GDE Main Linac and RTML Beam Dynamics Conveners: Nikolay Solyak, Cris Adolphsen, Kyioshi Kubo April 20, Room 303, 14:30 – 18:00.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
ILC Accelerator School Kyungpook National University
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
Update on ILC ML Lattice Design Alexander Valishev, for the FNAL LET group FNAL AP Dept. Meeting March 7, 2007.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ML / RTML WG Summary N.Solyak, K.Kubo, A.Latina AWLC 2014 – Fermilab – May 16, 2014.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
N.Solyak, RTML IntroductionILC LET workshop, CERN, June 23-25, ILC RTML Introduction Nikolay Solyak Fermilab RTML function and RDR design Minimum.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Chris Adolphsen Main Linac Integration. CAVITY VESSEL T4CM QUAD/Correctors T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
Status of Reference Network Simulations John Dale TILC09 20 April 2009.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
Beam Dynamics WG Summary N.Solyak, K.Kubo, A.Latina LCWS 2014 – Oct 6-10, 2014 – Belgrade, Serbia.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
1 ILC RTML overview Nikolay Solyak Fermilab RTML Lattice update in TDR Emittance preservation overview Other effects Conclusion ECFA Linear Collider Workshop.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
N.Solyak, RTMLILC AD&I meeting, DESY, May 28-29, Single-stage Bunch Compressor Nikolay Solyak Fermilab.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
Isabell-A. Melzer-Pellmann LET Beam Dynamics Workshop, Lumi scans with wakefields in Merlin Lumi scans with wakefields in Merlin Isabell-A.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Emittance preservation in the RTML of ILC and CLIC Andrea Latina (CERN) Nikolay Solyak (FNAL) LCWS University of Texas at Arlington - Oct
ML (BC) Studies update Nikolay Solyak Arun Saini.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Wakefield effect in ATF2 Kiyoshi Kubo
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
N.Solyak, RTMLLCWS'11, Sept.26-30, Granada 1 Nikolay Solyak, Valery Kapin FERMILAB * CERN RTML upgrade New design of ILC RTML in central integration region.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
ILC Main Linac Beam Dynamics Review K. Kubo.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
From Beam Dynamics K. Kubo
Re-design of extraction line for single stage BC
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
ILC DR Lower Horizontal Emittance, preliminary study
Coupler RF kick simulations.
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
ILC Z-pole Calibration Runs Main Linac performance
SC Quadrupole Magnets in ILC Cryomodules
Summary of Beam Dynamics Working Group
DFS Simulations on ILC bunch compressor
Status and Plan of GDE Design Work (Including Road Map for RDR)
Coupler kick and wake simulations upgrade
AAP Review, Tsukuba April.17-21, 2009
Electron Source Configuration
Pulsed Ion Linac for EIC
ILC 3.2 km DR design based on FODO lattice (DMC3)
ILC 3.2 km DR design based on FODO lattice (DMC3)
ILC - Global Design Effort
Presentation transcript:

GDE Main Linac and RTML Beam Dynamics Conveners: Nikolay Solyak, Cris Adolphsen, Kyioshi Kubo April 20, Room 303, 14:30 – 18:00

Program 14:30 ILC Low energy quad --Vladimir Kashikhin (FNAL) 14:50 General quad issues -- Chris Adolphsen (SLAC) 15:10 Alignment studies -- John Dale (University of Oxford / JAI) 15:30 Overview of RTML emittance control -- Nikolay Solyak (FNAL) Coffee break 16:10 Single stage BC design – Nikolay Solyak, Andrea Latina (FNAL) 16:30 Design of extraction line for single stage BC – Sergei Seletskyi (BNL) 17:00 BC simulations, recent progress at KEK - Kiyoshi Kubo (KEK), Dou WANG (IHEP) 17:20 BC alignment requirements and alignment issues – Andrea Latina (FNAL) 17:40 Discussion on beam dynamics studies in RTML and ML

Splittable ML Quadrupole 2 Phase He Supply Pipe Task from ILC Project Management: Look at the Splittable Quadrupole conceptual design to provide the quadrupole package installation and replacement outside of a very clean room. Quadrupole Package BPM Cooling Leads V.Kashikhin

Quadrupole Final Assembly View QuadrupoleCooling LeadsBPMCurrent Leads

Summary The first look at the splittable quadrupole showed this approach visibility; Proposed the quadrupole concept with vertical split; Quadrupole has a conduction cooling from LHe supply pipe; Quadrupole mounted around beam pipe outside of the clean room; BPM has tight connection with quadrupole; Quadrupole bolted to the strong 300 mm diameter He gas return pipe; Special attention paid on the magnet assembly and mounting tolerances; Current leads also conductively cooled; Magnet cooling down time ~ 38 Hours; The Quadrupole model with split should be built and tested to verify the design.

The persistent current effect of the dipole wires is very important at low currents.

Reference Network (Survey/Alignment) Simulations by John Dale (Oxford) Commercial survey adjustment software –Expensive, Need to be survey expert to use –Usually only use laser tracker/tachometers Full simulation of a specific device –Slow to generate networks –Restricted to one measurement technique  Simplified Model If designed correctly can be quick Can be used to model novel devices The model is under development. Examples of misalignment from the model with tracking are reported –One example is in next slide –The model should be improved. –It seems: Laser tracker network is not suitable for the ILC

DMS Simulations for Laser trackers 100 networks generated with PRMs using PANDA and the model 10 DMS simulations performed on each network using Merlin ModelPANDA Mean : 110nm 90% : 270nm ≤ 30nm : 18% Mean : 46nm 90% : 104nm ≤ 30nm : 42% Error Curve Comparison of the simplified model with a commercial code “PANDA” for Laser Tracker Network

Simulations of Coupler Kick and Wakes W x (s)-solid,,W y (s)-dashed for σ z = 300 μm. On-axis kick factor vs. σ z bunch shape The couplers break the RF field symmetry and cause transverse RF kick and Wakes DESY,2007. Simulations: DESY/FNAL/SLAC The profiles of the 3 couplers, as seen from the downstream end. Upstream HOM coupler Downstream HOM coupler Main coupler RF cavity ~20% Total RF KICK FNAL Q=3.5  10 6 HFSS DESY Q=2.5  10 6 MAFIA SLAC Q=3.5  10 6 OMEGA3P 10 6 · (V x /V z ) i i i* 10 6 · (V y /V z ) i i i Coupler Transverse Wakefield

Very noisy place – Cryogenic, Vacuum, two klystrons, Tevatron shaft, etc. Total integrated field ~9 nT (f >1Hz) Only 60/180/300 Hz peaks are removed 15, 30 and 45 Hz (Linac & Booster) ~ 5nT Other harmonics 120/180 /240Hz)~ 2nT All the rest ~ 2 nT Stray magnetic fields measurements at A0: Spectrogram and Integrated spectrum 5MW Klystron Modulator Transformer Cryogenic Pumps Power Supplies Etc…

Single-Stage Bunch Compressor Based on the original design, proposed by PT et al. in April 2005: - six cryomodules for RF acceleration (Eacc=26MV/m, phase=-119) - 6-cells wiggler: a single bend magnet between quads in a 6-cells FODO lattice + NEW sections added: (1)beam diagnostics adapted from BC2, re-design extraction after BC  shorter (2)Post-acceleration linac from 5 to 15 GeV – part of ML (Eacc=31.5 MV/m) A.Latina

Single-stage Bunch Compressor - Bunch length = 300 um - energy spread = 3.54 % - energy 15 GeV = 1.07 % (as 2-stage) After optimization: Need modifications: CM type4, modified wiggler design, shorter EL on beamline (shorter system with better performances)

Extraction Line after BC1S: Collimation summary No collimationNo collimation SC magnets 1 collimator (weak collimation) 2 collimators (strong collimation) Collimators 1.9kW/train; 7.4mm horiz. aperture 2.2kW &11.7 kW per train 7.2mm & 50mm H- aperture Sextupoles 1T pole tip field; exotic shape Two sextupoles 12cm aperture and pole tip filed <6T 1T pole tip field Dump window 12.5cm diameter60cm diameter 20cm diameter Final doublet 5cm aperture; 1T pole tip field; 12cm aperture; Pole tip field<2.4T 5cm aperture; 1T pole tip field 5cm aperture; 1T pole tip field Designs for 3 Extraction Lines done. Re-design EL after BC1S  first look Example: Option with Strong collimation Two collimators to protect the doublet and use dump with small window (details: S.Seletskyi talk)

Simulation Studies on ILC Bunch Compressor with SLEPT Dou WANG and Kiyoshi KUBO 1. Coupler wake has been newly introduced to SLEPT. Final vertical emittance growth in RDR BC RF section including coupler RF kick and wakes is : BC1: 0.21 nm BC2: 4.41 nm 2. DFS changing RF phase was introduced in SLEPT. 3. This DFS is not very effective to cavity tilt. (Should be checked.) 4. With all other errors except for cavity tilt, the final emittance growth can be controlled to 0.5 nm. But the final emittance growth will be 6 nm including 200 urad cavity tilt. 5. SLEPT is being improved to include Z-position change for BC. Summary

A.Latina in BC