IE550 2/18/2016 Design for Production in Existing Facilities (DPEF) Richard A. Wysk The Pennsylvania State University IE550 Manufacturing Systems.

Slides:



Advertisements
Similar presentations
Introduction to CAD/CAM/CAE
Advertisements

By Anastasia Lidya Maukar
Chapter 12 GROUP TECHNOLOGY by Dr. Richard A. Wysk.
IENG 471 Facilities Planning
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 13 MATERIAL HANDLING SYSTEMS E. Gutierrez-Miravete Spring 2001.
Flexible Manufacturing Systems (FMS)
CNC Machining in industry. What I will be speaking about Types of CNC machining Some common misconceptions Skills required in industry Job opportunities.
Computer Integrated Manufacturing CIM
Production Technology (IND 006) Preparatory Year, Faculty of Engineering, Fayoum University Dr. Ahmed Salah Abou Taleb Lecturer, Industrial Engineering.
IELM 215 MANUFACTURING PROCESSES LAB 1 MACHINING PROCESS PLANING EXERCISE 8 th Feb, 2006.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 15.
Manufacturing Resource Models IE550 Dr. R. A. Wysk.
Lathe Practice.
Manufacturing Engineering Department Lecture 1 - Introduction
Integrated Product, Process and Production Engineering Dr. Richard A. Wysk Leonhard Chair in Engineering The Pennsylvania State University University Park,
Architectures for Manufacturing Richard A. Wysk IE551 - Computer Control of Manufacturing Systems.
Planning for CNC Operations. Coordination of 5 functions u 1. NC management - shop supervisor u 2. Part programming - programmer u 3. Machine operators.
FLEXIBLE MANUFACTURING SYSTEMS. FLEXIBLE MANUFACTURING SYSTEMS MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS.
MFGE 404 Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y Manufacturing Engineering Department Lecture 7– Flexible Manufacturing Systems.
Boeing STEP Manufacturing Program NASA’s STEP for Aerospace Workshop King G. Yee January 18, 2001.
An Overview of RapidCIM Concepts Richard A. Wysk IE551 - Computer Control of Manufacturing Systems.
Flexible Manufacturing Systems Introduction to FMS/FAS.
Fabrication II By Ryan Sharp and Andrew Keisic. Topics How to machine a simple part. Things to Keep in Mind When Designing Parts Tooling Setup CNC.
Introduction to Computer Aided Process Planning
Flexible Manufacturing Systems
Process Planning and Computer Aided Process Planning
GROUP TECHNOLOGY Chapter 10. GROUP TECHNOLOGY GROUP TECHNOLOGY IS A MANUFACTURING TECHNIQUE AND PHILOSOPHY TO INCREASE PRODUCTION EFFICIENCY BY EXPLOITING.
INDUSTRY DAY TOULOUSE 2006/06/ th ISO TC184/SC4 meeting Industry Day STEP-NC AP-238 Martin Hardwick STEP Tools, Inc.
1 ISE 195 Fundamentals of Industrial & Systems Engineering.
Computer Integrated Manufacturing CIM
Ch 18 Cellular Manufacturing
Chapter 4 Process Design.
Manual Process Planning Manufacturing Processes (2), IE-352 Ahmed M El-Sherbeeny, PhD Spring 2014.
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
Introduction to CAD/CAM
Computer Aided Process Planning (CAPP). What is Process Planning? Process planning acts as a bridge between design and manufacturing by translating design.
Simulation of a Generic Cellular Manufacturing System Using Rockwell Arena Simulation Software This document provides a generic simulation model of a cellular.
Process Layout Chapter 7 July 20, 2005.
Visual Computing Geometric Modelling 1 INFO410 & INFO350 S2 2015
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 8 CELLULAR MANUFACTURING GROUP TECHNOLOGY E. Gutierrez-Miravete Spring 2001.
Framework of a Simulation Based Shop Floor Controller Using HLA Pramod Vijayakumar Systems and Industrial Engineering University of Arizona.
Working with the RAPID-CIM Software Dr. Richard A. Wysk Industrial and Manufacturing Engineering PSU.
Machining: Family of Material Removal Processes  Material is removed from a starting work part to create a desired geometry.
Process planning : Machining processes and parameters used to convert a piece part from an engineering drawing. The act of preparing detailed work instructions.
VISHAL FACHARA ( ) ABHISHEK REVAR ( ) DHRUV BAKORI ( ) SANKET CHANGELA ( ) lathe machine.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Introduction to Computer Aided Process Planning
Machining: Family of Material Removal Processes
Databases and DBMSs Todd S. Bacastow January 2005.
Manual Process Planning
Integrating Product and Process Engineering Activities
Manual Process Planning
DELMIA Master product description V6 for Academia portfolio
Flexible Manufacturing Systems
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
LOGISTICS NETWORK.
Lathe Practice.
Lathe Practice.
Introduction to Production & Operations Management
Introduction to Materials Management
13 Aggregate Planning.
Data, Databases, and DBMSs
Lathe Practice.
Setup Reduction -- Creating More Production Time Dr. Richard A
Flexible Manufacturing Systems
Tolerance interpretation
Manual Process Planning
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

IE550 2/18/2016 Design for Production in Existing Facilities (DPEF) Richard A. Wysk The Pennsylvania State University IE550 Manufacturing Systems

IE550 2/18/2016 Design for Production in Existing Facilities (DPEF) l Given: »a product design, »the expected production requirements for the new product, »a set of production resources and the current configuration (production lines, cells, etc.), and »the expected requirements for the products currently being produced,

IE550 2/18/2016 Design for Production in Existing Facilities (con’t) l Answer the following questions: »Can the new product be produced in the required quantities given the current production allocation? –if so, what are the expected production costs ? –if not, can the current production be reallocated such that all of the production requirements can be met? –if not, can the design be modified to enable production within the current resource structure? –if not, how should additional resources be acquired to meet the production requirements?

IE550 2/18/2016 How it’s done today: Parametric-based Feature Information l Feature information (Intra-feature specifics) »Dimensions »Size Tolerances »Surface Finishes »Geometric Tolerances

IE550 2/18/2016 Product, Process and Production Models l Product Engineering Library of features Feature interactions l Process Engineering Process / Feature links Inter-feature linkages Inter-process linkages l Production Engineering System Specifics Machine Specifics Fixture Specifics Tool Specifics

IE550 2/18/2016 Production Resource Constaints l Geometric Constraints l Machine Constraints l Jig/Fixture Constraints l Tooling Constraints l Process Constraints

IE550 2/18/2016 Key Process Planning Features l Plans based on Feature Precedence Graph l Generates AND/OR Graph l Collects the resource data from Databases l Is independent of Decision Table

IE550 2/18/2016 Example: Threaded hole ( UNF Class 3) l Process alternatives »Drill -> Tap »Drill -> Thread cut »Drill -> Thread form l Process plans »Drill --->

IE550 2/18/2016 Process Planner Design Station Process Planning

IE550 2/18/2016 Processes l SL-20 Turning Center »Facing »Turning »Drilling »Reaming »Boring »Tapping »Threading l VF-0E Machining Center –Milling (Face/end- milling) –Drilling –Reaming –Boring –Tapping –Threading –Engraving (Ball-mill)

IE550 2/18/2016 AND/OR Graph Generator l Creates an AND/OR Graph Representation of a process plan l Fills out Processing Node Information »PNI is used by NC code Generator l Covers MP, MT, MH and AS/RS nodes

IE550 2/18/2016 Example Part Cylindrical Part Center Hole Bolt Holes Contour Thread

IE550 2/18/2016 Process Plans l Shop level plans MT Ml Dr Tr1 MT Tr2

IE550 2/18/2016 Process Plans l Workstation level plans MH VF-3 SL-20 VF-0 MH MT VF-0 Workstation #1 Workstation #2

IE550 2/18/2016 Process Plans (cont.) l Equipment Level Plans (Drilling) Fx Dr1 Dr2 Dr3 Dr4 Tp2 Tp3 Tp4 Tp1 Fx

IE550 2/18/2016 Decision Maker l Contains the hierarchical constraints »Machine »Fixture »Tool »Process »Feature l Can be updated indendent of Process Planner

IE550 2/18/2016 Decision Information

IE550 2/18/2016 IPPE Concept Design ModelProcess Model CAD System Process Planning System Production Analysis System Resource Model Instance

IE550 2/18/2016 Process Planner IBM Compatible Feature Information AND/OR Graph Machines Jigs/Fixtures Toolings Layout Decision Table Design Station Process Planning STEP or STEP-like PSL or PSL-like Manufacturing Resource Model

Resource Model Instance Resource Model Instance Resource Model Instance Resource Model Instance WWW Multi-facility Planning and Analysis Inquiries Production Orders

IE550 2/18/2016 Technological Hurdles l Process Planning »Given a part design, what are the processes, tools, fixtures, etc. required to manufacture the part. All feasible alternatives should be explicitly represented. l Production Planning and Analysis »Given a set of production resources and a set of production requirements with the associated process plans, how should the production be allocated among these resources in order to efficiently satisfy the requirements.

IE550 2/18/2016 Resource Model l A set of definitions and symbolic descriptions that are used to completely describe the individual resources in a facility as well as the possible interactions between these resources. l A resource model instance describes a specific facility and its resources.

IE550 2/18/2016 Production Planning & Analysis l Goal »Determining the optimal allocation of production requirements among geographically distributed manufacturing resources. l Methods »Rough capacity analysis »Detailed facility simulation »Aggregate, multi-facility simulation

IE550 2/18/2016 the time required for setup for an operation (load fixture, retreive tooling, etc.) the time required to load and unload a product for feature operation j (chuck, fixture, etc..) the machining/processing time for feature j tool change time/part idle time due to scheduling control L/UL t j j setup t t j m c t t i L/UL mc = E (t j setup + t j j i + t )t P A j

IE550 2/18/2016 Production time per piece ttt tt p set l/ul mch = + ++ The cost associated with new tooling is also a key consideration for the designer. For low and medium volume products, the cost associated with tooling and setup can dominate the total product cost. Performance Metrics

IE550 2/18/2016 Part p1 -> needs M1,M4 and M3 Part p2 -> needs M2 and M3 M4 M3 M2 M1 Example Layout R1 R2 R3 MT1 M1, M2, M3, M4 - Material Processors R1, R2, R3 - Material Handlers (Robots) MT1 - Material Transporter (Conveyor)

IE550 2/18/2016 l Concept of a manufacturing system resource model [ Wysk, R.A., Peters, B.A., and Smith, J.S., “ A Formal Process Planning Schema for Shop Floor Control ” ] »Resource Model - set of definitions and symbolic descriptions that are required to completely describe all of the individual resources in a facility as well as the necessary interactions between these resources

IE550 2/18/2016 Terminology l Resources (R) : Collection of assets in the facility directed towards the manufacture of the products. Includes equipment, tools, fixtures, transporters, and instruction sets l Locations (L): A precise physical location associated with a port and a part. Locations are used to link the transfer of parts between equipment types. Each location has an owner and a set of clients that can address that location l Ports (P): Ports are nodes in the graph defining the paths parts can follow through the facility (note: Graph shows the connections between the resources in the facilities l Arcs: Show which ports can be directly accessed from a particular port l Facilitator: A device than can move transporters between different ports on the MT system or move parts between a port on a MT system and a port on a MP

IE550 2/18/2016 Example... MP 3 MP 2 MH 1 MT MH 1 Ports, Locations : 1,2,3,4 Facilitator : MH1 Arcs between : 1-2, 2-1, 1-4, 4-1, 4-3, 3-4, 2-3, 3-2 ( represent connections between the resources ) Resources: MP2, MP3 (type MP) MT1 (type MT) MH1 (type MH)

IE550 2/18/2016 DPEF Enabling Technologies l Currently Under Development »WWW infrastructure »Resource model –Details »Process planning tools –Representation model –Planning methods