CARE SC meeting, CERN, 13th September, 2006. Report on SRF Work-packages 7 - 11 WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration.

Slides:



Advertisements
Similar presentations
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
OPTIMISATION OF BEAM INJECTION INTO THE FIRST ACCELERATING MODULE AT TTF2 WITH CAVITY DIPOLE MODE SIGNALS N. Baboi, H. Schlarb, M. Wendt, G. Kreps, DESY,
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Structure of the task 12.2 Claire Antoine Eucard2 WP12 DESY
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Task 12.4: SRF HOM Beam Diagnostics R.M. Jones, U. van Rienen, T. Flisgen, N. Baboi (UMAN, UROS, DESY)
Compressor status AWAKE Technical Board meeting 19 August 2015.
N. Baboi, DESY EuCARD WP10 Kick-off Meeting, 24 Mar HOM-couplers (pick-ups) HOMBPM - Overview Purpose: on-line measuring device for 1. beam.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
CARE JRA1 SRF COUPLERS TUNERS LOW LEVEL RF CRYOSTAT INTEGRATION TESTS BEAM DIAGNOSTICS Treated in highlight talks by P. Sekalski and S. Simrock Work-packages.
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Cavity Alignment Using Beam Induced Higher Order Mode Signals in the TTF LINAC Olivier Napoly, Rita Paparella CEA/DSM/DAPNIA, Gif-sur-Yvette Marc Ross,
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
JRA1 – SRF report CARE Steering Committee meeting,
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
16/01/12DITANET Topical Workshop on Beam Position Monitors Reentrant Beam Position Monitors DITANET Topical Workshop on Beam Position Monitors 16 th –
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
1 st TIARA Steering Committee A. Gallo – INFN Frascati deputy of TIARA WP8 leader STATUS OF TIARA WP8.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Power coupler at DESY & for XFEL
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
HIE-LINAC status report
EuCARD RF-Tech Meeting 2 December 2010, PSI
Fabrication of KEK-ATF2 Q-BPM
High Precision SC Cavity Alignment Diagnostics with HOM Measurements
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Breakout Session SC3 – Undulator
Presentation transcript:

CARE SC meeting, CERN, 13th September, Report on SRF Work-packages WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration WP11Beam Diagnostics

CARE SC meeting, CERN, 13th September, Power Couplers Task 7.1 New proto-types –“All-brazed” couplers received from CPI following TiN coating (just last week). –2 TTF-V couplers received prior to summer vacation. Not centered on 1300 MHz! S 11 is only 11 dB. –Second pair of TTF-V couplers had window coating problem. They will be re-coated.

CARE SC meeting, CERN, 13th September, Top right: TTF-V window Top left: TW60 window Bottom: Wave-guide test box. Insufficient TiN coating

CARE SC meeting, CERN, 13th September, Power Couplers Task 7.2 Construction of TiN coating Bench Contract signed with Italian company for construction of bench. Delivery ~ July Based on magnetron sputtering under vacuum. Tests have been performed on TiN samples coated on an alumina substrate to verify the chemical composition.

CARE SC meeting, CERN, 13th September, RF power as a function of time for different pulse widths. Electron activity as a function of RF power and pulse width. Power Couplers Task 7.3: Coupler Conditioning Studies

CARE SC meeting, CERN, 13th September, Power Couplers

CARE SC meeting, CERN, 13th September, WP7 schedule

CARE SC meeting, CERN, 13th September, 2006.

Low Level RF Task 9.1-Transient detector connected in ACC1 Electronics improved to allow un-interrupted operation. Task On-line radiation monitor installed No report from Work-package leader !!!

CARE SC meeting, CERN, 13th September, Cryostat Integration Tests CryHoLab being shipped to main Saclay site in summer of this year. Seven months needed to be operational again.

CARE SC meeting, CERN, 13th September, Modification needed for cavity flange WP10 Schedule

CARE SC meeting, CERN, 13th September, ‘BPM DESY’ BPM 14ACC7 Re-entrant BPM Tests at DESY – August 2006

CARE SC meeting, CERN, 13th September, Good linearity Apparent lack of symmetry Maybe due to steering magnets (saturation, residual field) ?? Summary of BPM tests in August 2006 – 1/2

CARE SC meeting, CERN, 13th September, RMS resolution: ~ 40 µm (depending on beam jitter) Theoretical resolution: 15 µm Aim to improve the resolution while maintaining the dynamci range Remove attenuators (~ -3 dB) ---> resolution <10µm (in theory) Change the power mixer (input RF power ~ 16 dBm) ---> resolution < 1 µm (theoretically) Summary of BPM tests in August /2

CARE SC meeting, CERN, 13th September, Status of HOM Activity at FLASH Cavity relative misalignments measured in ACC4 and ACC5 BPM-like resolution measured around 10 µm for position and 200 µrad for angle Thesis of Rita Paparella finished, examination on September 22. Journal publication submitted collectively to PRST-AB, this month. Residual of the x offset prediction using the HOM analysis for cavity #5 in module #5.

CARE SC meeting, CERN, 13th September, Summary of BPM tests in August 2006