Development update for BOF 17. Slide 2 CIRIA Arch Manual final draft circulated to SG for comment internal CIRIA review completed returned to research.

Slides:



Advertisements
Similar presentations
Bridge Owners Forum Code of Practice for Bridge Management Research Opportunities Graham Cole s.
Advertisements

Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.
Pavement, Geotechnical and Structures Group Safety Standards and Research Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners.
1 European Social Dialogue Agreement on Silica (NEPSi) -Update – Claire Lanne, IMA-Europe SSDCEI meeting, 6 September 2013.
Development update for BOF meeting – 14 June 2005.
PARCC Progress Update 1 June 26, In the Last Year… 2 June 2012 Minimum Technology Specifications, Version 1.0, Released Item Development Began August.
Development update for BOF 20. Slide 2 CIRIA Arch Manual Now published Available for free download from CIRIA web site.
Aggregates Review November Charged with addressing Objective 1 of the ALSF: “To minimise the demand for primary aggregates” A simple approach…….
Building for theBy Recycling Industrial Materials Industrial Materials Recycling Kimberly Cochran, PhD US EPA Office of Solid Waste AGC Building Division.
General Permits Schedule Update Water Quality Partnership Meeting May 19, 2005 Dewey Weaver.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Leeds -14 June 2005.
Safe roads, Reliable journeys, Informed travellers New Technologies for Highway Structures “Vision” Awtar Jandu Structures Design and Management.
PSRC’s Project Selection Process February 6,
Energiekamer RCC Meeting 28 August 2008 The Hague Maya van der Steenhoven & Kristien van de Laar PROGRAMME OFFICE - GRI NW.
CONDITION APPRAISAL AND REMEDIAL TREATMENT CIRIA Research Project RP692 MASONRY AND BRICK ARCH BRIDGES:
SUSTAINABLE BRIDGES PROJECT Masonry Arch Bridges Subgroup.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Cambridge –26 Sept
Civil Engineering Material
Oasys Concrete Analysis & Design
1 Special Inspector 2013 Technical Seminars Seminars sponsored by the SW WA Chapter of ICC The Willamette Carpenters Training Center and The Oregon Council.
1 Board Meeting September 29, 2014 Public-Private Transportation Partnership Board.
Bridge Engineering Section Bridge Rehabilitation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Silver Oak College Of Engineering & Technology. Prepared By:  PAREKH PRATIKKUMAR (29)  JATIN DAVE (45)  SHAH PEARL NEELAMKUMAR (58) Guided By: Prof.
Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum Cambridge -13 September 2005.
2009 Project Selection Task Force Recommendations Executive Board January 22, 2009.
1 Planning of the Stage 3 In-depth Review 2008 Joint TFEIP/EIONET air emissions meeting Tallinn, May 2008 Martin Adams Expert Panel on Review European.
Development update for BOF /18/9b. Slide 2 CIRIA Arch Manual final draft approved by SG internal CIRIA review completed final edit by research.
Procurement DR R Ellis HSE. Reducing Ill Health in Paving, Road and Highway Work Procurement Draft Plan – As of July 2013 Oct NovDecJanFebAprMar JuneAugOct.
INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation.
IENG 423 – Designing Decision Support Systems Sample DSS Analysis.
Civil Engineering Materials Spring Semester 2011 ( 12 April 11 – 21 July 11) Presented by: Engr. Bilal Iftikhar Department of Civil Engineering Swedish.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
STATUS OF INDUSTRY DOCUMENTS SANRAL PERSPECTIVE. SPECIFICATIONS & STANDARDS  OWN  INDUSTRY SANRAL USE :
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Repair and Strengthening of Concrete Bridges and other Structures
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
GM calls for European Regional Development Fund projects
Open Road Tolling Procurement Update
Ferguson Slide Permanent Restoration Project
Business Practices Subcommittee Update
Assessment of the Indaba by Steering Committee
NC Zero Harm Conference
World Safety Standards on Amusement Rides
بازاریابی و بازرگانی زمستان 93.
Computer Science Model Standards
PRIIA Section 209 States Working Group/Amtrak Update
Presentation to the Mackenzie River Basin Board November 21, 2018
Potential Milestones A timeline to finish in one year
Chair, TIA Emerging Technologies Subcommittee
NATA Foundation Building Blocks Process
PIDA Status, Next Steps & Challenges
PIDA Status, Next Steps & Challenges
10th HDV CO2 Editing Board Meeting 9 October 2017
API SC 10, Work Group 3 Update:
Demolition Ordinance Updates
Memorandum of Understanding
Strategic Planning Timeline Overview
Next Steps Advisory group debrief call Circulate meeting summary
UNRWA Planning AdCom Sub-Comittee May 2011.
Greater Kaweah GSA Board Meeting
Virginia’s Rock & Mineral Resources
Graduate Outcomes Data: Executive Board/Institutional Briefing
International Civil Aviation Organization
Calendar Overview – Phase I – REVISED April 2019
FASER LS2 work coordination meeting
Presentation transcript:

Development update for BOF 17

Slide 2 CIRIA Arch Manual final draft circulated to SG for comment internal CIRIA review completed returned to research contractor to final edit formal launch Dec 2005 publication early next year

Slide 3 CIRIA Tunnel Manual second draft produced in August 2005 steering group discussed on 29 September publication still expected early 2006

Slide 4 Smaller projects (1) CIRIA –manual on the use of rock in hydraulic engineering Delayed –Whole life costing across industries –Monitoring of concrete structures Mining related (with JS) –updated specification for procurement of mining related NDE Circulated for comments

Slide 5 Smaller projects (2) Salford University –soil/structure interaction in arch bridges presentation 20 October

Slide 6 Watching brief (1) Highways Agency –additional parts for BA86 (NDE manual) –review of BA79 – management of sub standard bridges –replacement of BD52/TD19 - road restraint systems BSI –Committee B/509/1 BS EN Road restraint systems BS6779 Pt 4 – Masonry bridge parapets European Construction Technology Platform –plenary meeting in Paris 25 October

Slide 7 New Starts DfT Bridges Board –“CIRIA” manual on metallic bridges –assessment of dry stone walls Edinburgh University –use of GPR on masonry arches Surrey University –reliability based bridge inspection frequencies –fatigue crack growth in wrought iron

Slide 8 New starts proprietary FRP products for use in bridges low energy lime mortars materials KTN/SMART.mat –launch 19 January 2006 IStructE – access gantries Leeds – PhD on FRP/metallic strengthening