10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Run Plan Document E04-007: Threshold Pion Production.
The MAD chip: 4 channel preamplifier + discriminator.
J/  measurement with the PHENIX muon arms in d-Au interactions at √ s NN = 200 GeV David Silvermyr, LANL APS April Meeting Philadelphia, April 5-8, 2003.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
8/7/2014 PHENIX WEEKLY PLANNING August 7, 2014 Don Lynch 1.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware and Analysis Status Brief overview of muon arm Physics goals-->implied performance requirements Status.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Performance of PHENIX High Momentum Muon Trigger.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
G. Carboni for the Muon Group
ScECAL+AHCAL+TCMT Combined Beam FNAL
Seyoung Han / Ewha Woman’s Univeristy
Presentation transcript:

10/2/2002MJL - MuTr DC Report Muon Tracking Status South North

10/2/2002MJL - MuTr DC Report South Arm HV tested for 2 days at operating after roll-in. - ok except for ~10 channels in station-1 FEE resting, but was working well last time it was turned on (about 4 weeks ago). Noise levels looked good: 1.63 (sta-1), 1.91 (sta-2), 1.85 (sta-3). Optical alignment beams maintained their position from before the move

10/2/2002MJL - MuTr DC Report RMS noise levels in South Arm Want less than 2 ADC counts in order to achieve 100  m resolution Looks good; particularly station-2 which is much better than last year 1.63 (sta-1), 1.91 (sta-2), 1.85 (sta-3) station-1 station-2 station-3 Station-2 South during run-II

10/2/2002MJL - MuTr DC Report North Arm All noise levels now good, even station-3 (see following slides) FEE ok except sta2/oct1/ch2 – may be fixed(?) HV problems: ~10 high-current channels in sta-1 (probably capacitors); unrepairable ~3 high-current channels in sta-3; capacitors pulled last night – may be ok(?) One broken anode wire in a plane of station-2 and –3 (1/6 of a gap in station-2 & 1/10 of a gap in station-3) Worry about un-calibrated HV values for our 1469 supplies given known problems with muID 1471’s; being investigated Optical alignment system for North still being adjusted, but so far working well Planned Schedule: 10/3?: Begin scaffolding removal 10/10?: Begin installing lampshade panels 10/16?: Closed ? Delay due to beam vacuum problems?

10/2/2002MJL - MuTr DC Report RMS noise levels in North Arm Need less than 2 ADC counts in order to achieve 100  m resolution All stations quite good; average rms noise levels : 1.5 (station-1), 1.5 (station-2) and 2.1 (station-3) Main improvements in station-3 noise levels from: Ground HV cable-shield ground only at chamber end Cover surfaces of chambers with 1 mil Al-foil RF shielding Various other grounding improvements also contributed, but at a lower level station-1 station-2 station-3

10/2/2002MJL - MuTr DC Report Improvement in station-3 North noise levels by adding Al-foil RF shielding Average RMS (ADC cnts): 3.5(before) --> 2.1(after) Station-3 copper cladding already there was ~ 0.7 mil Skin depth for 100khz ~ 0.8 mil So adding 1 mil Al approx. doubles RF shielding at 100khz

10/2/2002MJL - MuTr DC Report Electronics channel to strip mapping now done (we think). Initial cosmic ray running started for North using BLT, will become priority after North is closed. Goals include trying to get a handle on geometrical alignment before beam comes. Preparing geometry and codes to analyze North-arm data Bottom step-platform in North still interferes with alignment beams. Problems with operation of camera multiplexer being debugged. Automated calibrations of North & South mostly working which include analysis, zero-suppression update, recording in Objectivity, and updating web results page. Some problems with ArcNet & with Samba mounts of Web area to be investigated. Repairing TX & RX (copper  fiber) transition boards – presently no north RX spares. Some Other  Tr Activities