1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Transmission Planning in the West pocket guide This reference guide is intended to assist individuals new to transmission planning in the Western Interconnection.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
COM Operating Personnel Communications Protocols
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
Montana Energy Summit Transmission Planning Process April 22, 2008.
Duke Energy Carolinas Stakeholder Meeting Independent Entity Services September 12, 2008.
WebCast 5 May 2003 NERC Cyber Security Standard Overview of Proposed Cyber Security Standard.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Towards Regional Independent Operators – a main driver for successful market integration.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Regional State Committees – The Midwest Approach Susan E. Wefald, President Organization of MISO States NARUC Summer Meeting – The Status of State Committees.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
High-Level Meeting of Regional Energy Regulatory Associations of Emerging Markets Sergey Novikov Head of the Federal Tariff Service (FTS of Russia) April.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Market Position Statement Voluntary Sector Forum 26 May 2015.
OSC Meeting April 27, Transmission Cost Allocation Overview.
COMMON USE SYSTEM March 5, 2008 Black Hills Power Service Center Rapid City, SD TRANSMISSION COORDINATION AND PLANNING COMMITTEE.
Status Report for Critical Infrastructure Protection Advisory Group
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Transmission Planning at the California ISO September 10, 2015.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
WebCast 5 May 2003 Proposed NERC Cyber Security Standard Presentation to IT Standing Committee Stuart Brindley, IMO May 26, 2003.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Updated 1/28/2011.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Model Data Collection Meeting Announcement Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT August 2015 Budget Process Consolidating intergovernmental transfers to local government 1.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Transmission Studies for New Long Term Network Resources Doug Powell Manager Technical System Planning Entergy Services, Inc. September 11, 2006.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
FERC Order 1000 and its Potential Implications for BCCPG Transmission Providers BCCPG Steering Committee Meeting 20 September 2011.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
IEEE TGa Project Timeline
Massachusetts Electric Restructuring Roundtable
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Portfolio Management Process & Customer Request Management
Reliability Standards Development Plan
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TGac Status and Timeline
Incentives for electricity infrastructure – ERGEG view
SDS Review of Scenario Studies Timeline
Origins of the NCAP National Standards Strategy
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003

2 SeTrans/ITC Planning Process Key Principles SeTrans has authority over the planning process Ensure transmission system reliability through compliance with planning criteria Ensure non-discriminatory access to the transmission system Involve stakeholders at all levels of the planning process SeTrans is the single point of contact for transmission service, including generation interconnection studies SeTrans planning process is an open, transparent and participatory process

3

4 Purpose of Sub-Region Planning Process Provide the necessary attention to local area issues (reliability and load-serving capability) Provide a point of contact for local transmission customers Continue the dialogue between the Entergy and its customers (e.g., network service customers, generators, load-serving entities, TREPs, regulators) –customer planning meetings –technical conferences with stakeholders –develop solutions to local area concerns –propose regional solutions to be evaluated at the regional level Provide a Sub-region Expansion Plan to be incorporated and approved by the SeTrans Simulate the Sub-region Planning Process of SeTrans Planning Protocol

5 Planning Process Sep. – Oct. 2002: Customer input for 2004 and beyond projects Feb. 2003: Rank list of 2004 long range projects Feb. to July 2003: Scoping process Mar. and June 2003: Joint planning meetings with stakeholders July 10, 2003: Transmission Planning Summit End of July 2003: 2004 budget allocations determined End of Aug. 2003: Customer Input for 2005 projects Aug. – Sep. 2003: 2004 budget system opens Sep. – Oct. 2003: Customer input for 2006 and beyond projects January 2004: Board of Directors meeting to approve 2004 projects