEMO GEIE
Break-out group discussion
An Action Plan for nature, people and the economy COM(2017) 198 final Nicola Notaro Head of Unit Unit D.3 "Nature Protection" DG Environment Tallinn.
Expert Group on the Birds and Habitats Directives (NADEG)
The LIFE program 13th Meeting of the Marine Strategy Coordination Group (MSCG), Brussels, 13/05/2014 Dørte PARDO LÓPEZ DG Environment, Unit E.3 European.
The Natura 2000 Biogeographical Process in its strategic context
Guidance on Natura 2000 and Forests – Scoping Document
Pilot Boreal Natura 2000 Workshop
Guidance on Natura 2000 and Forests – Scoping Document
EU Biodiversity Strategy to 2020 Towards implementation & monitoring
European Commission – DG ENV
Feedback on the marine Natura 2000 biogeographical seminar
The Natura 2000 Biogeographical Process
FINANCING.
Bruxelles, 3rd October 2012 LIFE11 NAT/IT/00044 GESTIRE
Task 1.2 Review existing and new financing instruments relevant for MSFD implementation.
Workshop with the 8 PAF related Proposals & the Habitats Committee
Prioritised Action Frameworks for financing Natura 2000
A new financial instrument
Natura 2000, Natura 2000 Action Plan & Biogeographical Process, water challenges Ctibor Kocman ENV D.3 Nature Protection nt Sarród, 15/11/2017nt.
Financing Natura 2000 in the next MFF
New PAF format for Presentation & next steps
Natura 2000 Seminars Atlantic Biogeographic Region Workshop
Welcome to the 2nd Mediterranean Natura 2000 Seminar Limassol, Cyprus November 2017 A milestone event of the Natura 2000 Biogeographical Process.
DG Environment, Nature Protection Unit (D3)
MedWetRivers LIFE+ Naturaleza 2011
Expert Group on the Birds and Habitats Directives “NADEG”
The new LIFE Programme Marine aspects
Green Infrastructure and Natura 2000
on the way to designate SACs…
Prioritised Action Frameworks for Natura 2000 EU co-financing of conservation measures LIFE+ PAF Workshop Brussels, 3 October 2012.
Boreal Natura 2000 Seminar, Hämeenlinna, 29 May 2012
Preparatory Workshop of the Pilot Boreal Natura 2000 Seminar
When and how to best consider the provision of the Habitats directive
Opportunities for financing Natura 2000 in the next MFF
PAF and EU-money for Natura 2000: the German experience
Commission proposal for a new LIFE Regulation CGBN meeting
The – new – LIFE program (Integrated Projects)
Natura 2000 management group Brussels, 19 May 2011
CGBN Co-ordination Group for Biodiversity and Nature
Green infrastructure developments at EEA 2018
New Biogeographic process
What does it mean to have a forest in a Natura 2000 area?
Towards a prioritised action framework for financing Natura 2000
CGBN Co-ordination Group for Biodiversity and Nature
Presentation transcript:

EU LIFE programme Bringing peatlands back to life João Pedro e Silva LIFE Nature & Biodiversity expert Neemo - Aeidl Athlone -29th September 2015

The Nature and Biodiversity strand should contribute to the implementation of EU’s policy and legislation on nature and biodiversity and support further development and implementation of the Natura 2000 network. Since 1992, LIFE Nature (now Nature and Biodiversity) has co- financed more than projects, providing some €1.5 billion EU co-funding and mobilizing a further €1.3 billion in other public and private contributions. This continuous source of targeted financing has radically changed the capacity of many countries and regions to protect and manage Natura 2000 network sites. LIFE Nature & Biodiversity

LIFE Programme structure Priority areas, Thematic priorities, Project topics

Priority area Nature and Biodiversity LIFE sub-programme for Environment, including as priority areas (previous strands) environment and resource efficiency, Nature and Biodiversity, and governance and information Thematic priorities NATURE – activities (Natura 2000) aimed at improving the conservation status of habitats and species; activities in support of the Natura 2000 network bio-geographical seminars; integrated approaches for the implementation of prioritised action frameworks (PAFs) Thematic priorities BIODIVERSITY – activities for the implementation of the Union Biodiversity Strategy to 2020

7110 Active raised bogs

7130 Blanket bogs (* if active bog)

Activities - damaging actions– effects

Bogs concrete conservation actions habitats LIFE projects main objective : Bog restoration Improving the conservation status (targeted species and habitats) Concrete conservation Actions: Restoring the hydrology of the bog (including water quality); o Restoring the ecological value of the bog vegetation and/or increasing its o biodiversity

Restoring the hydrology of the bog Blocking drainage ditches: Light blocking – peat or wood, plastic piles “heavy” blocking – building dams, large steel blocks

Results – LIFE Nature project (Germany) Rosenheimer Stammbeckenmoore

Restoring the ecological value of the bog vegetation and/or increasing its biodiversity Removing vegetation (tree and scrub removal) Removal of Molinia Transplanting of Sphagnum (special after peat extraction or erosion) Sod cutting Pond creation (for invertebrates, amphibians and birds) Grazing and/or Mowing (to avoid overgrowth)

Betula removal - Denmark

Sphagnum beds– UK (MoorLIFE Project)

LIFE projects actions failures Not involving all the stakeholders Failing to buy land that led not to develop restoration actions Fail to implement compensation or swap schemes (e.g. peat extraction or water) Low timber value Lack of monitoring actions (e.g. Conservation status

Thank you! João Pedro Silva LIFE Nature & Biodiversity expert Astrale Aeidl