TcpTunnel – Setting Out and Surveying for Tunnels TcpTunnel
TcpTunnel – Setting Out and Surveying for Tunnels INDEX Main Features Program Structure Surveying Setting Out Tools and Utilities
TcpTunnel – Setting Out and Surveying for Tunnels Main Features Total Stations and Platforms Supported Total Stations Geodimeter, Geomax, Leica, Nikon, Pentax, Sokkia, Spectra, Trimble, Topcon Devices Mobile devices with ARM processor Operating Systems Microsoft Windows CE / Mobile version 4 or later
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Main Menu Clear structure of software Data organized in projects ASCII data files Windows-based user interface Easy to use
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Projects (1) OptionsProperties
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Projects (2) Supported FilesComponents
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Tunnel Templates ManagementAssignmentsDrawing
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Cross-section Types Creation of Simple and Composite sections in Mobile Device Creation of Complex cross-sections in CAD
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Other Files Supported (1) Horizontal AlignmentsVertical AlignmentsSuperelevations
TcpTunnel – Setting Out and Surveying for Tunnels Program Structure Other Files Supported (2) PointsControl Points
TcpTunnel – Setting Out and Surveying for Tunnels POSITION Angular By CoordinatesResection
TcpTunnel – Setting Out and Surveying for Tunnels Setting up Theoretical Points for Surveying and Setting Out Angle, Height or Length Methods Theoretical Points Height Angle Length
TcpTunnel – Setting Out and Surveying for Tunnels SURVEYING
TcpTunnel – Setting Out and Surveying for Tunnels Surveying Cross-Section Survey (1) Cross-section Points DefinitionData Entry
TcpTunnel – Setting Out and Surveying for Tunnels Surveying Cross-Section Survey (2) Front ViewPlan View
TcpTunnel – Setting Out and Surveying for Tunnels Surveying Point Measurements Point Measurements
TcpTunnel – Setting Out and Surveying for Tunnels Surveying Grid Data EntrySurvey Grid
TcpTunnel – Setting Out and Surveying for Tunnels Surveying Points Scan Data EntryDrawing
TcpTunnel – Setting Out and Surveying for Tunnels SETTING OUT
TcpTunnel – Setting Out and Surveying for Tunnels Setting Out the Front Data Entry
TcpTunnel – Setting Out and Surveying for Tunnels Setting Out Cross-Sections Setting Out Cross-sections Data Entry
TcpTunnel – Setting Out and Surveying for Tunnels Setting Out Rock Bolts Measured Data Theoretical Data
TcpTunnel – Setting Out and Surveying for Tunnels Setting Out Road Surface Data Entry
TcpTunnel – Setting Out and Surveying for Tunnels Setting Out Points Data Entry
TcpTunnel – Setting Out and Surveying for Tunnels CHECKING
TcpTunnel – Setting Out and Surveying for Tunnels CHECKING Cross-sections and Points Checking Cross-sectionsChecking Points
TcpTunnel – Setting Out and Surveying for Tunnels CHECKING Cross-sections Drawing Theoretical and Measured Cross-sections Under-excavation and Over- excavation Areas Calculation
TcpTunnel – Setting Out and Surveying for Tunnels TOOLS
TcpTunnel – Setting Out and Surveying for Tunnels Point Analysis on Alignment Point Coordinates Calculation Point Analysis on Alignment
TcpTunnel – Setting Out and Surveying for Tunnels Distance and Area among Points Distance between Points Area among Points
TcpTunnel – Setting Out and Surveying for Tunnels SETTINGS
TcpTunnel – Setting Out and Surveying for Tunnels Setting Options (1) Intrument Options Units of Measurement
TcpTunnel – Setting Out and Surveying for Tunnels Setting Options (2) Communications Tolerances Survey