Dam Safety Program March 2011 Dam Safety Program March 2011.

Slides:



Advertisements
Similar presentations
Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
Advertisements

Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Fort Bend Flood Management Association Flood Risk Reduction Symposium October 3rd, 2014 (Part-A) Brazos River at San Felipe - USGS Gage Fort Bend County.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORY INTERAGENCY & INTERNATIONAL SERVICES BUILDING STRONG ® US ARMY.
Chapter 3 Structural Infrastructure Copyright © 2012 by John Wiley & Sons, Inc. All rights reserved. Introduction to Infrastructure: An Introduction to.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Supervisor Max Wilson, District 4 Supervisor Mary Rose Wilcox, District 5 Buckeye FRS No.1 Rehabilitation Project Tom Renckly, P.E. Branch Manager Structures.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
John Hunyadi, P.E. Dam Safety Engineer General Orientation on Dams Classification, Terminology, Types of Construction, etc.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Dave Samson CA Department of Water Resources Northwest Hydroelectric Association 2011 Annual Conference "Avoiding a Dam Midlife Crisis" THE CALIFORNIA.
Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
Tom Blaine, P.E State Engineer May 11, 2015 Watershed and Dam Owners Coalition WATER IS POWER.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
SWUG 2003 The Natural Resources Conservation Service (NRCS) in Arizona has led the effort for completion of their WBD. NRCS relies on this data for many.
Dam Safety Program Management and Organization
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
1 Association of State Floodplain Managers Infrastructure: Fixes & Funding June 10, 2009 Bruce A. Julian USDA-Natural Resources Conservation Service.
Watershed Dams Maintenance Renovation/Rehabilitation.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
NRCS Watershed Rehabilitation
Watershed Structure Operation & Maintenance (O&M) Responsibilities Diane A. Guthrie, P.E. August, 2015.
1 Transportation Alternatives Program FY2015 Application Update February 19, 2014 Jennifer DeBruhl Director, Local Assistance Division.
Matt Schueler Civil Project Management & Programs
Infrastructure Challenges in Kentucky Carey Johnson Kentucky Division of Water 2014 Governor’s Conference on Energy and the Environment.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
February 10, 2015 Martin Lang, MPA Deputy Director of Field Operations.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
Napa Salt Marsh Restoration Project 2010 Status Update.
A SHFORK -B AINBRIDGE S TEEL D AM S TRUCTURAL E VALUATION P ROJECT DWP Engineering Diwei Chen Wen Cui Paul Garrett.
Subcommittee on Hydrology/ACWI New Extreme Storm Work Group Status and Plans.
Water Resources Congress Agency Updates October 30, 2014 Pat Harris, Director North Carolina Division of Soil & Water Conservation.
HYDROLOGIC DATA. BACKGROUND Analysis and synthesis of data is required to perform any hydrologic computation. The engineer needs to: Identify and define.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Department of Water Resources FloodSAFE Environmental Stewardship and Statewide Resources Office Gail Newton, Chief, FloodSAFE Environmental Stewardship.
US Army Corps of Engineers BUILDING STRONG ® Boise River Feasibility Study Ellen Berggren, PMP Outreach Coordinator/ Project Manager Idaho Governor’s Roadless.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
Kaufman-Van Zandt Soil and Water Conservation District Roy Deen Chairman.
Corps of Engineers BUILDING STRONG ® Interim Operating Pools Jerry W. Webb, P.E., D.WRE Principal Hydrologic & Hydraulic Engineer Hydrology, Hydraulics.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
Subcommittee on Hydrology, ACWI New Extreme Storm Work Group Status and Plans.
Ruttinger & Sons Engineering Designed by: Taylor Kasperick Jacob Wilson Loren Ruttinger Presented by: Loren Ruttinger.
Works and Transport Sector Overview of 2016/17 Grant and Budget Guidelines Ministry of Works and Transport and Uganda Road Fund.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
1 Dams in Saudi Arabia: Types and Functions Faisal Fahad Al Harbi Majid Mufleh Al Motairi Hamad Al Mzroui Mulfi Mshej Al Otaibi Civil and Environmental.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
GAUTHIERE ENGINEERING, INC. Outlet Works Rehab. Items Build Access Road Drain lake Reline Existing 8” CMP with CIPP Replace Outlet Gate and Lift Equipment.
GOOSE CREEK WATERSHED LEVEL I STUDY SCOPING MEETING
Minsi Lake Dam Public Meeting October 3, 2016 Paul Urbanik, P.E.
Tennessee Safe Dams Program
Presentation transcript:

Dam Safety Program March 2011 Dam Safety Program March 2011

Dam Safety Program Activities Recurrent Dam Safety Activities Structures Assessments and Repairs Dam Rehabilitation CENTENNIAL NARROWS DAM 1997 DAM FAILURE

Background Flood Control District Dams –District Operates and Maintains 22 Flood Control Dams –16 Dams Built by Natural Resources Conservation Service (NRCS - Formerly SCS) –5 Dams Built by Corps of Engineers –1 Designed and Built by District –Dams Total 64 Miles in Length –District was local Sponsor for NRCS and Corps Dams –Arizona Department of Water Resources is the Jurisdictional Agency

Background 16 NRCS Dams  Built From 1954 to 1991  100-Year Flood Protection for Agricultural Areas  Flood Storage: Average 3,000 Acre-Feet Maximum 11,000  Most Single Zone Earthen Dams, Average Length 3.2 miles 4 Corps of Engineers Dams, District as Sponsor  Built From 1974 to 1985  SPF Flood Protection for Urbanized Areas  Flood Storage: 300, 18,000, 43,000 47,000 Acre-Feet  Zoned Earthen Dams, Average Length 0.8 miles McMicken Dam – USACOE, 1956 McMicken Dam – USACOE, 1956 Cassandro Wash Dam –District, 1996 Cassandro Wash Dam –District, 1996

Recurrent Dam Safety Activities Dam Surveys

Recurrent Dam Safety Activities Future Contracts Surveys for DamsSurveys for Dams On-call Register Based SelectionOn-call Register Based Selection Contract Value $250,000Contract Value $250,000 Contract Duration 2 YearsContract Duration 2 Years Anticipated Award Dates: Anticipated Award Dates: –TBD

Recurrent Dam Safety Activities Future Contracts Upgrade of Emergency Action Plans – Now performed in Engineering DivisionUpgrade of Emergency Action Plans – Now performed in Engineering Division On-call Register Based SelectionOn-call Register Based Selection Contract Value $250,000Contract Value $250,000 Contract Duration 2 YearsContract Duration 2 Years Anticipated Award Dates: Anticipated Award Dates: –TBD

Structures Assessments and Repairs McMicken Dam Embankment Cracking at Principal Spillway

Structures Assessments and Repairs Guadalupe FRS Intake Structure and Gates Guadalupe FRS Intake Structure and Gates Outlet Cracking Outlet Cracking Buckeye FRS No.2 Dam Safety Deficiency Buckeye FRS No.2 Dam Safety Deficiency PMP/PMF Updates From Statewide PMP Study PMP/PMF Updates From Statewide PMP Study Gravel Mulch added to Dams Gravel Mulch added to Dams Other Dam Safety Issues by need and priority Other Dam Safety Issues by need and priority

Structures Assessments and Repairs Future Contracts Geotechnical On-call: $500K to $750K, 2 to 3 Years, Advertise: 2 to 3 monthsGeotechnical On-call: $500K to $750K, 2 to 3 Years, Advertise: 2 to 3 months Civil/Geotech/H&H On-call: $500K to $750K, 2 to 3 Years, Advertise: 2 to 3 monthsCivil/Geotech/H&H On-call: $500K to $750K, 2 to 3 Years, Advertise: 2 to 3 months

Dam Rehabilitation and Dam Modifications Overall dams are well maintainedOverall dams are well maintained Recurrent dam safety activities and structures assessment are keeping the dams safe to operate for the short term and interim termRecurrent dam safety activities and structures assessment are keeping the dams safe to operate for the short term and interim term 2 Dam Rehabs Completed2 Dam Rehabs Completed 6 Dams identified for rehabilitation or replacement for dam safety reasons6 Dams identified for rehabilitation or replacement for dam safety reasons 3 Dams identified for modifications3 Dams identified for modifications

Dam Rehabilitation Projects Status  Spook Hill FRS Rehab – Complete  White Tanks FRS No.3 Rehab - Phase II Construction  White Tanks FRS No.4 Rehab  Phase I Construction – March 2011  Phase II – Final Design in progress  Buckeye FRS No. 1 Rehab– Final Design in progress  Powerline FRS, Vineyard Road FRS and Rittenhouse FRS – Planning in Progress – FUTURE DESIGN CONTRACT  McMicken Dam – District planning complete, seeking Corps funding – FUTURE DESIGN CONTRACT

Dam Modifications Projects Status  Powerline FRS Earth Fissure Mitigation – Construction March 2011 Construction March 2011  Saddleback FRS Filter Repair – Final Design in Progress  Cave Buttes Dam Modifications – Final Design in Progress