HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

Slides:



Advertisements
Similar presentations
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Advertisements

Walls crates cables gas chambers electronics CERN adb.
Compressor status AWAKE Technical Board meeting 19 May 2015.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
The FP7 How to submit a project electronically AN INFORMATION POINT FOR FP7 IN PALESTINE: Training Seminar of experts Nicosia, Cyprus November.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Laser Beam Transport and Integration. AWAKE Collaboration meeting. Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev CERN
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
HRMT "RodTarg“ Technical Board – Feb. 2 nd 2015 Claudio Torregrosa Martin, Marco Calviani, Antonio Perillo-Marcone, Mark Butcher (EN/STI), Luca.
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
V. Bobillier1 Cable installation status.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
Introduction CAD Data Exchange CERN 11 th CATIA FORUM 7 th June 2012 B.Riffaud.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Adrian Fabich HiRadMat Technical Board CERN, 15th Sep 2016
Mike Anerella December 17, 2013
HiRadmat requests A. Fabich MSWG, 30. January 2015.
Cabling for LHCb Upgrade
IT-4189 Supply and installation of a cryogenic distribution system
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Update of MVD services and requests
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
RD51-WG X June test beam experience: useful information for October
M. Alcaide Leon, Paolo Fessia
M. Alcaide Leon, Paolo Fessia
Status of the PANDA Magnet
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
CNRAD dosimetry and Summary of the TS
TTC System Status May 2007 System overview Production Status
Overview Some useful presentations: Public overview – coffee meeting
Radiation-safe area for electronics, or laser or
Presentation transcript:

HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement

HiRadMat beam … GlassyC is installed Waiting for beam … Some pulses on 15. May Now waiting for improvements of SPS extraction 29/5/2015A. Fabich2

Feed-throughs Between TNC and TT61 Used already by GlassyC/dBM Inserts - viewing windows arrived at CERN to be installed early June 29/5/2015A. Fabich3 EDMS SPSLHRM_0060

TT61 setup TT61 will be equipped with – A standard SPS 19” rack (600 mm x 800 mm) – A table 29/5/2015A. Fabich4

Cabling database Document in finalization (EDMS ) Permanent cabling installed – Connecting TNC and TJ7 (patch rack) – Connecting TJ7 and control room Already installed, to be added to DB: – Connecting TNC and TT61 – 5 x NE48 (TT61 connector to be exchanged) – 12 x CK50 29/5/2015A. Fabich5

Cabling overview An experimental TNC table is equipped with: From Control Room – 6 x NE48 5 x can be used in manual mode 1 x on automatic plug-in – 24 x CK50 e.g. for BPM read-out – Several HV cables – manual mode, e g. for BPM supply From TT61 – 5 x NE48 from TT61 5 x on automatic plug-in E.g. for strain gauges – 12 x CK50 E.g. for high frequency signals (from BPM) – Dedicated experimental cables (subject to discussion) via empty cable ducts E.g. fibre optics Max diameter 35 mm (also for connectors) Beyond 35 mm requires dedicated study using 3 rd feed-through with inner diameter 100 mm 29/5/2015A. Fabich6

Cable proposal forHRMT22 – Ptarg 5 x NE48 from Control Room – 2 x in auto-plug-in mode for horizontal stage Merge to one NE48? – 2 x in manual mode for vertical stage Merge to one NE48? – 1 x in auto-plug-in for LEDs 2 x NE48 from TT61 – auto-plug-in for vacuum gauges/controls 4 x CK50 from TT61 – For BPM No fibres foreseen This is a preliminary list to be completed by the system responsibles. 29/5/2015A. Fabich7

Cable proposal for HRMT24 – BeGrid 4 x NE48 from Control Room – 2 x in manual mode for vertical stage – 1 x in auto-plug-in for LEDs – 2 x in manual mode for For BPKG/BTV CK50 from Control Room – For BPKG/BTV 5 x NE48 from TT61 – In auto-plug-in for strain gauges Fibres required? Such a list should be -Prepared by each experiment -Re-iterated with HRM coordination 29/5/2015A. Fabich8

Cable proposal for HRMT 27 - RodTarg NE48 ? : 1 x Thermocouple cable 24 pairs, Type K 1 x Thermocouple cable 8 pairs, Type N 1 x NE8 copper cable Special cables – to be discussed: -Should be reduced to a minimum -Space in feed-throughs is limited -Optimizing installation effort 2 x Radiation hard camera cables 3 x Optic fibres respecting the standard G x LumaSense Pyrometer Optic fibre: er/Series_740/IGA740_IGA740_LO_Datasheet.pdf er/Series_740/IGA740_IGA740_LO_Datasheet.pdf 2 x PANDA PM Optic Fibers 29/5/2015A. Fabich9

Schedule 29/5/2015A. Fabich10 Consider 1-2 additional weeks of back-up for beam slot

Subsistence for travel/accommodation EuCARD-2 “Transnational Access” 29/5/2015A. Fabich11 Do not hesitate sending requests to More info:

Safety file See recommendations by Technical Board – Submit response to IN ADVANCE TO BEAM TIME! 29/5/2015A. Fabich12