Eskom MYPD2 Nersa Public Hearings Fri 22 Jan 2010. Doug Kuni – Managing Director South African Independent Power Producers Association.(SAIPPA)

Slides:



Advertisements
Similar presentations
NUMSA presentation on Eskoms Multi-Year Price Determination 2013/ /18 (MYPD3) The Impact of Electricity Pricing on Households and Businesses in the.
Advertisements

Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
March 2009 Emissions Trading in South Africa National Climate Change Summit Emily Tyler.
Creating a Single Electricity Market Across Borders: Pitfalls, Constraints, and Opportunities Paul K Gorecki Economic & Social Research Institute & Trinity.
22 August 2012 Regulating for productive efficiency – an assessment of the regulatory framework faced by Eskom Presented at the South African Economic.
Electricity Supply Industry Reform Strategy and Roadmap Prepared by MEM June, 2014.
Portfolio Committee on Energy Securing financial sustainability (in response to lower tariff decision) May 2013.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Bringing about beneficial change... POLICY DIALOGUE ON CORPORATE GOVERNANCE IN CHINA Presentation by Patricia Leahy, Director, UK National Audit Office.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
ESKOM Special Appropriation Bill ESKOM Subordinated Loan Special Appropriation Amendment Bill Parliamentary Committee on Appropriations Hilton Trollip.
The Role of regulators in Energy security Sergey G.Novikov Head of Federal Tariff Service of Russian Federation Istanbul
+ PROJECT BACKGROUND: KENYA THE NEED FOR CONSUMER PARTICIPATION IN THE REFORMS PROCESS OF THE ELECTRICTY SUB-SECTOR Susanne Rabisch, CUTS Nairobi.
18 September 2012 Independent System and Market Operator Bill. Progress Report on further Due Diligence incorporating transfer of assets.
Response to the Eskom Revenue Application for the Multi Year Price Determination for the period 2010/11 to 2012/13 (MYPD 2) Presentation by Business Unity.
Electricity Industry Deregulation in Taiwan I. Summary of the Framework of Electricity Industry Liberalization in Taiwan.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
The German Electricity Market in the European context Bocconi University Karsten Neuhoff German Institute for Economic Research / Technical University.
Palau Chamber of Commerce Fiber Optic Submarine Cable Project MicroPal Presentation Pramod Thummala (Rhinehart Silas) (Keobel Sakuma) May 12, 2015.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
6.1 Capon: Understanding Organisational Context 2nd edition © Pearson Education 2004 Understanding Organisational Context 2e Slides by Claire Capon Chapter.
1 Presented by: Thembani Bukula Balancing Stakeholders’ Interests 1 WFER May 2015 Istanbul.
Electricity Pricing: Presented by: AT Audat (Acting CD: Electricity) 06 August
CITY OF CAPE TOWN’S SUBMISSION ON ESKOM’S MULTI-YEAR PRICE DETERMINATION – 2010/11 – 2012/13 (MYPD 2) City of Cape Town represented by : Alderman Ian Neilson.
Andrew Staniford Commercial Manager GETTING REGULATION BACK ON TRACK Sept 2003.
Context, Principles, and Key Questions for Allowance Allocation in the Electricity Sector Joint Workshop of the Public Utilities Commission and Energy.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
Regulation and Sustainability A set of tasks and responses – varying by structure and stage Dennis Volk Programme Officer.
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
Towards an Affordable, Stable Electricity Supply MISSION CRITICAL FOR SOUTH AFRICA Public Presentation To NERSA by Nick Holland Chief Executive Officer.
Briefing on Eskom Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
Submission on the cogeneration of electricity 25 July 2013.
The Institute for Municipal Finance Excellence NERSA HEARINGS 20 JANUARY 2010 Eskom’s Revised Revenue Application MYPD 2010/11 – 2012/13.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
15 November 2011 Response to NCCRWP EKC 1 Response to the NATIONAL CLIMATE CHANGE RESPONSE WHITE PAPER 2011 Presented to The Portfolio Committee on Water.
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
IPP and Corruption in Indonesia Fabby Tumiwa Institute for Essential Services Reform 14 th IACC Workshop CLEAN ENERGY 13 November 2010.
Sappi Presentation to NERSA Public Hearing PORT ELIZABETH
AFRICAN MINERALS & ENERGY FORUM BEE Opportunities in the Electricity Industry Parliamentary Portfolio Committee: Minerals & Energy Prepared by: Cingembo.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Presentation to Select Committee on Economic Development
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
A Presentation to the: Portfolio Committee on Minerals and Energy (30 August 2001) Given by: Barry Bredenkamp Bonesa Electricity (Pty) Ltd Efficient Lighting.
1 This project is supported by the European Union 3 rd MEDREG-IMME Seminar Reform and Opening of Maghreb Electricity Markets September 2013 MRA (Malta)
Energy Markets at the Crossroads Illinois State University Institute for Regulatory Policy Studies 12 December 2002 Springfield, Illinois Vito Stagliano.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
NERSA MYPD2 PUBLIC HEARINGS PRESENTATION 20 th January 2010.
MYPD2 APPLICATION 15 OCTOBER 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
DRAFT IRP Public Hearings Presented by Sisa Njikelana
It’s now time for political decisions
NERSA presentation at the PPC meeting held on 24 May 2006
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
Independent System and Market Operator Bill.
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 2 NOVEMBER 2012 IPAP 2012/10.
Mr. Farooq Rahmatullah Energy Expert Group
PORTFOLIO COMMITTEE ON ENERGY, (PCE)   PUBLIC HEARINGS ON ENERGY EFFICIENCY 5 September 2012 Committee Room V475, 4th Floor, Old Assembly Wing Barry.
SOUTH AFRICAN INSURANCE ASSOCIATION
Electricity Price Increase 2008/9
Cogeneration 24 July 2013.
OUTLINE Legislative context, NERSA vision and NERSA mission
Presentation transcript:

Eskom MYPD2 Nersa Public Hearings Fri 22 Jan Doug Kuni – Managing Director South African Independent Power Producers Association.(SAIPPA)

How did we get here? Eskom carries ZERO risk Monopoly structure and regulatory model. Eskom choices and current situation. Where are the IPP’s? Recommendations.

Eskom carries ZERO risk Eskom revenue: R = (RAB*WACC)+Dep+(O&M)+Cf -Previous applications addressed increases in Opex. -MYPD2 addresses new build Opex and Returns(interest on debt,tax,dividends) to enable balance sheet to fund expansions.(D:E) (New assets funded from RetEarnings,debt,equity) -Formula ensures that consumers pay shortfalls. ALL RISK PASSED ON TO CONSUMER and TAXPAYER(Shareholder ).

Monoply structure and regulatory model. Current structure is “open chequebook.” eg: imprudent decisions, bad choices,all increase in costs passed on to consumer – who has no choice. -NERSA is an IMPLEMENTER of POLICY which is made by DoE. Nersa does NOT determine Policy or Structure. -We are where we are: because the consumer has no choice and Eskom has no competition. No institutional model to facilitate entry of IPP’s.

Eskom choices on new Gx CAPEX Options A %BCDEF Eskom IPP’s Max risk to IPP’sMax risk to consumer 1.Each option has Capex plan: (Medupi,Kusile,Ingula) 2.Each option has Funding plan - no idea at decision point 3.Each option has Tariff plan - no idea at decision point Eskom chose maximum risk to consumer with NO IDEA on 2,3.

Where are the IPP’s? IPP’s have been queuing to get into SA market. They saw the opportunities. Low tariffs(unrealistic) and regulatory environment have kept them out. Eskom control of the market has dampened appetite & frustrated IPP’s. If structure does not change, IPP’s will be cautious to engage SA.

IPP required environment: Competition in Gx and neutral Grid. Independent System Operator & Tx Grid. IPP generators bid into SO with PPA Eskom generators structured as stand alone generators and bids on SAME BASIS as IPP’s to SO. Above structure ensures least cost to consumer as generators are dispatched by merit order.

Recommendations. 1.Smooth shocks to tariff by lower hikes, to cushion economic recovery.(35%x3yrs is risking further economic decline post global credit crisis!) 2.The Shareholder CANNOT abscond and should address the funding plan for the current committed Gx plan (not more!). Economic survival is a priority ! (Should I be mentioning this?) 3.Further new Gx capacity taken up by IPP’s. 4.Eskom costs need to be sanitised.(Tariff is funding a lot more than electricity.)

SAIPPA Thank you!