Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.

Slides:



Advertisements
Similar presentations
THAI TOKO ENGINEERING CO.,LTD.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Steel Construction.
F&T Inc. OVERHEAD CRANE SAFETY.
Substation L1/ MCC L1 Update March 21 st, Current Location.
Lockout & Tag Presented by Name Title Date. Course Outline Lock-out definitions Legal responsibilities Lock-out procedure Frequent mistakes Removing a.
Skyscraper Construction
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Power Status Thomas Nehring Conventional Facilities Advisory Committee Review October 5-6, 2010.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Electrical Power Systems
The Vanjen Group • Manufacture's Representative – Power Generation/Oil & Gas • Covering TX, OK, LA, AK, in some cases NM and MS • Extensive.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
ELECTRIC CIRCUIT VISUAL INSPECTIONS COURSE OBJECTIVES DISCUSSION AND REVIEW OF ELECTRICAL INSPECTION TECHNIQUES AND METHODS.
Panels and Subpanels. Main Service Panel aka Load Center The Load Center is the heart and soul of a home’s electrical system. It: – Serves as a distribution.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Trindel Insurance Fund
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
1 Air Conditioning Breaker Panels and Disconnects.
PIP Update 3 September 26 th, L1 Future Plans  Installation is halted until further notice (plan for 2014 shutdown or when needed)  Substation.
University Information Technology 1 TAB Data Center Renovation Update 11/08/12.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
1 Falls Module 2. 2Objectives After this module you should be able to – identify the most common fall hazards – take the steps necessary to avoid those.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
Introduction & Overview Company Number , registered in England & Wales. December 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
SERVICE ENTRANCE EQUIPMENT
Sling Safety (Level 1 Rigger). Objectives Be familiar with regulations regarding slings. Be familiar with regulations regarding slings. Understand safe.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
ETP 1138C Week #2 Advanced print reading basics (Types of Engineering documentation) This week we will cover the following topics in class: We will introduce.
ELECTRICAL INSTALLATION IN BUILDING
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
Hot Work Permit Osan AB Fire Emergency Services.
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Presentation on Sub-station Design, Operation, Maintenance & Safety
E450AJ BOOMLIFT for DECAM Tasks
F&T Inc. OVERHEAD CRANE SAFETY.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
LOCKOUT/TAGOUT By: Kory Hildebrand.
Isolation Procedure Topic 2, Unit 6.
Presentation transcript:

Substation L1/ MCC L1 Update #2 July 27,2012

Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place August 8-10  Delivery will occur soon after testing is completed  MCC  All approval drawings submitted  Expected arrival date of Mid to Late August (55-75 working days after approval drawings reach factory floor)  Drawings approved on 5/30/2012  Cable  All cable delivered  Stored in LINAC  350 MCM will be stored at warehouse until installation is closer  Panelboard  Delivered  Needs to be assembled

Status of Procurement (Cont.)  Safety Switches  Delivered  Stored in LINAC  Cable Supports  Delivered  Stored in LINAC  Support Structures  Will be built out of unistrut  Assembly has not yet begun  Support frames will be built in house  Junction Box  Drawing is complete  Fabrication companies have yet to respond  Since only one needs to be ordered it is unlikely that a company will construct this enclosure  Will be submitting the drawing to the machine shop soon

Project Schedule  Currently at a stand still  Complexity  Safety issues  Install should still be okay for originally planned September install  General Cleanup 2-3 weeks prior to shutdown of substation  Temporary electrical power will be setup the weekend prior  It could take riggers several days to remove and install substations  Small clearances  Large weights  May be several more days if given okay to shore the floor

Issues  Substantial Weight Increase  10,500 lbs. vs. 17,700 lbs.  Gallery floor has a very low load limit (350 lbs./sq. ft.)  This could effect everyday operations  Fork lifts, Tour groups, Removing equipment from downstairs  Could be wrong  Stevenson has no suitable indoor crane  Ceiling height is too low for carrydeck crane  55,000 lbs.  Shoring the floor may not be a possibility  Much of the transformer will need to be dismantled  Secondary bus bars, frame, sheet metal  Increases electrician time

Suggestions  FESS has been notified that it needs to begin looking into ways to fix this issue  Cut a hole in the ceiling  Has been done at other sites around the lab  Install outside  Requires Federal to make outdoor gear  Engineering Expense  Siemens subcontract issue  Expensive cable runs  Rigging job would be simplified  Aesthetics committee

Temporary Power Plan  “Siphon” power from panel DHP-L2-2 Circuit #1  Cable will be run on temporary supports  4 conductor 350 mcm cable is heavy (~7 lbs./ft.) and will need an open area to lay  Some cable will be put on the floor but will be covered by a cable bridge  Setup 2 temporary panel board(s)  Run cable to individual loads  DHP panels, MCC loads  DHP panels will be locked out and tagged out  Group lockbox  MCC loads will have configuration control locks  We will check current prior to using any MCC loads to ensure they will not trip off during operation  Power will be provided 24 hours a day

Installation Costs  1 Crew of Riggers (4-6 men)  Unknown Cost  Will remain unknown until a plan is put in place by FESS  2 Week of Electricians  $100/manhour x 2 electricians x 80 hours = $16,000  Cable  2/0 - $3,500  2 – $3,700  House Power  $4,200 for panelboard  $2,000 for assembly  Miscellaneous Stock purchases  $2,100 Total Cost : $31,500 -> excluding rigging Previous Estimate: $23,000 -> excluding rigging Increase can be attributed to increased electrician time and panelboard cost

Commissioning  Visual Inspection  Hi-Pot  Disconnect panel boards from temporary power  Reconnect panel boards  DHP-L1-1 will be turned on first  Fire alarms  Lighting  Etc.  DHP-L1-2  DHP-L1-3

What Will Become of the Removed Equipment?  Transformer will be kept as a spare  Currently have 1 spare for 8 transformers (5 – high rise, 3 – LINAC)  Transformer will be examined to make sure it is in good working order  Will be stored in Booster parking lot  Will be placed on a truck the same day it is removed to avoid excess rigger fees  Breakers  Will be rebuilt and tested  Used as spares  Primary Switch  Will be rebuilt and tested  Used as a spare

Future  Create Site Wide Monitoring Network PIP Project Not PIP PIP Project ???? Note: CG-1 has been moved from PIP schedule, and will now be handled by headquarters

Booster Y-BE2 Update  What we did  Current measurements  Voltage measurements  Thermal imaging scans  Listened  Disconnected all loads Y-BW2 Y-BE2  What we will do  Move Spare to F0  All tests that are performed on new transformers will be performed on spare  Oil samples  Order new substation