FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PTF / MOSAIC status R. Dekany January 31, Palomar Transient Factory P48 as transient discovery engine –New, wide-field visible imager (MOSAIC) –New.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
FLAO commissioning with InfraRed Test Camera (IRTC) S. Esposito, G. Brusa, A. Riccardi FLAO system external review, Florence, 30/31 March 2009.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Telescope Integration and Tests Tuesday Afternoon.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
FourStar Status Eric Persson (OCIW) Presented By.
Magellan Planet Finder Spectrograph Jeff Crane (OCIW) Steve Shectman (OCIW) Paul Butler (DTM)
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
LBT Q Engineering and Software Review ENGG Engineering General.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
望遠鏡の運用状況 友野大悟. CAUTION Telescope is becoming unstable.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Report to the SSC Jan 10, Report to the SSC-Jan 10/02Page 2 Key Dates Nov 13-14/01Preship Review Jan 4/02Final review before disassembly Jan 7Start.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Wide-Field Imager for Solar PRobe Plus (WISPR)
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Status of different Parts Budget Summary
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Chapter 22 Building Automation System Retrofit of Existing Systems
Thermal Vacuum Test: Plans and Procedures
Launch and On-orbit Checkout
FourStar 4K x 4K JHK imager
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Presentation transcript:

FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto

1.The following (sub)systems are nearly complete: Hardware and software: Detectors and associated electronics (still missing sync cable) Data acquisition Mechanisms and controller Temperature monitor/control Vacuum monitor LN2 level sense/Autofill system (still has bugs) Data reduction (still needs integration)

Hardware: Vessel, Optics, and filters FakeStar Window air Carts Plumbing and patch panel to be done

Procedures: Vessel assembly/disassembly Focal plane assembly/disassembly Detector alignment Pumpout Wheels encoder alignment Window airflow Cooldown System startup Detector startup - needs automation Gain/linearity/noise/dark Fakestar focus Warmup

Parameters: Readnoise 15 e- (1 CDS) Dark 2 e-/s Image quality < 1 pixel Flexure consistent with model Vacuum 8e-06 torr LN2 hold time 20 hours for shroud dewar, 4 days for detector dewar

2. The following are in progress (90% complete) PSR documentation: Support agreement Technical description Shipping plan Site preparation plan Installation plan Commissioning plan Performance criteria Routine maintenance

Instrument documentation: Overview Details on camera and detectors Observer's cookbook Instrument scientist/specialist's cookbook Locations of engineering documentation - Focal plane, vessel, electronics, etc Spare parts inventory

Commissioning Plan - details to be done Ks Pupil setting plan Telescope interface - dither sequences - focus Flatfields Throughput Backgrounds Standard practice for observations

3. Remaining Issues Process controller bugs Sync cable End-to-end acq/reduction data flow checkout Final detector parameters Final focus test Export license - is in the works Final schedule - depends on above Finish documentation >> Pre-ship review not yet scheduled

Tentative schedule PSR May 11 Warmup ends May 17 One month extra June 17 Packing starts June 17 Packing ends July 17 Ship departs July 26 Ship arrives Sept 17 Shipment arrives LCO Sept 25 Installation starts Sept 26 Installation ends Nov 24 Commissioning (#1) starts Nov 24 Commissioning (#1) ends Nov 30