KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 3May20121.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - tests on prototypes - pipe production by Lamina - gluing exercises - time schedule - conclusions.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CEDAR Cooling (CEDAR Meeting 23 rd May 2011) Tim Jones.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Design Progress Allen Ellis 18-September
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Installation of the T600 at Fermilab CSN2, September 22,
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Update on PANDA solenoid design
QXF Coil Fabrication & Tooling Reaction / Impregnation
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
F.E.T.S. Mechanical Engineering Update
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
cooling and supports of the forward endcap EMC
Performances of the NA62 RICH detector
Performances of the NA62 RICH Detector
LHC Experimental Vacuum Systems Status October ‘07
LumiCal mechanical design, integration with LDC and laser alignment
Vertex Detector Mechanical R&D Design Questions and Issues
FRESCA2 Update on the dipole design and new calculations
Pierre-Alexandre Thonet
WG4 – Progress report R. Santoro and A. Tauro.
UK CMS Oversight Committee Mtg
NPS mechanical design 01/31/2019 Jlab meeting
Presentation transcript:

KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 3May20121

KTAG Schedule for Technical Run Build stage-1 detectorJanuary 2012 to July 2012 – Half detector (4 octants)[Incorporate improvements later] – 32-channel readout[Final design is 64] – Preliminary optics [defer cost and complexity] CEDAR ActivitiesMay – December 2012 – Dry run and DAQ integration15 – 31 July – Complete and test KTAG in UK31 July – Install KTAG & IntegrationAugust - September – Technical Run12 October – 9 December – Data to understand beam backgrounds, finalise Mechanics & Optical design and understanding of DAQ & Electronics for 2014 NA62 CEDAR Meeting 3May20122

3 Support cylinder bolted to CEDAR Cooling block Support Cylinder bolted to CEDAR flange Quartz lens 90 o spherical mirror Octant HV connectors ATEX nitrogen enclosure Detector frame Lightguide

Liverpool Design and Fabrication DesignFabrication – Support TubeInstalled on CEDAR Nose – Light guide 1Completed – Remaining 3 lightguides End of May – Detector FrameworkAssembled in Liverpool – Optical support cylinderCompletion end of May – ATEX-2 chamber & supportsCompletion immanent – Lens & mirror mountsOutside company – end of May – Cooling assembly – MayCompletion mid June (in house) – Environmental Case & Frame Materials arrive & cut at RohaSell25 th May -> 2 nd June Panels encased in aluminiumDelivery 15 th June Installation Frame Completion mid June – Lightguide & electronics boxComponents (outside company) – May – Integration of cooling & electronicsJune NA62 CEDAR Meeting 3May20124

5

Development Work Gluing conical inserts Measuring reflectivity Cooling and Chiller NA62 CEDAR Meeting 3May20126

Gluing method Standard aluminium surface preparation – Removing loose particles – Degreasing – Polishing cone or fitting aluminised-mylar insert Mylar mounting - vacuum pen development NA62 CEDAR Meeting 3May2012 7

Gluing of aluminised mylar (update) Procedure Mylar covered (electrostatically) with protective layer of food-wrap, “sandwiched” in layers of 10 Conical inserts cut with the use of a template Degreased Al light guide cones covered with given amount of Araldite (gluing pen) Mylar inserted with a vacuum pen and hold with keeper till the epoxy cures Finished light guide stacked in the cabinet Handling procedure developed with the use of 3-D printer model and final Al material samples

Development Work Gluing conical inserts Measuring reflectivity Cooling and Chiller NA62 CEDAR Meeting 3May20129

Reflectivity measurement Variable – divergence lens system. The divergence angle θ increases as the positive element is moved toward the input by the distance x. G. A. Massey, Beam Diverging Lens System for High Power Laser Transmitters, Applied Optics, Vol. 11, Issue 12, pp. 2981_1-2981_1 (1972) NA62 CEDAR Meeting 3May2012 (small-angles) 10

Laser beam profile Laser beam profile: light intensity incident on the 18 [mm] cone composed of ~60% direct light within central 8[mm] diameter and in ~40% reflecting from the surface of aluminised mylar. In contradiction to a simple geometrical expectation of direct light. distance [mm] Photo current [μA] Beam profile will be re-measured using CCD camera + adequate software

Measurement of reflectivity. Reflectivity measurement of the aluminized mylar inserts compared with polished Al cones. Large variation in handling quality tested. For a “reasonable” finish ~92% reflected light observed Preliminary due to small size of Al sample. with polished Al ~15% lower reflectivity measured

Development Work Gluing conical inserts Measuring reflectivity Cooling and Chiller NA62 CEDAR Meeting 3May201213

Draft Chiller Requirements (March 2011) T rise0.5deg C0.25deg C0.10 deg C Bore4mm6mm8mm4mm6mm8mm4mm6mm8mm Flow Pressure Tabulate Flow and pressure for different bores of the internal pipe work and desired temperature rise Chiller Specifications (preliminary web-trawl) ModelPowerFlow 0 bar)Pressure (bar) Fryka DLK  C Grant RC350G 20  C lpm) Neslab Thermoflex 900/P2 40  C 12.5 bar)7 bar Jubalo FC600S 20  C Cole-parmer WU  C Lauda WK 20  C10 14NA62 CEDAR Meeting 3May2012

Thermo-Scientific (NESLAB) The Chiller is ordered: delivery end May – ThermoFlex (5 models: 0.75kW to 4.4kW) 5C to 40C P2 pump gives 4.1b Eg. ThermoFlex 1400 (1170W) = £3,773 + VAT (28 days) Internal detector pipe work is 6 mm (ID) stainless steel 15NA62 CEDAR Meeting 26March2012

Useful Facilities Auto-restart – Chiller can be configure to re-start if mains power is interrupted. I/O – Merlin: 12/24V remote start/stop + external RTD – ThermoFlex: 15-pin I/O connector Relays for: low level, pump on/off, low flow + 2 configurable Remote start/stop 10mV/deg C analogue output of temperature 10mV/deg C remote set point (eg 200mV=20deg C) 16NA62 CEDAR Meeting 3May2012

Assembly & Testing NA62 CEDAR Meeting 3May201217

Assembly Frame with Support Tube NA62 CEDAR Meeting 3May

NA62 CEDAR Meeting 3May201219

Assembly Procedure The detector will be assembled and tested in Liverpool: – LH half is fully instrumented with optics, cooling and electronics – Cabling within octants and from octants to patch panel – Functional test of electronics – RH half has cooling plates and pipe-work – Thermocouples and photodiodes to measure environment The assembly frame is mounted and installation tested The environmental case is fitted and environmental measurements made (light and temperature) Ship to CERN and install each half of detector, then environmental case and external cabling to patch panels. NA62 CEDAR Meeting 3May201220

NA62 CEDAR Meeting 3May Support cylinder bolted to CEDAR Cooling block Support Cylinder bolted to CEDAR flange Quartz lens 90 o spherical mirror Octant HV connectors ATEX nitrogen enclosure Detector frame Lightguide

NA62 CEDAR Meeting 3May Frame doubles as: Installation frame for detector Support frame for panels comprising Environmental Case

NA62 CEDAR Meeting 3May Environmental Cover Light- and gas-tight Thermally insulated Faraday cage Fire resistant Patch panels Nino HV

Liverpool Assembly Schedule Assembly Frame with Support CylinderComplete Detector Support FrameComplete ATEX enclosure and Mirror mountsEnd May Lightguides and PMT housingsEarly June Electronics & Octant wiringMid June Cooling panels, chiller & PT100’sMid June Detector cabling and patch panelsEnd June Mechanical installation testEnd June Environmental EnclosureEarly July External cabling to EE patch panelEarly July Temporary LED system and System testMid July Pack and ship to CERNEnd July NA62 CEDAR Meeting 3May201224

UK Goals for Technical Run K+ Identification: measurement of efficiency for K and π – Measure normalisation: Actual light/MC light – Measure shape & distribution of light spot – compare with MC Thermal Environment – Measure temperature and temperature gradient – Establish operating parameters for Chiller Assess effectiveness of Monitoring & LED systems Electronics – PMT rates, saturation, cross talk, time resolution – Trigger, DAQ, links to central control – CEDAR motor control and display Beam measurement programme NA62 CEDAR Meeting 3May201225