Beetle Readout for the MaPMTs: First Results from the Testbeam  history of events  documentation of setup RICH meeting, Zürich, 16.09.2003 Stephan Eisenhardt.

Slides:



Advertisements
Similar presentations
The MAD chip: 4 channel preamplifier + discriminator.
Advertisements

Flat-Panel PMT Front-End Requirements RICH Upgrade meeting, Stephan Eisenhardt University of Edinburgh o Bootstrapping: where from? o Gain adaptation.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
SPiDeR  First beam test results of the FORTIS sensor FORTIS 4T MAPS Deep PWell Testbeam results CHERWELL Summary J.J. Velthuis.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Lecce - 23 Sep The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti M. Grassi.
26/06/2003Nigel Smale University of Oxford Introduction The BeetleMA0 back-up solution. A readout chip that complies to the LHCb read out specifications.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
MaPMT Readout Workshop / Introduction MaPMT Workshop Imperial College 26/27 June 2003 Franz Muheim University of Edinburgh.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Review of Readout for the MaPMTs  Beetle chip (1.2 & 1.2MA0)  results with Heidelberg board RICH meeting, CERN, Stephan Eisenhardt University.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Status of the Beetle Readout for the MaPMTs  history of events  documentation of setup  prospects of near future RICH meeting, CERN, Stephan.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
Florida Institute of Technology, Melbourne, FL
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
RICH meeting, F.Muheim1 Proposal for MAPMTs as Photodetectors for the LHCb RICH Franz Muheim University of Edinburgh on behalf of the MAPMT group.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
MaPMT Readout with boardBeetle: First Experiences Beetle User meeting, Zürich, Stephan Eisenhardt University of Edinburgh  Testbeam experiences:
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Peter Križan, Ljubljana September 17, 2008 SuperB PID Peter Križan University of Ljubljana and J. Stefan Institute Forward PID: - SiPM as photon detectors.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
PreShower Characterisations
Fabio, Francesco, Francesco and Nicola INFN and University Bari
CTA-LST meeting February 2015
DCH FEE 28 chs DCH prototype FEE &
Design of Digital Filter Bank and General Purpose Digital Shaper
Christophe Beigbeder/ ETD PID meeting
Multianode Photo Multipliers for Ring Imaging Cherenkov Detectors
BESIII EMC electronics
Optical links in the 25ns test beam
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
Presentation transcript:

Beetle Readout for the MaPMTs: First Results from the Testbeam  history of events  documentation of setup RICH meeting, Zürich, Stephan Eisenhardt University of Edinburgh   measurements & data   preliminary results

2 RICH meeting, Zürich, Stephan Eisenhardt History of Events I: pre-testbeam o Thu : first ever boardBeetle 1.2 finished and shipped to Edinburgh o Fri : lorry of carrier crashed in road accident o Mon : shipment of first boardBeetle 1.2 arrived at Edinburgh visual inspection: board OK o Wed : first data frames after sorting out problems in the I2C level adaptation and the temporary cabling o Wed : first boardBeetle 1.2MA0 finished and shipped to Edinburgh o Thu : adaptation of FED to differential read-out and first ever LED light signals via DAQ chain (boardBeetle 1.2)  success!! (although a limitation of the dynamic range was observed – amplifier saturates?!?) o Fri : test of boardBeetle 1.2MA0  success! o Sat : pack and go

3 RICH meeting, Zürich, Stephan Eisenhardt History of Events II: pre o Sun Wed : troubleshooting of interference between WinXP,NI- interface and Labview on DAQ PC o Mon : 4 more boardBeetle 1.2 delivered to CERN o Wed : move into beam area o Thu Fri : infrastructure & cabling for missing interface board o Sat : tuning of timing & first data frames with LED light and one boardBeetle 1.2 o Sun : tuning of setup for Cherenkov light & first Cherenkov photons with one boardBeetle 1.2 o Mon : cabling for the MaPMT cluster due to missing interface board o Tue : I2C problems with cluster  work around found o Wed : mounting & tuning of cluster of 8 8-dynode stage MaPMT o Thu : tuning of read-out map for right geometry match & first ring of Cherenkov photons  success!!

4 RICH meeting, Zürich, Stephan Eisenhardt History of Events III: post o Fri : 1 spare differential FED delivered to CERN to fix saturation (but of no use as with new CMS firmware) o Fri : lenses mounted on cluster o Sat : Silicon Telescope & Cherenkov counter in DAQ o Sun : TDC in DAQ & timing & DC-offset adjustment o Mon : first attempt on binary readout o Tue : data taking for: CF 4 for cluster of 8 MaPMT (Beetle 1.2) o Wed : end of testbeam… continuing with parasitic use of beam o Thu : data taking for: N 2 for cluster of 8 MaPMT (Beetle 1.2) & completion of cluster o Fri Sat : attempt to measure S-curves in binary readout data taking for: Air, CF 4 for cluster of 9 MaPMT (Beetle 1.2) o Sun : mount of cluster with 6 MaPMT (Beetle 1.2MA0) lenses, DC-offsets,…  ring fragments

5 RICH meeting, Zürich, Stephan Eisenhardt Beetle 1.2 chip: pre-bonding pads of pitch adapter pipeline front- end digital engine pads of Beetle analogue input pads of Beetle I/O

6 RICH meeting, Zürich, Stephan Eisenhardt Zoom for probe-tested Chip marks of probe needles made some problems at bonding - but finally it worked

7 RICH meeting, Zürich, Stephan Eisenhardt Pitch adapter o Pitch adapter is irregular: due to accident in submission –design was sent in low accuracy  rounding errors & shorts –layout altered at CERN to fix shorts (but not the rounding errors…) –not communication back to IC –so this structure only was found at bonding… o Cause of cross-talk??

8 RICH meeting, Zürich, Stephan Eisenhardt Equipped boardBeetle 10x8 PGAs (2 rows GND pins) Level 0: “back side” Level 5: “front side” preamp,analog, digital, comparator GND connections pitch adapterBeetle chip protective plastic cap buffer capacities and terminators 4x differential amplifiers 4x differential line drivers 4x single ended probe pins power SEQSI & I2C 4x differential out I2C address 4x pot for DC offset

9 RICH meeting, Zürich, Stephan Eisenhardt Cluster Setup base plate for mounting and grounding Cambridge bleeder board 5x boardBeetle with Beetle dynode stage MaPMT grounding points slits to access potentiometers mounting holes for lens mount mounting holes for mount to vessel HV point rotation of 4 bleeder chains

10 RICH meeting, Zürich, Stephan Eisenhardt Cluster Setup: vessel boardBeetle base plate pivot point MaPMT bleeder board photon direction

11 RICH meeting, Zürich, Stephan Eisenhardt Cluster Setup: with lenses

12 RICH meeting, Zürich, Stephan Eisenhardt Interface Board is missing… 3.3V power line for LVDS fan-out boards designed position of interface board daisy chain of power cables 5x LVDS fan out boards I2C bus 2 cable trees to distribute LVDS signals to boardBeetles

13 RICH meeting, Zürich, Stephan Eisenhardt Pre-Testbeam Results o using Heidelberg board at Edinburgh –noise –signal loss –comparison Beetle 1.2 / Beetle 1.2 MA0 o using boardBeetle at Edinburgh –first spectra –comparison Beetle 1.2 / Beetle 1.2 MA0 –Saturation –cross-talk

14 RICH meeting, Zürich, Stephan Eisenhardt Comparison using Heidelberg Board 8-dynode/Beetle1.212-dynode/BeetleMA0 less common mode noise Noise 1.3 ADC Noise 1.0 ADC

15 RICH meeting, Zürich, Stephan Eisenhardt Signal Loss Study Becki Cikoski, Edinburgh MSc Student

16 RICH meeting, Zürich, Stephan Eisenhardt First Spectra with boardBeetle before CM correction after CM correction Beetle 1.2: 800V  =1.02 Beetle 1.2: 900V  =1.06 Beetle 1.2MA0: 800V  =0.55 Beetle 1.2MA0: 900V  =0.55 Beetle 1.2: 800V  =0.77 Beetle 1.2: 900V  =0.78 Beetle 1.2MA0: 800V  =0.51 Beetle 1.2MA0: 900V  =0.53 Saturation at half the dynamic range: present before the FED!

17 RICH meeting, Zürich, Stephan Eisenhardt Saturation o A) differential amplifier –gain 10 seems too much for our signals –easy fix: gain 5 remove serial 50  ètotal gain maintained èdynamic range doubled o B) FED –Edinburgh FED was configured single-ended, unipolar –conversion to differential OK, but still unipolar (no level shifters), i.e. 0…0.75V instead of –0.75…0.75V  8-bit  7-bit reduction o … at least the two devices match…

18 RICH meeting, Zürich, Stephan Eisenhardt Cross-talk in LED Study o o Crosstalk – –two adjacent channels – –~8 % – –worst found case – –actual worst case?

19 RICH meeting, Zürich, Stephan Eisenhardt Preliminary Testbeam Results o first measurements with cluster: 8 8-dynode MaPMT & 5 Beetle1.2 –data frames, LED light, adjustment of pixel map, first Cherenkov ring o timing optimisation o noise level and CM suppression –cluster of 8-dynode MaPMT & Beetle1.2 –half cluster of 12-dynode MaPMT & Beetle1.2MA0 o cross-talk study –first approach to correct o photon yields: –Air: 960 mbar –N 2 : 960 mbar –CF 4 : 80 mbar, 800 mbar

20 RICH meeting, Zürich, Stephan Eisenhardt Data Frames sampled charge Channel ID sampled charge Channel ID cluster of 6 Beetle1.2zoom to 2 nd Beetle1.2 data frame header bits pedestals Cherenkov photons signal signature of a full ring

21 RICH meeting, Zürich, Stephan Eisenhardt LED Light o o 8 8-dynode MaPMTs – –6 new + 2 existing – –all working – –HV = 800 V o o 5 boardBeetle 1.2 – –all working o o Analysis – –in progress – –gain variation look okay

22 RICH meeting, Zürich, Stephan Eisenhardt Pixel Map

23 RICH meeting, Zürich, Stephan Eisenhardt First Cherenkov Light o o 8 MaPMTs – –no lenses – –HV = 800 V o o Cherenkov Ring – –Air 960 mbar – –3.6 pixels / event with 5 sigma cut – –from raw data

24 RICH meeting, Zürich, Stephan Eisenhardt Timing of Beam Photons o adjusted average timing between beam photons and Beetle clock –25ns jitter –measured by TDC o aim to sample at peak of signal –adjustment for average by cable delay 25ns delay: +0nsdelay: +10ns delay: +20nsdelay: +28ns sampled charge t [ns] 25ns

25 RICH meeting, Zürich, Stephan Eisenhardt Result of Timing Optimisation o made from Cherenkov Ring –Air 960 mbar –no lenses –HV = 800 V –8 8-stage MaPMTs –5 Beetle 1.2 o narrow distribution –as one expects –indicates shape of analog pulse signals at sampler in the Beetle additional delay t [ns] photons / event +18ns: final run condition

26 RICH meeting, Zürich, Stephan Eisenhardt Noise in Beetle1.2 o final noise level –after DC-offset tuning –after tuning of timing o full cluster –6 boardBeetle1.2 –9 8-stage MaPMT o from pedestal run –before CM correction è low  (1.0…1.5 ADC) èno CM problem è uniform offsets

27 RICH meeting, Zürich, Stephan Eisenhardt CM Suppression in Beam Run o from CF 4 beam run –HV= 800V –cluster of 8-stage MaPMT with Beetle1.2 o without cross-talk suppression –pedestals of ring pixels broadened background raw  =1.16 background corrected  =0.86 ring center raw  =1.56 ring center corrected  =1.18

28 RICH meeting, Zürich, Stephan Eisenhardt Noise in Beetle1.2MA0 o final noise level –after DC-offset tuning –after tuning of timing o half cluster –3 boardBeetle1.2MA0 –6 12-stage MaPMT o from pedestal run –before CM correction è lower  for charge divider (1.0 ADC) è even lower  for attenuator (0.5 ADC) è uniform offsets

29 RICH meeting, Zürich, Stephan Eisenhardt Cross-talk I: Correlation Coeff. Study by Andrew Pickford from raw datafrom CM corrected data 0.1

30 RICH meeting, Zürich, Stephan Eisenhardt Cross-talk II: tubes on one board 0.01 PMT2 v PMT2 PMT3 v PMT3 PMT2 v PMT Study by Andrew Pickford

31 RICH meeting, Zürich, Stephan Eisenhardt Cross-talk III: charge ratios o Cross-talk is: –horizontal –asymmetric ~13% right  left ~4% left  right –not vertical o Suspects: –tracks in or on boardBeetle –pitch adaptor Study by Andrew Pickford PMT2: pix1/pix2PMT2: pix2/pix1 PMT2: pix8/pix9PMT2: pix30/pix38

32 RICH meeting, Zürich, Stephan Eisenhardt Cross-talk reduction: first approach cut on one neighbour cut on four neighbours top neighbour left neighbour right neighbour bottom neighbour o LED photons: 8-stage MaPMT, Beetle1.2; with lenses, -800V

33 RICH meeting, Zürich, Stephan Eisenhardt Single Events o Cherenkov photons, CF 4 800mbar: 8-stage MaPMT, Beetle1.2; with lenses, -900V from raw data with cross-talk cut on left or right neighbour

34 RICH meeting, Zürich, Stephan Eisenhardt Cherenkov Rings I o Cherenkov photons, CF 4 800mbar: 8-stage MaPMT, Beetle1.2; with lenses, -900V from raw datawith cross-talk cut on left or right neighbour beam: -10 GeV  mostly  photons/evt6.5 photons/evt

35 RICH meeting, Zürich, Stephan Eisenhardt Cherenkov Rings II o Cherenkov photons, CF 4 80mbar: 8-stage MaPMT, Beetle1.2; with lenses, -900V from raw datawith cross-talk cut on left or right neighbour beam: -10 GeV   - and e photons/evt0.21 photons/evt

36 RICH meeting, Zürich, Stephan Eisenhardt Preliminary Photon Yield o photon yields from raw data: –no CM correction –no cross-talk correction –9 8-stage MaPMT – full ring (N 2 : only 8 tubes) –Beetle1.2 –with lenses –’99 result CM corrected

37 RICH meeting, Zürich, Stephan Eisenhardt Preliminary Photon Yield o photon yields from data with simple minded algorithm for cross-talk reduction: –no CM correction –cross-talk correction over-corrects –algorithm still questionable –9 8-stage MaPMT – full ring (N 2 : only 8 tubes) –Beetle1.2 –with lenses o further increase expected due to: –CM correction –better cross-talk correction Very Preliminary

38 RICH meeting, Zürich, Stephan Eisenhardt Unfinished Business I o cluster of 6 12-stage MaPMT & 3 boardBeetle1.2MA0: –time too short to get it to run properly –only ring fragments o measure with single base –to exclude cross-talk from bleeder board o measure with Hamamatsu bleeder board –check for load effects o test of interface board: –production only almost finished o fix saturation of amplifier o regain dynamic range in FED o fix I2C problem with cluster

39 RICH meeting, Zürich, Stephan Eisenhardt Unfinished Business II o binary readout: –in Oxford lab: threshold scan of single channel of Beetle1.2MA0 –at testbeam: threshold scan of cluster of Beetle1.2 but results not yet understood Study by Nigel Smale

40 RICH meeting, Zürich, Stephan Eisenhardt Unfinished Business III o locate source of cross-talk: –track in or on boardBeetle? –irregularities on pitch adaptor? Bond pads towards Beetle corrupted & badly fixed layout of IC pitch adaptor

41 RICH meeting, Zürich, Stephan Eisenhardt Conclusions o o the testbeam was a success: – –Beetle1.2 & 8-stage MaPMT work – –noise excellent, almost no CM – –preliminary photon yields look OK – –further analysis is ongoing o o issues: – –Beetle1.2MA0 not fully tested – –binary readout only started – –source of cross-talk – –no new data till review o o Thanks to all the people who made this result possible!!!