Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.

Slides:



Advertisements
Similar presentations
Chapter 2 The Analyst as a Project Manager
Advertisements

NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Large Facility Projects (LFP) – Guidelines & Procedures Manual Jack Lightbody Interim LFP Deputy, BFA October 10, 2002 Status Report to the NSB.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Development plan and quality plan for your Project
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
LCGT from the Viewpoint of System Engineering I. Nakatani f2f Mtg June 15, 2010 Institute for Cosmic Ray Research, Univ. of Tokyo Aichi University of Technology.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Industrial Engineering Roles In Industry
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Project Management Requirements
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Safety Auditors Conference 2005 A Practical Approach…….
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
LIGO-G M Management and Operation Plans/Budget Stan Whitcomb NSF Annual Review 8 November 2004 Caltech.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
1 Team Based Program Design Management and Research Operations Involvement in Nanoscale Materials ES&H.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Fire Rescue Regional Training Academy April 22, 2014 Board of County Commissioners April 22, 2014 Board of County Commissioners.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
Template for DUSEL Meeting with Potential Experiments.
Conventional Facilities for the Far Detector Options Assumptions and Cost Estimates T. Lundin April 25, 2012 LBNE Reconfiguration Workshop - 25, 26 - April-2012.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Camera PDR/CD1 Planning 19 September 2008
SCT Project Management Issues
Role of The Software Development Plan (SDP)
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
Controlling Project Cost and Schedule
PLANNING ENGINEERING AND PROJECT MANAGEMENT
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Conventional Facilities (WBS 1
Preliminary Project Execution Plan
Conventional Facilities
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007

Homestake DUSEL Project Development Planning: Presentation Topics DUSEL Campus Development Plan Institutional Responsibilities and Sub-project Teams Basis of Estimates for the Conceptual Design Systems Engineering Toolkit Estimated Cost Summary and Scope Options Project and Operations Organizational Structures Staffing Plans

Homestake DUSEL DUSEL Campus Development Summary Conceptual plan to develop four primary campus locations for research: 1.Surface campus at Yates Complex 1.Near-surface campus at 300 Level 1.Mid-level campus at 4850 Level 1.Deep-level campus at 7400 Level Infrastructure will be maintained for access to additional, selected levels for bio- and geo- sciences and for unique experiments that require specific or isolated sites. Homestake Deep Underground Science and Engineering Laboratory

Homestake DUSEL Phased Development Plan Construction during 2008 to 2010 will provide space for early experiments, followed by ~5 ½ years of phased construction for DUSEL with project completion in 2015.

Homestake DUSEL Institutional Responsibilities and Sub-project Teams

Homestake DUSEL Basis of Estimates for the Conceptual Design Re-entry and Rehabilitation for Mining-to-Labs Conversion DYNATEC Feasibility Study (Syd De Vries, mining engineer) Lab Module Excavation Estimated Costs, Schedule, and Feasibility Mark Laurenti (consultant, former Homestake mining engineer) Golder Associates (mining engineering consultants) Surface and U/G Laboratory Infrastructure: Parametric estimates LBNL Engineering and Facilities staff Project Management, Staffing, Engineering and Design, Commissioning LBNL project experience, parametric and level-of-effort estimates Facility Staffing, Operating Costs, and Risk Assessment: Homestake and SDSTA experience and derived estimates Golder Associates (mining engineering consultants) DUSEL Research Instrumentation and Experimental Equipment Science collaboration budgetary estimates, Scope-dependent (TBD) Annual Escalation: 3% per year; Preliminary Contingency Analysis: Range 15% to 30%

Homestake DUSEL

Proposed DUSEL Annual Operating Budget Distribution in FY15 among four directorates 7% 6% 44% 66% 5% 21% 10% Estimated 12% of the DUSEL Operating Budget is allocated for Facility Costs due to the absence of shared resources with production mining. This is a relatively small premium for the advantages of a dedicated site for DUSEL. Proposed Annual Budget: ~$25M (FY07$) ~$2.5M - $3M (FY07$)

Homestake DUSEL

Scope Options for Construction

Homestake DUSEL Systems Engineering Toolkit Communication Requirements Management Database Continuous Risk Management Work Breakdown Structure, Subsystem Interface Management Integrated Safety Management Design-Reviews, Integration, and Performance Management Value Management Configuration Management and Change Control Project Controls: Earned Value Management System Objective: Implement a unified approach to Systems Engineering and Project Management

Homestake DUSEL DUSEL Operations FY10 to FY15 Proposed management organizational structure

Homestake DUSEL DUSEL MREFC Project FY10 to FY15 Proposed management organizational structure

Homestake DUSEL

DUSEL Staffing Plans Summary: FY10 to FY15

Homestake DUSEL Supplementary Slides: Estimated Cost Profiles Proposed Construction Schedule Risk Management Methodology

Homestake DUSEL

Methodology for Risk Management Continuous Risk Management process will be integral with Safety Management, Project Management, Systems Engineering, and Operations Initial steps have included Risk Identification and Preliminary Risk Analysis, with details presented in CDR and Appendices Risk planning has involved consultants and staff having a broad background and perspectives: Consultants:Syd De Vries (Risk Identification, Basis of Estimates) Mark Laurenti (Basis of Estimates, cost and schedule) Mark Nelson, S.D. DENR (Environmental issues) Golder Associates (Failure Modes and Effects Analysis) Staff and Collaborators:SDSTA Staff, notably Tom Regan (Site Conditions, Safety), Greg King, John Marks, Gary Lillehaug (former HMC engineers) Homestake Science Collaboration members LBNL Management (internal review) LBNL Project Team

Homestake DUSEL Risk Categories for Homestake DUSEL High Priority and High Visibility Risk Items: –Personnel Injury –Water Quality, Environmental Permitting –Infrastructure Deterioration and Rehabilitation –Underground Fire Hazards –Underground Rock Failure, Rock Competency –Ponded or Stored Water Release –Availability of Subcontractors and Equipment –Cost and Schedule Controls, Funding Profiles 1. Safety3. Performance and Operations 2. Environmental4. Project Management

Homestake DUSEL