Sony Pictures Entertainment Enterprise Risk Management Status August 2, 2013 WORKING DRAFT.

Slides:



Advertisements
Similar presentations
How Will it Help Me Do My Job?
Advertisements

AASHTO Internal Audit Conference 2012 – Phoenix Daniel Fodera, CMQ/OE Program Management Improvement Team Federal Highway Administration.
Rob Kella - Chief Risk Officer
Program Management Office (PMO) Design
Roadmap for Sourcing Decision Review Board (DRB)
Corporate Records Management (Practitioner) Information Governance Policy Team NHS Connecting for Health.
ASX Corporate Governance Council
CENDI/NFAIS Quality Workshop: The Importance of Quality and Integrity Kevin Kirby, Enterprise Data Architect US Environmental Protection Agency Office.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Introduction to Enterprise Risk Management (ERM)
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Operational risk management Margaret Guerquin, FSA, FCIA Canadian Institute of Actuaries 2006 General Meeting Chicago Confidential © 2006 Swiss Re All.
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
Enterprise Risk Management in DHHS
Enterprise Risk Management EXECUTIVE POLICY GROUP Enterprise Risk Managementwww.utdallas.edu Enterprise Risk Management Campus Safety.
NAIC Review of ERM & Internal Controls David Altmaier Florida Office of Insurance Regulation.
IS&T Project Management: Project Management 101 June, 2006.
Corporate Ethics Compliance *
Building a Compliance Risk Monitoring Program HCCA Compliance Institute New OrleansApril 19, 2005 Lois Dehls Cornell, Esq. Assistant Vice President, Deputy.
PAINTING THE FULL PICTURE
Complying With The Federal Information Security Act (FISMA)
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
Information Security Compliance System Owner Training Richard Gadsden Information Security Office Office of the CIO – Information Services Sharon Knowles.
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
DAA and GEP Orlando Audit & Compliance or Audit vs. Compliance.
Fall 2003 Auditing Update for Auditing and Assurance Services: An Integrated Approach.
The role of internal audit in enterprise-wide risk management (ERM)
Audits & Assessments: What are the Differences and How Do We Learn from the Results? Brown Bag March 12, 2009 Sal Rubano – Director, Office of the Vice.
2007 Annual Meeting ● Assemblée annuelle 2007 Vancouver 2007 Annual Meeting ● Assemblée annuelle 2007 Vancouver Canadian Institute of Actuaries Canadian.
Chapter 3 Internal Controls.
Basics of OHSAS Occupational Health & Safety Management System
Date of the Meeting: July 31, 2012 Approximate time required: 30 minutes Presenter: Andy Kaplan Attendants: Contact Person : Drew Shearer Note: Please.
1 Enterprise Risk Management (ERM) Program PNM Resources, Inc. March 29, 2007 Presentation to American Public Power Association March 2007 Austin, Texas.
IT Risk Management, Planning and Mitigation TCOM 5253 / MSIS 4253
Colorado Springs Utilities Environmental Services Functional Assessment Presentation for the American Public Power Association’s 2001 Engineering & Operations.
NIST Special Publication Revision 1
A DEPARTMENTAL PERSPECTIVE Drive Value through Compliance with the Green Book – Stop Checking the Box.
Roles and Responsibilities
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
IRS Enterprise Risk Management (ERM)
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY 1 Integrated Enterprise-wide Risk Management Protecting Critical Information Assets and Records FIRM Forum.
Date of the Meeting: July 31, 2012 Approximate time required: 30 minutes Presenter: Andy Kaplan, President, SPT Networks Attendants: Contact Person : Drew.
Disaster Recover Planning & Federal Information Systems Management Act Requirements December 2007 Central Maryland ISACA Chapter.
APPA - Enterprise Risk Management LCRA’s ERM Journey Presented by JoEllen Peterman, ERM Program Manager September.
Sony Pictures Entertainment
Balance Between Audit/Compliance and Risk Management- Best Practices FIRMA 21 st National Training Conference Julia Fredricks, U.S. Chief Compliance Officer.
Date of the Meeting: July 26, 2011Approximate time required: 30 minutes Presenters: Michael Lynton & Jim Underwood Attendants: Contact Person : Jim Underwood.
Document Number: Version: 1v0 © Outperform UK Ltd 1 Assessing the change capability of an organisation Jennifer Stapleton.
Data Strategy  Status Update  SSIM  RID  Technology Strategies.
Leadership Reorganization December Key elements Recognizes IT’s critical role Centralizes Operations Coordinates compliance Centralizes the operations.
Gordon Shevlin Founder, Chief Executive Officer Allgress, Inc.
Date of the Meeting: July 26, 2011Approximate time required: 30 minutes Presenters: Michael Lynton & Jim Underwood Attendants: Contact Person : Jim Underwood.
Improving COI Information Management Special Projects COI Committee Lois Brako, Assistant Vice President for Research Regulatory Compliance Oversight June,
APPA - Enterprise Risk Management LCRA’s ERM Journey Presented by JoEllen Peterman, ERM Program Manager March 29, 2007.
Internal Sales Overview Obtaining Approval to Conduct Internal Sales.
INVESTMENT COMMITTEE REVIEW: HBO Latin America Divestiture Opportunity January 22, 2010 [DRAFT]
Chapter © 2015 Pearson Education, Inc. Publishing as Prentice Hall.
Managing Uncertainty, Creating Opportunity Enterprise Risk Management J. Brown, CEO.
Implementing Program Management Standards at Duke Energy.
Valiants Verify Compliance Program Judith W. Spain, J.D., CCEP ® Chief Ethics and Compliance Officer General Counsel (Effective March 2016) 1.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
IIASA Governance Review
Copyright © 2009 PMI RiskSIG
Approaches to Implementing in Your Organization
CORPORATE & ACADEMIC GOVERNANCE STRUCTURE
Association of International Bank Audit
COBIT 5 and GRC Date.
Bridging the ITSM Information Gap
Presentation transcript:

Sony Pictures Entertainment Enterprise Risk Management Status August 2, 2013 WORKING DRAFT

2 Executive Summary Current Status  Conducted meetings with DCFOs from the various business segments, obtained and consolidated input on risks.  Created SPE Enterprise Risk Management Assessment leveraging the SONY Risk Management Framework model and guidance (refer to following slides).  In process of establishing a Governance, Risk and Compliance (GRC) Program.  Executive Sponsors: Dave Hendler (CFO) and Leah Weil (General Counsel)  GRC Program Management Office – Executive Leads: Ron McNair (CAO), Sharon Borak (Legal Affairs) and GRC VP  Key Objectives include:  Establishing ERM baseline.  Ensuring projects, ongoing initiatives, and spending align with SPE’s overall risk mitigation and compliance objectives.  Centralized monitoring and oversight for all GRC related issues, escalation, continuous improvement and integrated reporting.  Reducing risk exposure and audit costs.  Improving overall compliance and enhanced decision making.  Integration of Archer with other GRC related tools and initiatives. Upcoming Action Items  Risk Map approval by Michael Lynton (SPE CEO) and Direct Reports  Review with DCFO’s as part of MRP Process (i.e., one page Addendum added to the current process) Recommendations  Perform detailed risk assessment for a few selected areas (e.g., Corporate and Operational segments).  Potential candidates include:  Corporate: Security Environmental Health & Safety (SEHS), Information Technology (IT)  Operational: Sony Pictures Animation (SPA), Imageworks WORKING DRAFT

3 SPE Enterprise Risk Management Framework WORKING DRAFT

4 SPE Enterprise Risk Management Summary (Example) WORKING DRAFT