By: Matthew Forbes DO 1: PROJECT MANAGEMENT.  Taking last weeks do 1 to the next level  Duration and completion  Planned expenses  To be able to know.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
Project Management and Leadership. Why care about management? 10% of projects were “successful” between 1998 and 2004.
Network Analysis. COPYRIGHT TOM SULZER © 2015 A (4) B (3) G (8) C (5) H (12) D (3) F (4) E (6) Network Analysis  Determine the activity slacks  What.
Project Planning. Learning Objectives: By the end of this topic you should be able to:
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
1 TenStep Project Management Process ™ PM00.3 PM00.3 Project Management Preparation for Success * Manage the Workplan *
Solutions to Chapter 12 Exercises
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Workshop-3 Gantt and Pert Chart.
Earned Value Management
Prosjektstyring bma ACTIVITY A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
Project Management Methodology Project monitoring and control.
Quick Recap Monitoring and Controlling. 2 Control Project Cost.
Understanding Earned Value Analysis
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
4.05 Implement Accounting Procedures To Track Money Flow And To Determine Financial Status. Describe the nature of income statements.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
© The McGraw-Hill Companies, Software Project Management 4th Edition Resource allocation Chapter 8.
EARNED VALUE MANAGEMENT (EVM)
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
6.3 Your Budget Worksheet. Section 6.3 Your Budget Worksheet  Goals: Identify steps you should take to create a budget worksheet. Explain common problems.
Production Planning and Control
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
ELC 347 project management
Tm&i 2010 VII.1 technology management & innovation introduction to project management (iii) reviewing & operating projects.
Produced by: KPI’s for Measuring & Controlling STO Projects E.J. (Ted) Lister Lister Management Inc.
MEASURING THE FINANCIAL POSITION OF A PERSON “WHO IS BETTER OFF???” Introduction to Personal Finance.
College of Information Systems & Technology © 2001 University of Phoenix. University of Phoenix is a registered trademark of Apollo Group, Inc. in the.
Project Scheduling Software
WEEK 1 You have 10 seconds to name…
Copyright 2012 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
Project Management.
Project Scheduling Class 7.
Learning PMP Formulas the Easy Way
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
FINANCIAL PLANNING Notes. Financial Planning in Business Financial questions never go away… Beginning a Business Where will you get the money? How much.
Indicator 2.03 Implement accounting procedures to track money flow and to determine financial status.
Schedule Control (Earned Value)
Time-Cost Trade-off Models
DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P , Chapter 13 Process and performance Measurement and Evaluation, Project Management.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
CHAPTER:7 Project Cost Management
Project Major Activities Over Next Days (as of xx/xx/xx)
Business Decision Making
5. Cost resources & PLAN DURATION
Earned Value - What is it
Understanding Earned Value Analysis
Project Management 9. Performance Management
Understanding Earned Value Analysis
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
HCIS 410 ASSIST Education for Service- -hcis410assist.com.
Monitoring and Reporting Project Progress
Earned Value Measures Planned Value (PV) Earned Value (EV)
Project Management: Monitoring Scope, Schedule, Cost Quality, Communications Professor Akhilesh Bajaj The University of Tulsa ©Akhilesh Bajaj 2013.
5. Cost resources & PLAN DURATION
AQR Unit 7 Discrete Mathematics
Project Management Metrics
Grading Components Component Percentage Exam 1 20% Exam 2 Exam 3
Uncertain activity duration (P14)
Uncertain activity duration (P14)
Understanding Earned Value Analysis
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

By: Matthew Forbes DO 1: PROJECT MANAGEMENT

 Taking last weeks do 1 to the next level  Duration and completion  Planned expenses  To be able to know more systems, I used Merlin PURPOSE

SCHEDULE

 ?- indicates this is an estimation and not net completed  Only A-C have been completed  The total duration is 65 days SCHEDULE EXPLANATION

 The critical Path is  A-B-D-E-F-H  Before work started C was on the critical path in the place of A  A’s work took 4 weeks (not 2)  C’s work took 3 weeks (as expected) CRITICAL PATH

PERFORMANCE

 Total expected duration is 17 weeks  2 weeks behind schedule  A took 1 week longer than C  B took 1 week longer  Expected duration for activities D-H is 11 weeks PERFORMANCE

 The critical path can be altered from the duration projection to what the actual completed time  It is important to use Project Management to keep track of any changes  This was the first time we also planned ahead with money INTROSPECTION