OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC 23.09.20091MP3 - Frédéric BERNARD.

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
controls Middleware – OVERVIEW & architecture 26th June 2013
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
130 October 2009 PIC - WIC - LHC_CIRCUIT UNICOS PVSS.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
CRYOGENICS AND POWERING
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Industrial Control Engineering UNICOS device and front-end Hervé Milcent UNICOS device front-endHervé Milcent1.
Overview of the LHC cryogenics control system and available data for RAMS FCC studies Benjamin Bradu, CERN, EN-ICE 1 September 2015.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
A. P. AT-CRG, 21 October MP3 21 October 2009 Gas flow control valves for current leads brief overview A. Perin, TE-CRG.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Hardware Commissioning Review, Markus Zerlauth, 11 th July CO deliverables for HWC – lessons learnt and the proposed way ahead Markus Zerlauth,
8 th November 07-OP Workshop Machine Checkout E. VEYRUNES CRYOGENICS 8 th November 2007 OP Workshop Machine Checkout E. VEYRUNES AB/OP 2008 AB/OP CRYO.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Toward UNICOS Major Tasks to be Done Leonid Kopylov TE-VSC-ICM.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
1 15 April 2010: Post Mortem Analysis by M.Zerlauth MP3.1 Markus, Adriaan, Odd, Zinur and many others…
MPE and BE-CO Collaborations  MPE and BE-CO collaborations Jean-Christophe Garnier 01/12/2015 On behalf of TE-MPE.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
UNICOS LHCLoggingDB Josef Hofer EN/ICE/SCD. Agenda The LHC Logging Database Purpose of the LHCLogging component Basic concepts Advanced concepts Logging.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
QPS high level controls LabView tools, an overview.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Systems, their relations & information. Concepts and Status of the new central service for tracking relations between CERN accelerator systems TE/MPE TM.
Maria del Carmen Barandela Pazos CERN CHEP 2-7 Sep 2007 Victoria LHCb Online Interface to the Conditions Database.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
SCADA & Monitoring Developments for Vacuum
R. Denz, A. Gomez Alonso, AT-MEL-PM
Markus, Mathieu, Enrique, Rudiger, Serge
CV PVSS project architecture
MP3 Review Software tools
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
Powering from short circuit tests up to nominal
Presentation transcript:

OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD

The PVSS systems involved in the hardware commissioning The Circuit Synotics with CRYO data The QPS & nQPS applications The PIC application Outline MP3 - Frédéric BERNARD

PVSS applications overview QPS FECs … QPS & nQPS PVSS Servers CIRCUIT PVSS Server PVSS CIRCUIT Clients PIC PVSS Server FGC FECs PVSS PIC Clients QPS OK PIC PLCs TOP / LHC Control / LHC Machine Interlocks / PIC - Powering Interlocks system TOP / HWC / Circuit Synoptic CMW PVSS CCM LHCOP CRYO PLCs CRYO PVSS Servers PVSS CRYO Clients TOP / HWC / Cryogenics MP3 - Frédéric BERNARD

Sequencer - PVSS applications QPS FECs … 8 QPS & 8 nQPS PVSS Servers CIRCUIT PVSS Server PIC PVSS Server PIC PLCs Global Lock from SIS Monitor CIP status + Cmd Close switch Snapshot Zero calibrate Reset DQAMGA test mode Monitor agent status MP3 - Frédéric BERNARD

Circuit synoptics - New features nQPS data compatible: In the Powering Subsector view In the Circuit views In the WorldFip views Access Control with NICE accounts CRYO data in the Circuit Synoptics MP3 - Frédéric BERNARD

Get the essential cryogenic signals for each electrical circuit to make available all information required for circuit powering in one single application. It will provide: For each electrical circuit (monitoring only): Cryo Start status Cryo Maintain status CV891 valve sensor for each current lead TT893 for each current lead = temperature at top of CL TT891A for each current lead = temperature at bottom of CL Liquid level LT83x of the DFB Pressure PT83x inside the DFB Temperature TT83x inside the DFB Online trends and correlations of FGC data vs QPS, PIC & CRYO Cryo equipment information (e.g. thresholds etc…) Circuit synoptics - CRYO data MP3 - Frédéric BERNARD

Circuit synoptics - CRYO data QPS FECs … QPS & nQPS PVSS Servers CIRCUIT PVSS Server PVSS CIRCUIT Clients PIC PVSS Server FGC FECs PVSS PIC Clients QPS OK PIC PLCs TOP / LHC Control / LHC Machine Interlocks / PIC - Powering Interlocks system TOP / HWC / Circuit Synoptic CMW PVSS CCM LHCOP CRYO PLCs CRYO PVSS Servers PVSS CRYO Clients TOP / HWC / Cryogenics BE-CO DM Databases Circuit names  Cryo Equipments MP3 - Frédéric BERNARD

Circuit synoptic - CRYO data Development MP3 - Frédéric BERNARD

QPS & nQPS - Features QPS: Only Deadband on LSB for U_QS0 and U_RES -> more data flow in QPS PVSS servers (need more time to retrieve data from trends, LHCLogging etc…) (around 4 Hz) Other data: around 0.1Hz (based on the run in september 08) nQPS: DQAMG type S S12 - S23 – S45 - S56 - S78 Only Deadband on LSB for U_RES and U_MAG: around 4 Hz Other data: around 0.1Hz Data available from the WorldFip views + Profile Graph (2 Hz) U_RES and U_MAG from DQQBS available from PVSS and store in LHCLogging at 0.1 Hz Expert commands (GTW): no yet RBAC EN-ICE and TE-MPE are working on a strategy Will be discussed with BE OP before implementation Macro: Close switch + Reset system = idem the last year Zero Calibrate On (DQAMGS only) -> available for the Sequencer in October Snapshot (DQAMC MB and MQ)-> available for the Sequencer in October MP3 - Frédéric BERNARD

QPS & nQPS – WorldFip view MP3 - Frédéric BERNARD

nQPS - Trends MP3 - Frédéric BERNARD The trend parameters have to be defined

PIC – Features New permission definition (remove the interlock generic accounts) RBAC configuration (Sequencer + SIS + Timing) Masking of signals (e.g. CRYO_START, QPS_OK etc…) Post Mortem from PIC PVSS PIC Super-locks Summary of Locking/Super-locking Global Locking/Unlocking of circuits Automatic Locks from SIS PP60 A MP3 - Frédéric BERNARD

PIC PVSS – main panel MP3 - Frédéric BERNARD

PIC PVSS – PP60A panel MP3 - Frédéric BERNARD

PIC PVSS – Locks list MP3 - Frédéric BERNARD

PIC PVSS – Masks list MP3 - Frédéric BERNARD

PIC PVSS – Global commands MP3 - Frédéric BERNARD

PIC – Post Mortem MP3 - Frédéric BERNARD

Next developments ? Circuit synoptics Split the Circuit view to distinguish the PIC, QPS and Power Converters status QPS RBAC for the Sequencer PIC Panel to display the history of the Super-locks MP3 - Frédéric BERNARD Development

PVSS applications in DIAMON MP3 - Frédéric BERNARD