B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.

Slides:



Advertisements
Similar presentations
Test Automation Success: Choosing the Right People & Process
Advertisements

Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
Using UML, Patterns, and Java Object-Oriented Software Engineering Royce’s Methodology Chapter 16, Royce’ Methodology.
Project Management October 2011 Inf Sys 3810 Information Systems Analysis Fall 2011 Understand Project Management principles.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Initial PEP II Radioactive Waste Disposal Estimate Olga Ligeti August 6, 2007.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II DND Engineering Planning S. DeBarger Accelerator Systems Division.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Project Management Methodology (PMM)
March 23, 2009H.J. Krebs1 BaBar D&D Schedule & Budget Overview H. James Krebs March 23, 2009.
Metal Suspension and Exemption Planning Sayed Rokni, Jim Allan, James Liu, Olga Ligeti, Amanda Sabourov, Joachim Vollaire ES&H Radiation Protection Department.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Overview of Materials Disposition. 2 DOE Moratorium and Suspension Effective in 2000 Moratorium prohibits the unrestricted release for recycling of contaminated.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
Georgia Institute of Technology CS 4320 Fall 2003.
MyFloridaMarketPlace MyFloridaMarketPlace Change Review Board March 19, 2008.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
INL SNF PROGRAM presented to National Spent Nuclear Fuel Program Technical Exchange Meeting November 8 - 9, 2005 Washington, DC presented by R. O. Ramsey.
Today (2/11) Class schedule update & Presentation Forums (10’) Corporate Technology Commercialization- Dr. Thomas Lindner (40’) Developing timelines and.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Copyright 2009 John Wiley & Sons, Inc. Chapter 12 Project Auditing.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
LOCATION NATION PUBLICATIONS Meet Your Location Engineer.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
EGEE is a project funded by the European Union under contract IST NA3 Execution Plan Malcolm Atkinson Director of the National e-Science Centre.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Alessandra CiocioCSAC meeting - January 11, MRC Report Status Schedule.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
Overview of MSBA Building Process and Project Timeline
Project Management Institute
Flooding Walkdown Guidance
Enterprise Content Management Owners Representative Contract Approval
Implementing the Transportation/Land Use Connection Program
Phase 2 Tollgate Review Discussion Template
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
PROJECT DELIVERY METHODS
Phase 2 Tollgate Review Discussion Template
Margin Management Configuration Management Benchmarking Group
J. Seeman Assistant Director for PPA/LCLS
Conventional Facilities (WBS 1
Introduction FY09 Linac Ops Review
Conventional Facilities
Perugia SuperB Workshop June 16-19, 2009
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA

B Factory D&D Review: March 23, 2009 Page 2 B Factory D&D planning status *BABAR D&D and PEP-II D&D are very different projects at very different stages of planning and maturity *BABAR D&D has been in preparation for more than a year and is relatively mature –Funding is in place or planned for project execution FY08-FY12 –Project team is identified, preparatory work has begun in IR-2, and first major D&D steps are about to get underway –BABAR D&D consists of many one-time dismantling steps, with unique tooling and unique in-house expertise required Necessitates early dismantling to take advantage of existing knowledge base before this disappears –Re-use case for components is uncertain, but temporary storage of these components while issues are resolved is also straightforward

B Factory D&D Review: March 23, 2009 Page 3 B Factory D&D planning status *Planning for PEP-II D&D is just getting underway in FY09 at minimal budget levels –Project team is not yet identified and limited funding exists for project planning in PPA budget projections for FY10-FY11 –Once PEP-II is brought to a minimal maintenance state, valuable components can be safely stored in the present location No immediate demand for tunnels before PEP-X Project Re-use cases do not require components before 2013 –Dismantling is largely an industrial operation, probably best executed with an outside contractor Large number of repeated operations, with existing and routine procedures for handling accelerator components In-house knowledge continues to reside within Accelerator Systems and ETS Divisions Storing components on-site in light of the metals suspension requires significant planning and preparation –We are defining PEP-II D&D scope as technical components, leaving buildings and tunnels intact including utilities, lighting and cable ways

B Factory D&D Review: March 23, 2009 Page 4 Baseline plan for PEP-II D&D *FY09-FY10: PPA manages initial planning effort while re-use cases are resolved –Develop refined budget and planning baseline, including offsite engineering participation in D&D effort, packing and transportation costs, contractor costs for removal of components, and costs for new building as an on-site storage solution –Negotiate with potential recipients of PEP-II components for re- use to understand required interfaces and schedules, and shared funding scenarios –Manage development of possible protocol for exemptions to metals suspension in connection with BABAR D&D project, with evaluation of implications for PEP-II component disposal scenario –Evaluate project options with CD-1 review at the end of FY2010 Will have firmer understanding of re-use needs, cost implications, and on-site space requirements for new storage building

B Factory D&D Review: March 23, 2009 Page 5 Baseline plan for PEP-II D&D *FY11-FY12: Develop project team and detailed project execution planning –If there is significant re-use of components for HEP-related projects, continue PPA management of project development –If there is no significant re-use planned, turn over management of the PEP-II D&D project to ETS or equivalent lab technical services division –Plan for CD-2 review at the end of FY11 and CD-3 in FY12 –Begin construction of storage building in FY12 *FY13-FY14 –Execute PEP-II D&D project under PPA (re-use scenario) or lab- operations (no re-use scenario) management –Complete storage building in FY13 –Use contractor to remove components from tunnel, dispose radioactive waste & store suspension material in on-site building

B Factory D&D Review: March 23, 2009 Page 6 B Factory MMS/D&D budget In a SuperB + Project-X re-use scenario, and assuming exemption from the metals suspension, BABAR + PEP-II D&D would be reduced by ~$15.5M

B Factory D&D Review: March 23, 2009 Page 7 Structure of review talks *PEP-II introduction, MMS status, and initial estimates for D&D scenarios: Mike Sullivan, John Seeman *BABAR introduction, MMS status, D&D planning, materials handling, schedule and budget: Bill Wisniewski, Jim Krebs *Review of re-use requests: David MacFarlane, Umberto Dosselli (INFN) and Jim Kerby (Fermilab) *BABAR safety planning: Craig Ferguson, Frank O’Neill *BABAR materials disposition issues and metals suspension planning: Sayed Rokni, Joachim Vollaire, Amanda Sabourov, Olga Ligeti *Tour: Today from 1:00-2:00 including IR-8 and IR-2