N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#79353 New Ohio River Bridge Steubenville Weirton Map Data © 2015 Google Steubenville, OH - Weirton,

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Great Western Corridor Feasibility Study
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Environmental Assessment Public Meeting
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
DETERMINATION OF FREIGHT CORRIDORS FOR THE STATE OF CALIFORNIA Texas A&M University Civil Engineering Department CVEN April 28, 2003 ADHARA CASTELBLANCO.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Special STP Application Cycle for SFY 2016 Projects ICC and Executive Committee Meetings September 2015.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
A Regional Approach for Fort Carson Growth Planning Fort Carson Growth Plan Update Town Hall Meeting February 6, 2009 Mayor Tyler Stevens, Board of Directors.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
TYPE OF WORK FY 2015 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH K -- Rural Road.
TRAC Presentation October 13, 2015 BEL-70-Mall Road Connector “Commons Mall Crossing” PID Belmont County Transportation Improvement District.
STA US-30 Presentation for TRAC – October 13, 2015
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Keith Smith, P.E. ODOT District 8 Environmental Engineer October 2015.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
TRAC T IER 1/M ULTI -P HASE A PPLICATION Presented by KYOVA & the Lawrence County Community Action Organization PID:
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
ALL-LIMA-Railroad Grade Separation Project, PID TRAC Public Hearing October 13, 2015.
MED SR 18 Corridor Project MED PID October 13, 2015.
2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-02 HAM-Elmore to Central Parkway Connector.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
INTERNATIONAL DRIVE CRA FY Budget Worksession July 11, 2011.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Chapin Town Hall Meeting
Panama City – Bay County International Airport Project Update
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Florida Transportation Commission FY 2009
Transportation Improvement Program and Air Quality Conformity Analysis
Belpre Construction / Post Construction
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Southern Bridge Project Brown County Executive
DRAFT (MOVE $100M) FUNDING CATEGORY WEST ($ IN BILLIONS)
Walker Street Reconstruction Project 25% Design Public Hearing
Design and Engineering Services
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#79353 New Ohio River Bridge Steubenville Weirton Map Data © 2015 Google Steubenville, OH - Weirton, WV Metropolitan Area 1 East Liverpool (US30) to Steubenville (US22) – 25 miles Steubenville (US22) to New Bridge – 9 miles New Bridge to Wheeling (IR70) – 15 miles East Liverpool

PROJECT STUDY AREA Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#79353 Fort Steuben Bridge Demolished 2012 Market St Bridge 5 Ton Load Limit US 22 Veterans Memorial Bridge Opened to Traffic 1990 New Ohio River Bridge Study Area 2

REGIONAL PRIORITIES P RIORITY #1 – Construct a New Ohio River Bridge South of Wellsburg, WV to Brilliant, Wells Twp, Jefferson County, OH - Proposed Project Sale Date – Spring 2016 (Design/Build/Finance) P RIORITY #2 – Construct Capacity Improvements at the University/SR 7 Intersection and Related Ohio Access Approaches to the Veterans Memorial Bridge - Project Sale Date – October 2015 Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#

BHJ B RIDGE S YSTEM S TUDY R EPORT Initiated in October Completed September 2003 KEY ISSUES 1.Ft Steuben Bridge Demolished Market St Bridge renovated in 2010 to extend the life by 7-10 years, but even with the renovation it has a 5-ton weight limit 3.Having only one regional Ohio River crossing creates major safety, emergency, and economic issues Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#

S TRATEGIC T RANSPORTATION S YSTEM (STS) C ONNECTIONS The proposed bridge connects with SR7, an STS Corridor The proposed bridge connects Ohio SR7 with West Virginia SR2 along the Ohio River. Approximately 1 mile south of the proposed bridge in West Virginia is an industrial development site owned by the Northern Panhandle Business Development Corporation (BDC), similar to a port authority in Ohio. Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#

N EXT S TEPS ( ) WV Funding Plan Adopted by TIP Amendment September 2015 Finalize State Line Construction Agreement Complete 30 Percent Design Plans Initiate Right of Way Acquisition Project Sale for Construction Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#

Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID# Project Development Schedule PhaseCompletion Date Planning StudyMay 1, 2003 Environmental / NEPA ApprovalNovember 18, 2013 Preliminary Engineering StudiesNovember 1, 2015 Detailed Design / Construction AwardDesign / Build - Spring 2016 Right-of-way AcquisitionJuly 1, 2016 Utility RelocationDecember 1, 2016

Steubenville, OH - Weirton, WV Metropolitan Area N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#79353 Project Funding Plan Non TRAC FundingTRAC Funding Project PhaseFYLocalODOT Ohio TurnpikePreviousNewFuture Phase Total Planning Study (PS)$0.15 $0.30 Preliminary Engineering (PE)$0.60 $1.20 Detailed Design (DD)2014$8.00$2.00$10.00 Right-ofway / Utilities (RW)2015$1.50$0.90$2.40 Construction (CO)2016$88.68 $36.77 * $ Funding Source Total$98.93$0.15$0.00$3.50$36.77$ Funding Percentage71.0%0.1%2.5%26.4% 8 ODOT to pay WVDOH ten equal yearly installments of Ohio’s construction share beginning in FY 2017 *