Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?

Slides:



Advertisements
Similar presentations
Module Metrology Peter Sutcliffe. Peter Sutcliffe – Module Metrology Wenzel CMM Module Metrology carried out on Wenzel CMM with module jig aligned along.
Advertisements

LHCb Pedestal Assembly Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 LHCb Pedestal Assembly Feet to Base Assembly Paddle Preparation Assembly.
Drilling Machine….
Stave#1 and Handling Frame Profile Metrology Survey Maarten, Coralie, Franck, Didier August 3 rd 2011 NB: Survey metrology done by using the UniGe Mitutoyo.
Geometric Tolerances J. M. McCarthy Fall 2003
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Circular Plates Moments acting on an element of a deformed circular plate.
CMM MTR LBNL Homebrew Assembly Notes Silber
Engineering Graphics Stephen W. Crown Ph.D.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Auxiliary Views In creating the Auxiliary View you measure the distance for the front view to top view.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Introduction to Precision Metrology
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
3.2a: Surface Area of Prisms and Cylinders
Lathe and drilling machines
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
Reconfigurable Inspection Machine (RIM). NFS Engineering Research Center for Reconfigurable Manufacturing Systems College of engineering, University of.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Orthographic to Isometric
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Chapter 4 Creating Placed Features. After completing this chapter, you will be able to –Create fillets –Create chamfers –Create holes –Create internal.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
LATHE OPERATIONS The various operations that can be performed on a lathe are: Turning. Step turning. Taper turning. Thread cutting. Facing. Knurling Chamfering.
Lathe and drilling machines
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
SCT Endcap Module Initial Alignments Using Survey Data Paul S Miyagawa University of Manchester.
Bench micrometer.
Analysis of Metrology Data from First Two Small Disks Stephen Pate 5/11/111.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Slotting machine (SLOTTER)
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Adrian Allen Steven Lona Nicholas Tracy Ideas-Unlimited.
Chapter 4 Creating Placed Features. After completing this chapter, you will be able to –Create fillets –Create chamfers –Create holes –Create internal.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
……………..Continued Recap Grinding Machine Operations on grinding machine 1.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Equations of Straight Line Graphs. Graphs parallel to the y -axis All graphs of the form x = c, where c is any number, will be parallel to the y -axis.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
9-4 Compositions of Isometries. Isometry: a transformation that preserves distance or length (translations, reflections, rotations) There are 4 kinds.
9-4 COMPOSITIONS OF ISOMETRIES. Isometries Isometry: transformation that preserves distance, or length. Translations, reflections, and rotations are isometries.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
Drilling Machine… MATROJA PRITENDRASINH K. GUIDED BY: PROF.N.K.PRAJAPATI BE SEM 3 RD MECHANICAL SUB:MP I.
Introduction to Precision Metrology
Update on module mounting on staves and stavelets 15/3/11
Auxiliary Views Engineering II.
Introduction to Engineering – E10
Reminder of Stave250 Tooling Design
CLIC PMQ High-strength prototype
Methods and Procedure for adjusting eccentric cones in INFN configuration Peter Amnuaypayoat 5/14/04.
(Lecturer in Mechanical Deptt.)
Chapter 4 Auxiliary Views.
University of Wisconsin-Madison
CURVED MIRRORS.
Work Features Work features are tools that help create and position features by providing points, lines, and planes when current geometry is not sufficient.
Work Features Work features are tools that help create and position features by providing points, lines, and planes when current geometry is not sufficient.
Drilling Machine…. Drilling Drilling is the operation of producing circular hole in the work-piece by using a rotating cutter called DRILL. The machine.
Presentation transcript:

Metrology of the Stave250 Assembly Jig (Tim)

What do we need to measure?

Procedure Measure PH2 and define as (0,0) – 4 point: DIA=0.043 / CIRC=0.001 Measure PH1 and define PH2-PH1 as primary axis – 4 point: DIA = / CIRC=0.001 – Distance PH1-PH2 = Measure front edge of 14 Vee-blocks at 4 points along length (See plot) and reconstruct line of best fit – Y= x10 -4 X Measure Tooling ball – ( , ): DIA=8.207 / CIRC=0.011

Vee Blocks

CAD Analysis

Comparison with SmartScope Procedure – Mount jig on Smartscope & reconstruct lines along the edges of the Vee blocks (sub-stage illumination). Construct datum axis – Measure tooling ball as a composite of 3 sub-circles Diameter = / CIRC = – Measure PH1 as a composite of 3 sub-circles Diameter = / CIRC = – Measure distance from Tooling ball to PH1 parallel to Vee-block datum axis – Diameter/2 = – Measure PH1 offset to Vee-block axis

Vee-blocks (CMM vs SmartScope)

CMM Survey with Back-lighting Pin-holes and tooling ball measured with back-lighting to try and improve measurement – Hi-tec torch (Wifi/3G enabled) Results – Pin-holes / mm with 4-point circularity of 0.001mm – Tooling ball 8.205mm with 20-point circularity of 0.025mm

Comparison of CMM Vee-block alignments

Survey with 4mm dowels (CMM#3) 4mm dowels held into Vee blocks with tool-makers clamps. Inner edge of dowels reconstructed using back illumination via reflection from aluminium.

Comparison of Vee-block surveys NB 4mm dowel data offset by mm

Summary ParameterCMMCMM #2CMM#3SmartScope Ref Offset Y Ref Offset Y Dim Y1 to Y Ref Offset X