doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 2 Abstract This document has the WG11 presentation to the 802 EC for July Plenary -- Friday’s closing EC Meeting. Revision 2 was presented to the EC. Revision 3 captures the EC motion details.
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 3 IEEE Closing EC Items Bruce Kraemer Chair, IEEE Working Group Jon RosdahlAdrian Stephens IEEE st Vice-ChairIEEE nd Vice-Chair
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 4 P Agenda Items P802.11w – Unconditional to RevCom P802.11n – Unconditional to RevCom P802.11z – Conditional to Sponsor Ballot P802.11p – Conditional to Sponsor Ballot P802.11v – Conditional to Sponsor Ballot P802.11u – Conditional to Sponsor Ballot Study Group Requests: –TVWS SG -- TV White Space Study Group –QoS Man SG -- QoS Management Study Group
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 5 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 6 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom Request the IEEE 802 Executive Committee to forward P802.11w D11.0 to RevCom. P802.11w had a 94% approval on the last Recirculation Sponsor Ballot. There are 6 disapprove voters representing 44 unsatisfied comments. –Working Group vote on the Motion Passed: 55 y, 0 n, 2 a Moved: Bruce Kraemer 2 nd : M. Lynch –14 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 7 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom Item 1 - Date the ballot closed: –IEEE P802.11w initial Sponsor ballot of D6.0 closed Sept 24, 2008 –4 th Sponsor Recirculation Ballot of D11.0 closed June 28, 2009 Item 2 - Vote tally:
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 8 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom Item 3 - Comments that support the remaining disapprove votes and WG responses: w-p802-11w-report-to-the-ec.ppthttps://mentor.ieee.org/802.11/dcn/09/ w-p802-11w-report-to-the-ec.ppt
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 9 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 10 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom Grant approval, to forward P802.11n Draft 11.0 to RevCom. P802.11n had a 91% approval on the last Recirculation Sponsor Ballot. There are 18 disapprove voters representing 80 unsatisfied comments. –Working Group vote on the Motion Passed: 53 y, 1 n, 6 a Moved: Bruce Kraemer 2 nd : James Gilb –14 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 11 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom Item 1 - Date the ballot closed: –IEEE P802.11n initial Sponsor ballot of D7.0 closed Jan. 10, 2009 –5 th Sponsor Recirculation Ballot of D11.0 closed July 3, 2009 Item 2 - Vote tally:
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 12 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom Item 3 - Comments that support the remaining disapprove votes and WG responses : – 000n-p802-11n-report-to-ec-for-approval-to-go-to- revcom.ppthttps://mentor.ieee.org/802.11/dcn/09/ n-p802-11n-report-to-ec-for-approval-to-go-to- revcom.ppt
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot Item 1 - Date the ballot closed: –IEEE z Working Group initial ballot on D3.0 closed 18 Dec –2 nd WG Recirculation Ballot on D5.0 closed 23 June 2009 Item 2 - Vote tally: Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstai n Approve Disappr ove %Appro ve Dec 2008 Technical Letter Ballot for TGz draft 3.0 Initial March 2009 First Recirculation Ballot for TGz draft 4.0 Recirculation June 2009 Second Recirculation Ballot for TGz draft 5.0 Recirculation July 2009 After ballot comment resolution
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. – p802-11z-report-to-ec-on-conditional-approval-to-go-to- sponsor-ballot.ppthttps://mentor.ieee.org/802.11/dcn/09/ z- p802-11z-report-to-ec-on-conditional-approval-to-go-to- sponsor-ballot.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. Third recirculation 24-Jul-09 Interim Meeting 20-Sep-09 Clean recirculation25-Sep-09 Start of Sponsor Ballot19-Oct-09
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot Grant conditional approval, under Clause 13, to forward P802.11z to Sponsor Ballot. P802.11z currently has a 96% approval. There are 8 disapprove voters representing 8 unsatisfied comments. (3 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 52 y, 0 n, 3 a Moved: B. Kraemer 2 nd : David Law –12 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 17 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 18 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot Item 1 - Date the ballot closed: –IEEE P802.11p Working Group initial ballot on D4.0 closed 3 May 2008 –3 rd Recirculation ballot on D7.0 closed 13 Jun 2009 Item 2 - Vote tally: Ballo tID Ballot Close Date TitleBallotTypePool Retu rn %Ret urn Abst ain %Ab stain Appr ove Dis ap pro ve %Appr ove 125May Recirculation Letter Ballot for IEEE p_D4.0 Initial Dec 05, 2008Recirculation Letter Ballot for IEEE p_D5.0 Recirculation Mar 31, 200Recirculation Letter Ballot for IEEE p_D6.0 Recirculation Jun 13, 2009Recirculation Letter Ballot for IEEE p_D7.0 Recirculation
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 19 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot Item 3 - Comments that support the remaining disapprove votes and WG responses p-tgp-request-for-conditional-sponsor- ballot-approval.ppthttps://mentor.ieee.org/802.11/dcn/09/ p-tgp-request-for-conditional-sponsor- ballot-approval.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. –Fourth Recirculation28 Jul 2009 –Teleconferences scheduled for every Thursday starting 13 Aug, 2009 –Interim Meeting20 Sep 2009 –Clean Recirculation02 Oct 2009 –First Sponsor Ballot30 Oct 2009
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 20 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot Grant conditional approval, under Clause 13 to forward P802.11p to Sponsor Ballot. P802.11p had a 85.41% approval on the last WG Recirculation Ballot. There are 27 disapprove voters representing 167 unsatisfied comments. (4 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 44 y, 0 n, 6 a Moved: Bruce Kraemer 2 nd : Tony Jeffree –14 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 21 IEEE P802.11v – Wireless Network Management Conditional to Sponsor ballot
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 22 IEEE P802.11v – Wireless Network Management Conditional to Sponsor ballot Item 1 - Date the ballot closed: –IEEE v Working Group initial ballot on D4.0 closed 19 Dec 2008 –2 nd Working Group Recirculation Ballot on D6.0 closed 12 Jun 2009 Item 2 - Vote tally: Ballot ID Ballot Close Date TitleBallot TypePoolReturn%ReturnAbstain % Abstain Appro ve Disap prove %Approv e Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Initial Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 Recirculation Jul 09Second Recirculation Ballot for Draft 6.0 Post ballot results Recirculation
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 23 IEEE P802.11v – Wireless Network Management Conditional to Sponsor ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. ballot-request-presentation.ppthttps://mentor.ieee.org/802.11/dcn/09/ v-tgv-sponsor- ballot-request-presentation.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. –Third recirculation 24-Jul-09 –3 Teleconferences scheduled: 14 Aug, 1 Sept and 15 Sept –Interim Meeting20-Sep-09 –Clean recirculation 25-Sep-09 –First sponsor ballot19-Oct-09
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 24 IEEE P802.11v Wireless Management Conditional to Sponsor ballot Grant conditional approval, under Clause 13 to forward P802.11v to Sponsor Ballot. P802.11v had a 89.58% approval on the last WG Recirculation Ballot. There are 18 disapprove voters representing 40 unsatisfied comments. (4 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 58 y, 0 n, 2 a Moved: Bruce Kraemer 2 nd : David Law –14 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 25 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 26 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot Item 1 - Date the ballot closed: –IEEE u Working Group initial ballot on D3.0 closed 12 July 2008 –4th Working Group Recirculation Ballot on D7.0 closed 19 Jun 2009 Item 2 - Vote tally: ID Ballot Close Date TitleBallotTypePoolReturn%Rtn Abstai n %AbsApprove Disa ppr ove %Approve July u_D3.0Initial October u_D4.01 st Recirculation February u_D5.02 nd Recirculation April u_D6.03 rd Recirculation June u_D7.04 th Recirculation LB152 Post Ballot vote changes
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 27 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. – Item 4 - Schedule for recirculation ballot and resolution meeting. –Third recirculation 26-Jul-09 –Teleconferences scheduled for Wed and Fri starting 19-Aug-09 –Interim Meeting20-Sep-09 –Clean recirculation 28-Sep-09 –First sponsor ballot21-Oct-09
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 28 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot Grant conditional approval, under Clause 13, to forward P802.11u to Sponsor Ballot. P802.11u currently has a 91% approval. There are 15 disapprove voters representing 121 unsatisfied comments. (3 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 49 y - 0 n – 1 a Moved: B. Kraemer 2 nd : J. Gilb 14 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide WG Requests for Study Groups TVWS SG – TV White Space Study Group QoS MAN SG – QoS Management Study Group
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 30 Motion to create TVWS SG – TV White Space Study Group Moved: Because of its suitability as a primary candidate for a TVWS technology, and in the expectation that the FCC and Ofcom will clarify their requirements for the database in the interim, the WG should begin a Study Group to develop PAR and 5 Criteria documents for approval by the EC at the Atlanta Plenary in November –WNG Results: Rich Kennedy 2 nd : Harry Worstell – 39y - 0n - 15a –WG11 results: TK Tan on behalf of WNG, 2 nd : P. Ecclesine - 77y, 0n, 8a –Ref: Moved: B. Kraemer 2 nd : M. Lynch –14 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 31 July 2009 McCann et al. (RIM)Slide 31 Summary QoS Man SG – QoS Management Study Group With the Action Management frames defined in TGk and subsequent amendments, there is an increasing amount of Action Management traffic, which could lead to contention issues with Voice and Video QoS streams. The proposed SG will create a PAR and 5 criteria to address QoS issues with Management frames. The WNG presentation was given in document 11-09/817r1.
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 32 July 2009 McCann et al. (RIM)Slide 32 Motion to Create QoS Man SG – QoS Management Study Group Request approval by IEEE 802 LMSC to form an Study Group to Address QoS for Management Frames [as described in doc 11-09/0817r1] with the intent of creating a PAR and five criteria.11-09/0817r1 –WNG Results: By: Michael Montemurro; 2 nd : Cam-Winget – 34y -3n -14a –WG11 results: by TK Tan; 2 nd Richard Kennedy - 39y -2n -20a Moved: B. Kraemer 2 nd : T. Jeffree 13 Yes 0 No 0 Abstain
doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 33 References WG Reports: TGw: report-to-the-ec.ppt report-to-the-ec.ppt TGn: to-ec-for-approval-to-go-to-revcom.ppt to-ec-for-approval-to-go-to-revcom.ppt TGz: to-ec-on-conditional-approval-to-go-to-sponsor-ballot.ppt to-ec-on-conditional-approval-to-go-to-sponsor-ballot.ppt TGp: conditional-sponsor-ballot-approval.ppt conditional-sponsor-ballot-approval.ppt TGv: ballot-request-presentation.ppt ballot-request-presentation.ppt TGu: Study Group Links: QoS Man SG: managment-frames.ppt managment-frames.ppt TVWS SG: tvws.ppthttps://mentor.ieee.org/802.11/dcn/09/ wng in-the- tvws.ppt