ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
1 July 19, 2005German Martinez – SX5 Meeting RBX Temperature Monitoring Proposal German Martinez.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
Uli Schäfer DCS / standard path CANopen ELMB Host adapter OPC server Ethernet Windows or Linux PC SCADA: PVSSII O O D Software and firmware for standard.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Susanne Kersten, Wuppertal University November 21/22, 2013.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Peter Chochula ALICE DCS Workshop, October 6,2005 DCS Computing policies and rules.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
SA Ch High Voltage Module Main Features for each channel: V out = 12 kV I out = 1 mA R ipple = < 200 mVpp.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
ATLAS MDT HV – LV Detector Control System (DCS)
Pierluigi Paolucci - I.N.F.N. Naples
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI

ALICE DCS Workshop 9 October 2006 Introduction Michele NITTI Electronics engineer from “Politecnico di Bari” Joined the DCS team on 1 st july 2006 Responsible for 1 st line support of: CAEN HV & LV System BCAM System ELMB System

ALICE DCS Workshop 9 October 2006 Organization OPC / TCP IP CAEN Company (OPC) Oliver Holme (TCP / IP) Viatcheslav Filimonov (OPC) FTS: 1 st line Support Michele NITTI Fw Components Manuel Gonzalez IT/CO Oliver Holme IT/CO Jim Cook ATLAS Reference System DCS Lab ALICE Users CAEN ps BCAM ELMB H / W Via ESS grp Detectors Via DCS Team

ALICE DCS Workshop 9 October 2006 CAEN: Ref. System in DCS Lab Crate SY2527 Firm. V Branch Controller A1676 Boards: A1518A: 6Ch 4.5V 6A A1517A: 6Ch 7V 4A A1513A: 6Ch 10V 2.7A A1519: 12Ch 250V 100uA-1mA Crate EASY3000 EASY Boards A3009: 12 Ch 8 V / 9 A RED = Available from December 2006 Recommend S/W versions: - PVSS 3.1 -Framework OPC Server 2.12 Boards not yet supported: A3485, A3602, A3501, A3802.

ALICE DCS Workshop 9 October 2006 CAEN Users HMPIDLV + HV TOFLV + HV SSDLV + HV FMDLV + HV SPDLV + HV ACORDELV + HV PMDLV + HV CPVHV T0 / V0LV + HV ZDCHV MTKHV MTGHV

ALICE DCS Workshop 9 October 2006 BCAM: Ref. System in DCS Lab Ethernet Driver Box BCAM Sensor Mux Recommend S/W versions: PVSS 3.1 TCP / IP LWDAQ Server This is available for download from: fwLwdaq (Prototype version) RED = Available from December 2006

ALICE DCS Workshop 9 October 2006 BCAM System Applications Spaceframe monitor The Longitudinal Monitoring System (LMS) in GMS

ALICE DCS Workshop 9 October 2006 ELMB: Ref. System in DCS Lab USB2.0 CAN Bus ELMB Cards Ethernet USB Multiport CAN Gateway Recommend S/W versions: PVSS 3.1 Framework ELMB CANOpen OPCServer PT100 / 1000, NTC.

ALICE DCS Workshop 9 October 2006 ELMB System Applications Strain Gauge Sensors Temperature Sensors Hall Probe Sensors

ALICE DCS Workshop 9 October 2006 THE END Thanks