Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.

Slides:



Advertisements
Similar presentations
Muons going through MICE should –Have ISIS proton timing structure –Generate TOF signals –Satisfy ISIS and TOF trigger requirements MICE tracker DAQ will.
Advertisements

MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
MOM report – part I Roumen Tsenov as MOM ( )
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference, August 20, 2007.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Online – Data Storage and Processing
Tracker readout, DAQ, C&M and calibration
MICE Computing and Software
Tracker TriP-t Test Stand
Preparation for Station Acceptance Test
MICE AFEIIt Timing and Triggering
AFE IIt/VLSB Update Firmware Progress Hardware Progress AFE IIt VLSB
Hideyuki Sakamoto CM22, RAL 19/10/08
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011

2011 Cosmic Ray Test Plan What do we want to do? –Take more cosmic ray data with both trackers simultaneously Why? –Last time took data – 2009 –Never satisfactorily set up and timed in trigger –Never before run both trackers at the same time –Tracker expertise leaving –Do this test  make detectors secure until installation in Hall How long? –Until we: enable two-tracker readout, verify tracker quality, MLCR readout?

Tracker Hardware 2 trackers 4 cryostats 16 AFE-IIt boards Readout electronics Readout code Trigger Fake ISIS RF signal

Tracker Hardware Status Minimized He background in Lab7 –Vent pumps outside –New He tank and regulator Vacuum pumps good New hoses on Cryo 2 & 4 to stop leaks All AFE boards cabled to VLSBs New trigger panels in Lab7 –Need to mount All readout electronics modules in hand

Cryostats Near Ready Cryostat 1 –Vacuum –Cold cathode gauge –Trigger Cabling –Cooldown Cryostat 2 –Vacuum –Cold cathode gauge –Trigger Cabling –Cooldown Cryostat 3 –Vacuum –Cold cathode gauge –Trigger Cabling –Cooldown Cryostat 4 –Vacuum –Cold cathode gauge –Trigger Cabling –Cooldown

MICE AFE-IIt Status Feb Paul Rubinov – FNAL Tom Fitzpatrick - FNAL

The key problem for AFE in MICE is the ISIS RF –More precisely: the key problem is knowing when muons are crossing the tracker AFE was never designed for a changing frequency –ISIS increases frequency as the bunches are accelerated (~3.0 to 3.1 MHz during time we dip the MICE target) It’s difficult to make it work at any fixed frequency more than about 25 ppm away from MHz (would need hardware mods) Another way to state the problem: –We need to open the integration gate before the first muon gets there AFE in MICE

Paul & Tom’s solution Our solution is one of their favorites: let someone else worry about it –We expect to be supplied a signal that indicates when the TriP-t integration window is to be open –We distribute this across the board using low skew routing, so all channels are live at the same time –Once data is in the pipeline, after trigger, we digitize and readout at 53Mhz as always. Required from MICE: “integrator live” signal and fixed latency trigger

Status We also tried to simplify the data format and the firmware Current status is: 100% done, but continuing to test for more subtle problems Caveat: we have one AFE board and one VLSB at Fermilab –Will test thoroughly at RAL next week Using Malcolm’s Excel based readout Capable of ~150 events per ms long spill, but this depends on trigger latency if it is greater than about one half of ISIS RF bucket

Example Output File: Zero Suppression Off (with zs on, just take away all lines with hit=0) *** Parsed Data *** --- Bank0 --- len=256evthit=1ch numtamp 00x A => x05C046FF => x => x05601F21 => x A => x05410B19 => x => x05611E1E => x05021A1B => x05C23BFF => x => x05621F20 => x B => x05430C18 => x => x05631F1E => x =>

Tracker DAQ D Adey CM29 RAL 8/2/11

Readout Readout functions for VLSBs implemented and integrated with MICE equipment list Communication with VME/access of registers tested New AFE and VLSB firmware will require some changes, primarily shift from cosmic to beam data and triggering Unpacking also depends on new firmware and data format – work underway Reconstruction Cosmic ray reconstruction tested and will be used in upcoming test Helical reconstruction working, but lacks efficiency (will not do 600/s) and has areas for improvement eg. scattering/energy loss in the Kalman noise Improvements to space point level recon, fast helical fit and improvement of Kalman also in progress

Cosmic Ray Test Plan Hardware ready to go shortly Tom, Paul arrive Friday/Monday Upgrade firmware Test readout with new version of spreadsheet Test with internal fixed freq trigger, internal variable freq trigger, external mimic of ISIS RF signal (variable freq) Test readout with modified DATE - David

Summary Make upgrades to firmware and readout –No running directly from control room Start 2011 cosmic ray data-taking by Feb 25 –Assess data monthly (max 3 months) By end of May (latest) make trackers safe and put into storage