1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
First analysis of DHCAL Data José Repond Argonne National Laboratory Linear Collider Workshop LCWS 2012 October 22 – 26, 2012 University of Texas at Arlington,
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
Jerry Blazey May 31, 2007 LCWS07 1 SiD: Hadron Calorimetry Jerry Blazey Northern Illinois University LCWS07-Hamburg May 31, 2007.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
Digital Hadron Calorimeter (DHCAL) José Repond Argonne National Laboratory CLIC Workshop 2013 January 28 – February 1, 2013 CERN, Geneva, Switzerland.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Building a tracking calorimeter for the ILC Valeria Bartsch University College London.
Tests of a Digital Hadron Calorimeter José Repond Argonne National Laboratory CALICE Collaboration Meeting March 10 – 12, 2010 University of Texas at Arlington.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Scintillator-based ILC detector R & D Status and Milestone DongHee Kim Kyungpook National University Joint Korea-Japan Collaboration KPS meeting, Spring.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
José Repond Argonne National Laboratory LCWS, Vancouver, Canada, July 19 – 22, 2006 American Test Beam Plans.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
CEPC 数字强子量能器读出电子学预研进展
A Digital Hadron Calorimeter Resistive Plate Chambers
SiD Calorimeter R&D Collaboration
CALICE scintillator HCAL
(My personal) CALICE Report
The DHCAL: an overview José Repond Argonne National Laboratory
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
ScECAL+AHCAL+TCMT Combined Beam FNAL
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Rick Salcido Northern Illinois University For CALICE Collaboration
Michele Faucci Giannelli
LC Calorimeter Testbeam Requirements
Presentation transcript:

1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results

2 Members of the Collaboration 3 regions 12 countries 41 institutes > 200 physicists

3 Technical prototypes Various technologies Can be only partially equipped Appropriate shapes (wedges) for ILC detectors All bells and whistles (cooling, integrated supplies…) Detailed test program in particle beams Goals of the Collaboration To provide a basis for choosing a calorimeter technology for the ILC detectors To measure electromagnetic and hadronic showers with unprecedented granularity To design, build and test ILC calorimeter prototypes To advance calorimeter technologies and our understanding of calorimetry in general Physics prototypes Various technologies (silicon, scintillator, gas) Large cubes (1 m 3 HCALs) Not necessarily optimized for an ILC calorimeter Detailed test program in particle beams

4 Detector Concept Optimized for PFA Compensating Calorimetry (hardware) SiDYesNo LDCYesNo GLDYes 4 th NoYes CALICE Projects and the Concepts CALICE Projects ECALsSilicon - Tungsten MAPS - Tungsten Scintillator - Lead HCALsScintillator - Steel RPCs - Steel GEMs- Steel MicroMegas - Steel TCMTs * Scintillator - Steel All calorimeters with very fine segmentation of the readout * Tail catcher and Muon Tracker

5 PFAs and Calorimetry Particles in jets Fraction of energyMeasured withResolution [σ 2 ] Charged65 %TrackerNegligible Photons25 %ECAL with 15%/√E E jet Neutral Hadrons10 %ECAL + HCAL with 50%/√E E jet Confusion ≤ (goal) 18%/√E Maximize segmentation of the calorimeter readout O(<1 cm 2 ) in the ECAL O(~1 cm 2 ) in the HCAL → O(10 7 – 10 8 ) channels for entire ILC calorimter YES! Fact Particle Flow Algorithms improve energy resolution compared to calorimeter measurement alone (see ALEPH, CDF, ZEUS…) How do they work? Minimize confusion term High segmentation The real challenge Can PFAs achieve the ILC goal?

6 Status of the various projects CalorimeterTechnologyDetector R&DPhysics Prototype Technical Prototype ECALsSilicon - Tungsten Well advancedExposed to beamDesign started MAPS - Tungsten Started Scintillator - LeadWell advancedExposed to beam HCALsScintillator - SteelWell advancedExposed to beamDesign started RPCs - SteelWell advancedAlmost ready to be build (Design started) GEMs- SteelOngoing MicroMegas - Steel Started TCMTsScintillator - SteelWell advancedExposed to beam Will concentrate on these in the following…

7 Collaboration → Advantages Shared hardware e.g. Si-ECAL/Scint-HCAL use same electronic readout system One steel plate stack and movable stage for all HCALs Shared mechanical structure for Si- and MAPS-ECAL Shared software All projects use the same DAQ software Shared test beams DESY group helped ECALs when testing at DESY One test beam effort at CERN involving Si-ECAL, Scint-HCAL, TCMT Facilitates combined tests e.g. Si-ECAL+Scint-HCAL+TCMT at CERN in 2006/2007 ECALs+HCALs+TCMT at FNAL in 2008/2010 Shared knowledge CALICE meetings (3/year) are an excellent forum to report/discuss progress/ideas

8 CALICE Test Beam Activities DESY electrons 1 – 6 GeV Silicon-ECAL Scintillator ECAL Scintillator HCAL TCMT CERN electrons and pions 6 – 120 GeV Silicon-ECAL Scintillator HCAL TCMT (complete) FNAL protons at 120 GeV 3 RPCs 1 GEM 10 RPCs+4 GEMs 2006 – Fall 2007 CERN 2006

9 Silicon-Tungsten ECAL Physics prototype 3 structures with different W thicknesses 30 layers; 1 x 1 cm 2 pads 12 x 18 cm 2 instrumented in 2006 CERN tests → 6480 readout channels Electronic Readout Front-end boards located outside of module Digitization with VME – based system (off detector) Tests at DESY/CERN in 2006 Electrons 1 – 45 GeV Pions 6 – 120 GeV 1 X 0 (W) = 3.5 mm

10 Linearity with electrons Two different weighting schemes Non-linearity at the 1% level Resolution with electrons Close to expectation from MC Transverse shower profile Moliere radius R M contains 90% of EM shower energy independently of energy R M (W) = 9 mm Gap will increase R M (W) → R M eff

11 Study of inter-wafer gaps Decrease in response in both x and y ~ 12 % Developed a correction procedure Effect on resolution Correction improves resolution → eliminates asymmetric tail Resolution away from gap still better

12 MAPS ECAL Monolithic Active Pixel Detectors In-pixel comparator and logic 50 x 50 μ m 2 pixels Digital (single-bit) readout → pixels for the ECAL 84 pixels 42 pixels Test Sensor Area of 1 x 1 cm 2 → ~ 28,000 pixels Testing two different architectures Pre-shape pixel analog front-end Pre-sample pixel analog front-end Submitted in April → In hand by July Extensive simulation studies Charge collection effects Resolution versus threshold ….

13 Scintillator-Tungsten ECAL Offers the possibility of hardware compensation beam Tested different set-ups WLSF and groves No WLSF (direct coupling) WLSF in extruded scintillator Physics prototype 26 layers 1 x 4.5 x 0.3 cm 3 scintillator strips Read out with Hamamatsu MPPCs + Scintillator-HCAL electronics

14 Tests in DESY electron beam: 1 – 6 GeV Data taking in April 2007 → Preliminary results Results Resolution as expected from simulation Longitudinal shower shape: problems with layer #6? 1 GeV e -

15 Scintillator HCAL First calorimeter to use SiPMs Electronic readout Silicon Photomultipliers (SiPMs) Digitization with VME-based system (off detector) Tests at DESY/CERN in /38 readout planes Electrons 1 – 45 GeV Pions 6 – 50 GeV Physics prototype 38 steel plates with a thickness of 1 X 0 each Scintillator pads of 3 x 3 → 12 x 12 cm 2 → ~8,000 readout channels

16 Calibration is important! Corrections for Light yield non-uniformity SiPM gain variations (temperature, V bias ) SiPM non-linearity of response Non-uniformity in readout electronics Light yield Determined from ratio of MIP response and gain Average ~16 pix/MIP RMS ~ 20%

17 Analysis of electron data Important cross check before tackling hadron data More sensitive to SiPM non-linearity corrections Number of hits and their energies More hits in data than MC Non-linearity corrections not yet perfect at high hit energies 10 GeV e - 45 GeV e - 10 GeV e - 45 GeV e -

18 Electron data: Longitudinal shower profiles Pretty good agreement with prediction Shower maximum earlier in data: more dead material in beam line?

19 Analysis of pion data Smaller hit energy → Less sensitive to SiPM non-linearity corrections Analysis of inclusive and contained events Use TCMT to reject events with leakage 10 GeV π Inclusive data Contained events

20 Resolution Fit contained data in the range ot ±1.5 σ Response Small residuals < 0.5% DATA GCALOR+FLUKA+MICAP GHEISHA Geant3

21 Shower Profiles For different π energies between 6 and 20 GeV Requirement of MIP signal in ECAL Comparison with simulation forthcoming… Longitudinal shape Transverse shape

22 Tail Catcher Muon Tracker (TCMT) TCMT Steel absorber: layers 1 – 8: t = 2 cm 9 – 16: t = 10 cm Scintillator strips of 5 x 100 x 0.5 cm 3 Alternate x, y orientations Complete TMCT in October 2006 CERN run Electronic readout SiPMs as for scintillator HCAL Same electronic system as scintillator HCAL

23 Combined analysis Adding TCMT energies clearly improve resolution 20 GeV π

24 Digital HCAL Active elements considered Resistive Plate Chambers (RPCs): R&D (virtually) complete Gas Electron Multipliers (GEMs): R&D ongoing MicroMegas: R&D initiated RPCs and GEMs were tested in FNAL test beam Physics prototype {16 mm steel plates + 4 mm copper (cooling) } x 38 Re-use stack from scintillator-HCAL Electronic readout system 1 x 1 cm 2 pads with digital (single-bit) readout → Large number of channels (400,000 for physics prototype) One-bit (digital) resolution with on-detector ASIC Currently preparing Vertical Slice Test → if successful initiate construction of physics prototype

25 Vertical Slice Test Involves 10 RPCs and 2 GEMs ~ Same electronic readout system as physics prototype section Tests with cosmic rays and in FNAL test beam (June/July 2007) Current status Cosmic ray test stand and test beam stack ready RPCs and GEMs partially built and tested Electronic readout system being commissioned Front-end ASIC (DCAL chip) fully tested Pad boards fabricated (no assembly) Front-end boards: 2/12 assembled and tested Data concentrators: 2/12 assembled and tested Data collector: 3/1 assembled and tested Timing and Trigger module: 1/1 being tested DAQ software taking data Offline analysis almost ready Gas and HV systems ready MoU with FNAL for test beam being signed First 1,000 Cosmic Ray Events Collected

26 Towards Technical Prototypes Silicon – Tungsten ECAL Module Designing the alveolar structure Many studies: cooling, gluing, production… Chips and bonded wires inside the PCB Effective active gap thickness ~ 2,200 μ m

27 Scintillator – ECAL/HCAL Designing HCAL base unit Many studies: SiPM coupling… SiPM – MPPC Studies Uniformity across 3 x 3 cm 2 tiles for direct or WLS readout Comparison of SiPMs and MPPCs

28 Very Front-end Electronics Development of on-detector digitization ASICs Power pulsing (reduction of power consumption) 2 nd generation data acquisition Development of new architecture Using new tools, such as High-speed networking Optical switches …. Si-W ECAL Scintillator E/HCAL Digital HCAL

29 Conclusions Project2007b2008a2008b2009a2009b ECALSi-WCERN test beam FNAL test beam MAPS1 st prototype chip 2 nd prototype chip DESY test beam ScintillatorFNAL test beam HCALScintillatorCERN test beam FNAL test beam RPCVertical slice test in FNAL test beam Physics prototype construction FNAL test beam GEMVertical slice test In FNAL test beam Further R&D on GEMsPhysics prototype construction FNAL test beam MicroMegas1 plane TCMTScintllatorCERN test beam FNAL test beam Test beam activities with physics prototypes + further R&D, technical prototype designs, construction & testing…