SEPTA and spares follow-up J. Borburgh for SEpta section.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 20 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits and.
Bar|Scan ® Asset Inventory System The leader in asset and inventory management.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
PS-SPS days, January 18 th, 2006AB/BT Kicker and Septa status and expected performance at the 2006 start-up With input from: B. Balhan, E. Carlier, F.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
MTTR and spare parts policy for BT equipment 23/1/2008 ATC/ABOC days MTTR and spare parts policy for BT equipment BT equipment with long MTTR PSB ISOLDE.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
J. Borburgh, B. Balhan, E. Carlier, S. Damjanovic, L. Ducimetiere, T. Masson, V. Mertens, A. Prost, L. Sermeus.
21 January 2008ATC/ABOC Days, P. Strubin Overview of the main events related to AT equipment in the LHC injector chain for 2007 P. Strubin, on behalf of.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Technology Department. ZS Ion Trap Development G. Raffaele and R.A. Barlow Acknowledgements: B. Balhan, M.J. Barnes and B. Pinget 21/04/2015 TCM: ZS Ion.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
Project Tools TestTrackPro. Made by a small company, SeaPine Software Have used the Issues Management modules for many years to manage changes and bug.
ESS Vacuum Standardization
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
Operating the septa beyond their design specs
CT Hardware Overview and Issues
Summary of Session 6 ATC/ABOC days
IT-4189 Supply and installation of a cryogenic distribution system
(Beam) Impact of MTE on the PS septa
TE-ABT Activities for LS2
Possible causes for SPS ZS2 misalignment
the CERN Electrical network protection system
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
CONSOLIDATION CPS-BL SYSTEM
Interlocking of CNGS (and other high intensity beams) at the SPS
M. Zerlauth, I. Romera 0v1.
Preliminary analysis of PS septum 31 failure August 8th, 2008
ABP/RTL Main RTL Activities for 2007/8:-
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

SEPTA and spares follow-up J. Borburgh for SEpta section

What is and should be traced in general Magnetic septa Complete septa (installed, operational spares, second choice spares) Operational history (# pulses, failures) Coils High current feedthroughs Lifting jigs (certification) Electrostatic septa Complete septa (installed, operational spares, second choice spares) Operational history (failures) HV cables SF6 safety valves for HV generators Lifting jigs (certification) Cathodes HV deflectors HV feedthroughs Protection elements Complete devices (installed, spares)

What is not traced Magnetic septa Striplines (consumable) Electrostatic septa Feedhtroughs Protection elements Absorbing blocks

How and where is it followed-up Depends on operational responsible. Different per accelerator. Different per equipment type (different needs). Mostly documented in Excel files on dfs. Some history on Web pages: AB pages MTF for LHC equipment.

PS complex magnetic elements Operational responsible for LHC back bone: T. Masson General dfs directory: General dfs Operational history per magnet Pulse history and preventive exchange planning WDP Coil inventory Feedthrough inventory Lifting equipment CTF3 and AD equipment less actively followed up

PS complex electrostatic elements Operational responsible A. Prost Some history on Web pages: AB pagesAB pages (obsolete) Remainder on dfs: Complete septa (installed, operational spares, second choice spares) Operational history (failures) HV cablesHV cables (not up to date) SF6 safety valves Lifting equipment CathodesCathodes inventory SEH23 CathodesCathodes inventory SEH31 Anode foil inventory Anode foil inventory SEH23 Anode foil inventory Anode foil inventory SEH31 HV deflectors HV feedthroughs

PS extraction protection elements TPS15 dummy septum – Operational responsible to be determined – Installed in 2014, spare being validated – No follow up as yet

SPS magnetic elements Operational responsible: C. Baud General dfs directory: General dfs directory Magnet inventory Water filters Potentiometer inventory Complete assemblies, including MS, Complete assemblies, including MS, MP Coils

SPS electrostatic elements Operational responsible: B. Balhan General dfs directory: General dfs directory ZS inventory Part inventory (HV component, wires, pot…)pot Operational history (Sparks/Failures) HV cables Pumping Module with BDI equipment Intervention, WDP

SPS extraction protection elements Operational responsible B. Pinget TPST TPSG4 TPSG6 – Global inventory – Spare parts (CC, CFC, Inconel,…) – History

LHC extraction protection elements Operational responsible: C. Boucly TCDQ, TCDS, TCDQM, TCLIM …. Hardware being followed up in MTF

Summary Main items are already followed up Presently a very non-homogenous approach For the future tool(s), principal requirements: – ‘Unit’ inventory – History (failure, # pulses, failure history….) – Spare parts inventory (coils, cathodes, yokes, …) – Preventive exchange planning – Safety related items inventory and validation dates (SF6 valves, lifting equipment).