Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.

Slides:



Advertisements
Similar presentations
GOALS FOR TODAY Understand how to write a HACCP Plan
Advertisements

P14415:P3 Arborloo Plastic Base Development
Lab 09: Performance Test 1 Advanced Energy Vehicle.
BRIAN CHURCH ANTHONY SALMIN TYLER BREITUNG ROSS BLUTH MICHAEL OPLINGER STEPHEN MROZ P15318: Gaseous Mass Flow Rate Controller Week 3 Problem Definition.
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
P14311: PCB Isolation Routing System Problem Definition Review.
Hazards Analysis & Risks Assessment By Sebastien A. Daleyden Vincent M. Goussen.
Underwater Robotic Fish Week 3 Review Presentation Project #15029 Multidisciplinary Senior Design Rochester Institute of Technology Phase II: Buoyancy.
Jake Manley-Project Lead/EE Mitchell Sedore-ME Brian Benner-ME Anushka Kalicharan-ME Kyle Abbott-ME.
P14474: Hydrostatic Test Apparatus Jake Manley Anushka Kalicharan Mitchell Sedore Brian Benner Kyle Abbott.
Personal Protective Equipment (PPE) Awareness Training S afety A wareness F or E veryone from Cove Risk Services.
Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND 1.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Basics of OHSAS Occupational Health & Safety Management System
© Copyright, The Joint Commission Performance Improvement: Getting Started in Your ASC Dana Dunn RN, MBA, CNOR, CASC Certified Yellow Belt Field Representative,
Auto Board Power Testing George Madden Principle Engineer.
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 4 1 Chapter 4: Basics of Preventive Maintenance and Troubleshooting IT.
Multidisciplinary Senior Design Project Charles Alexander, Tom Christen, Kim Maier, Reggie Pierce, Matt Fister, Zach Mink Underwater Thermoelectric Power.
M O V E – Management – Of – Vibration – Emissions/Exposure.
Motor Assisted Wheelchair Design Review 09/10/15.
Digital Microfluidics Control System II P Agenda ● Introduce Team ● Background ● Problem Statement ● Stakeholders ● Use Scenario ● Customer Requirements.
IT Essentials: PC Hardware and Software v4.0. Chapter 4 Objectives 4.1 Explain the purpose of preventive maintenance 4.2 Identify the steps of the troubleshooting.
Project Active Vibration Cancellation. The Team NameDisciplineRole Kaitlin PeranskiIndustrial and SystemsProject Leader/ Edge Updating Jeremy BerkeElectricalScribe.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 4 1 Chapter 4: Basics of Preventive Maintenance and Troubleshooting IT.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Project Background ❖ Project Summary ❖ Use Scenarios ❖ Customer Requirements ❖ Engineering Requirements.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
P16415: Human Powered Centrifuge Amanda Johnson Nathan Corr Pieter Werner Joanna Jayawickrema Laura Pratt.
SPX Data Acquisition PROBLEM DEFINITION REVIEW John Dong David Haller Adam Johnson Thomas Klaben Luke Kranz.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
FINAL PRESENTATION SENIOR DESIGN P14315 UNIVERSAL PUMP DATA ACQUISITION SYSTEM.
Introduction to Engineering Camera Lab #4 – 3 Task #2 Agenda Review Task #2 procedure Conduct Task #2 Work on lab report.
Automated Microfluidic Cell Separator
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
MSD1 WEEK 3 REVIEW By: Group P AGENDA  About Team P15462  Underlying Mission  Existing Systems  Project Background  Problem Statement  Deliverables.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
P15051: Robotic Eye Project Definition Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
MSD Total Supplier Performance and Inventory Control
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Automated Composting Appliance P16421 Sponsored by Rochester Roots.
Magnetically Levitated Propeller Bernie Garcia (ME, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachary Louison.
Magnetically Levitated Propeller Bernie Garcia (Me, Team Leader), Joe Bernardini (ME, Scribe), Elijah Sensenig (EE, System Integrator), Zachory Louison.
Automated Microfluidic Cell Separator Project Group:
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
What has been accomplished at the end of MSD 1 & 2?
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
Smart Cane – P14043 Lauren Bell, Jessica Davila, Jake Luckman, William McIntyre, Aaron Vogel.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Background Customer Requirements Final Test Fixture Subsystems P16203: Smart Power Supply Test Bench CUSTOMER: Bear Power Supplies, Phelps, NY PROBLEM:
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
P16512 – 3D Printing Ink Development Test Rig
Personal Protective Equipment (PPE) Awareness Training
Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka,
Multidisciplinary Senior Design I: Problem Definition Review
Right Move, Right Place, Right Time
P14551: Multi-Process 3-D Printer
Personal Protective Equipment (PPE) Awareness Training
P17082 Biomechanical Elbow Model Final Presentation
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
P16702: ABVI Fabric Shredding Process and Facility Design
Breadfruit Flour Grinder
Systems Level Design Review
Hazards Analysis & Risks Assessment
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
MSD I Review February 22, 2008 (9:00 AM) Room
Presentation transcript:

Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO

Agenda Problem Statement Stakeholders Deliverables Use Case Benchmarking Customer Requirements Engineering Requirements House of Quality Safety Project Plan Next 3 weeks

Problem Statement No existing test fixture Operator safety is the most important aspect Quick, efficient, and accurate testing for customer satisfaction

Stakeholders Bear Power Supplies ◦Technician ◦Troubleshooting Team ◦Design Engineers ◦End customer MSD Team RIT

Use Case

Project Goals and Deliverables Finished and functional test fixture All documentation related to its creation Comprehensive operators manual including fixture troubleshooting guide Poster Demonstration at Imagine RIT Summary of Smart Power Supply Test Bench design process

Benchmarking Custom build for Bear Power Supplies ◦Attempt to utilize pros of current fixtures and eliminate cons ◦Interviewed operators for input on design

Customer Requirements

Engineering Requirements

Engineering Requirements Pt. 2

Engineering Requirements Pt. 3

House of Quality

Risk Management MSD Team Safety ◦Safety procedures for developing and testing the fixture Lab Environment Safety ◦Properly display warnings that high voltage is being worked with ◦Provide active interlock to prevent access to power supply of sub-assemblies wile high voltage is present Operator Safety ◦Protect the operator from potential harm cause by UUT failure or AC line exposure

Project Plan

Next 3 weeks…

Questions?