Monitoring & Managing NG9-1-1 Systems & Services MICHAEL SMITH RICK BLACKWELL A CAST OF THOUSANDS.

Slides:



Advertisements
Similar presentations
Calculating service use at a district and regional level Kovin Naidoo ICEE Africa Director Vice President AFCO.
Advertisements

Software Quality Assurance Plan
Checking & Corrective Action
Brian Rosen Chair, Long Term Definition WG.  i1 = document older strategies for VoIP into  i2 = standard way to support VoIP on current E9-1-1.
TASK: RESEARCH AND CREATE A SEVERE WEATHER POSTER DESCRIPTION OF SEVERE WEATHER WHAT IT IS WHERE IT OCCURS WHEN IT OCCURS WHY IT OCCURS EFFECTS OF WEATHER.
Janet SLA Review. A Service Level Agreement that – Measures the service as a whole for the funders – Measures the service for individual customers But.
Working Group 1: NG9-1-1 June 6, 2012 Laurie Flaherty Brian Fontes WG 1 Co-Chairs.
Best Practices – Overview
Orientation to Performance and Quality Improvement Plan
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
Business Process Management with Activiti João Silva (CERN, GS-AIS) 21st of October, 2014 BUSINESS PROCESS MANAGEMENT WITH ACTIVITI.
Fifth Grade Science Project
Determining System Requirements Classes 9,10. SDLC Project Identification & Selection Project Initiation & Planning Analysis ** Logical Design Physical.
Developing an accessibility policy. In this talk we will discuss What is an accessibility policy Why do we need one? Getting started - steps to consult.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
TF-NOC flash presentation. Network What infrastructure have your organization deployed? (e.g. fiber + equipment) What services are your organization offering.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
IB Business and Management 1.6 Business Plans. Learning Outcomes Analyse the importance of the importance of the information in the business plan to different.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Regional Seminar 2005 EVALUATING POLICY Are your policies working? How do you know? School Development Planning Initiative.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Refrences: Information Technology Project Management, Sixth Edition(ch#3) Note: See the text itself for full citations.
How do I use data to plan for learning? Module 6.
BSBPMG505A Manage Project Quality 8.1 Plan Quality Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of identifying.
University of Sunderland CIFM02 Unit 4 COMM02 Project Planning Unit 4.
1 emeronTI 3 kareFVIEpnk arKMerag Project Planning.
October 2004 Strategy Forum Academic Quality Improvement Program The Higher Learning Commission of the North Central Association of Colleges and Schools.
NG9-1-1 Processing Metrics DAN MONGRAIN MICHAEL SMITH RICK BLACKWELL, ENP.
Structuring Cooperative Learning: Examples from Small group learning in higher education (SGLHE) Karl A. Smith University of Minnesota Cooperative.
Building Blocks for the NG9-1-1 PSAP MICHAEL SMITH - DSS CORP. RICK BLACKWELL, ENP - GREENVILLE COUNTY, SC.
Next Generation 911 Committee. Text-to-911 Next Generation 911 Committee Technical Support RFP.
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Listen. Plan. Deliver. Project Delivery Summit – A Necessary Evil, and Why they are important… December 9, 2015 Project Delivery Summit Service.
Distance Learning and Accreditation Heather G. Hartman, Ph.D. Brenau University Online Studies and SACS Liaison.
9-1-1 ASSOCIATION - STEPS COMMITTEE 1/3/2013 NG9-1-1 TECHNOLOGY & PROCESS.
Student Achievement in the Expanded Core Curriculum: A Supported Discussion IESBVI Staff Conference October 2012 Carla Morrow & Cynthia White-Botello.
Unit 72 – Game Design Linked in with Unit 02: Communications Skills Introduction.
1 Scientific Method Learning Target: I can describe the steps in the scientific method.
Basic Concepts of Outcome-Informed Practice (OIP).
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
DOCUMENT CONTROL BASICS. Less clutter Avoid missing files More professional look?
The reading is 7.38 mm. The reading is 7.72 mm.
1. WELCOME Project Management Cycle (P.M.C.) What is a project? : What is project management?: Project management life cycle : Phase 1 st : Phase 2 nd.
Defining Map Services in NG9-1-1
Ronald Head Achieving the Dream Data Coach
HSE Incident Investigation and Corrective Action Procedure
The Latest NENA Standards: An Overview
Workplace Projects.
NENA Standards Under Construction
Fundamentals of Information Systems, Sixth Edition
Haleh Kootval, Samuel Muchemi Public Weather Services Programme
The Public Safety Broadband Network (FirstNet) & NG9-1-1
OHS Staff Introduction Training
Managing NG9-1-1 what could go wrong?
Quality in VNFIL Validation of Non-formal and Informal Learning – Opportunities for Special Target Groups , Kuopio, Finland Anni Karttunen.
Quality in VNFIL Validation of Non-formal and Informal Learning – Opportunities for Special Target Groups , Kuopio, Finland Anni Karttunen.
Chapter 3: The Project Management Process Groups: A Case Study
Project Prototype Demo 1 Grading Rubric
The Wachovia Regional Foundation
A significant visual EIAxxxxxx: “TITLE” INSTITUTION
Failover mechanisms if available
Day 1: Introduction to Ramp Tools
Project Management 101.
Structuring Cooperative Learning:
For More Details:
Writing a Lab Report.
7th East African Health & Scientific Conference
Presentation transcript:

Monitoring & Managing NG9-1-1 Systems & Services MICHAEL SMITH RICK BLACKWELL A CAST OF THOUSANDS

History of M&M ◦ NGTPC filed ISF to identify and describe those things that need to be monitored in our NG world ◦ Level of detail should be sufficient to identify areas that should be considered in RFPs and SLAs

History of M&M ◦ Expected outcome is an Information Document ◦ Targeted to  personnel who develop and manage PSAP processes and procedures  personnel responsible for ESInet and NGCS infrastructure

History of M&M ◦ Expected outcome is an Information Document ◦ Targeted to  personnel who develop and manage PSAP processes and procedures  personnel responsible for ESInet and NGCS infrastructure

M&M: Where We Are ◦ Visual Examples

History of M&M ◦ One of the first tasks undertaken was identifying stakeholders

Future Work for M&M ◦ When trouble occurs, what happens? ◦ Determine a list of possible impairments that could occur

Future Work for M&M ◦ Are We On The Right Track? ◦ What Are We Missing?

Future Work for M&M ◦ How is your State and/or Region managing NG9- 1-1? What’s the reporting structure? ◦ Are there formal agreements in place to help manage NG9-1-1?

Future Work for M&M ◦ What else?