Type of Project ShahRukh Haider. Main Type  Major Types of Projects Based on Product of Project  Here is a list of nine different types of projects.

Slides:



Advertisements
Similar presentations
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Advertisements

1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Chapter 2.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Unit Five – Transforming Organizations
Computers: Tools for an Information Age
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Chapter 3: The Project Management Process Groups
Introduction to Systems Analysis and Design
Managing Projects
Project phases and the life cycle
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
CORPORATE PROFILE
Release & Deployment ITIL Version 3
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Computer System Analysis
Profile and a quick introduction Software Engineering: ) هندسة البرمجيات (in Arabic: is the branch of computer science Designed to develop a set rules.
Information Systems Security Computer System Life Cycle Security.
Software Project Management Introduction to Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Software Development © 2014 wheresjenny.com Software Development.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Management & Development of Complex Projects Course Code - 706
Construction Contracts and Project Delivery Methods
1 Bonham, chapter 8 Knowledge Management. 2  8.1 Success Levels  8.2 Externally Focused KM  8.3 Internally Focused KM  8.4 PMO-Supported KM
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Configuration Management (CM)
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Software Project Management
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
Martin Cryer Software Development. ‹#› Development Processes Traditional e.g. Waterfall Method Agile –Design Build (Quick to Market) –Combines Engineering,
SOFTWARE SYSTEMS DEVELOPMENT 4: System Design. Simplified view on software product development process 2 Product Planning System Design Project Planning.
Copyright 2002 Prentice-Hall, Inc. 1.1 Modern Systems Analysis and Design Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 1 The Systems Development.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Development Processes Chapter Study Questions Q1: How are business processes, IS, and applications developed? Q2: How do organizations use business.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
For More Tutorials ACC 210 WEEK 1 DQ 1  How does information flow between departments at your organizations? Why do some organizations.
Systems Analysis & Design 7 th Edition Chapter 2.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Interset Support Overview March 2017
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Chapter 3 Managing the Information Systems Project
IEEE Std 1074: Standard for Software Lifecycle
Introduction DEFINATION :-
Chapter 2 Managing the Information Systems Project
To Brihaspathi. Software Development Services
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

Type of Project ShahRukh Haider

Main Type  Major Types of Projects Based on Product of Project  Here is a list of nine different types of projects based on the product they produce. The profession should think of other products of projects not listed here and come up with an agreed list. Type of Project Product of Project (Examples) 1.Administrativeinstalling a new accounting system 2.Constructiona building or road 3.Computer Software Developmenta new computer program 4.Design of Plansarchitectural or engineering plans 5.IT or System Installationa telephone system or IT system 6.Event or RelocationOlympiads or a move into a new building 7.Maintenance of Process Industriespetro-chemical plant or electric generating station 8.New Product Developmenta new drug or aerospace/defense product 9.Researcha feasibility study or investigating a chemical 10.Other

1.Administrative Project Software: Microsoft Project Characteristics of administrative tasks The following is a list of the characteristics of administrative tasks in an administrative project:  The task is a Fixed Duration task type.  The task does not have any actual work time assigned.  The task does not have any remaining work time assigned.  The task tracks the hours of work that are completed per day.  Tasks that the project manager performs in an administrative project.

2.Construction Project  Construction industry is composed of five sectors: residential, commercial, heavy civil, industrial, and environmental. Construction industry is composed of five sectors: residential, commercial, heavy civil, industrial, and environmental.  A construction manager holds the same responsibilities and completes the same processes in each sector. All that separates a construction manager in one sector from one in another is the knowledge of the construction site. This may include different types of equipment, materials, subcontractors, and possibly locations. A construction manager holds the same responsibilities and completes the same processes in each sector. All that separates a construction manager in one sector from one in another is the knowledge of the construction site. This may include different types of equipment, materials, subcontractors, and possibly locations.

3.Software Development Project  computer programming, documenting, testing, and bug fixing involved in creating and maintaining applications and frameworks involved in a software release life cycle and resulting in a software product. The term refers to a process of writing and maintaining the source code, but in a broader sense of the term it includes all that is involved between the conception of the desired software through to the final manifestation of the software, ideally in a planned and structured process. ‪ ‬ Therefore, software development may include research, new development, prototyping, modification, reuse, re- engineering, maintenance, or any other activities that result in software products. computer programming, documenting, testing, and bug fixing involved in creating and maintaining applications and frameworks involved in a software release life cycle and resulting in a software product. The term refers to a process of writing and maintaining the source code, but in a broader sense of the term it includes all that is involved between the conception of the desired software through to the final manifestation of the software, ideally in a planned and structured process. ‪ ‬ Therefore, software development may include research, new development, prototyping, modification, reuse, re- engineering, maintenance, or any other activities that result in software products.

4.Design Project (Archieture)  Project in which the design and construction services are contracted by a single entity known as the design–builder ””  It relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project. "DB with its single point responsibility carries the clearest contractual remedies for the clients because the DB contractor will be responsible for all of the work on the project, regardless of the nature of the fault" It relies on a single point of responsibility contract and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project. "DB with its single point responsibility carries the clearest contractual remedies for the clients because the DB contractor will be responsible for all of the work on the project, regardless of the nature of the fault"

5.IT Project  Project in which the process of planning, organizing and delineating responsibility for the completion of an organizations' specific information technology (IT) goals. Project in which the process of planning, organizing and delineating responsibility for the completion of an organizations' specific information technology (IT) goals.  project management includes overseeing projects for software development, hardware installations, network upgrades, cloud computing and virtualization rollouts, business analytics and data management projects and implementing IT services. software development, hardware installations, network upgrades, cloud computing and virtualization rollouts, business analytics and data management projects and implementing IT services.  In addition to the normal problems that can cause a project to fail, factors that can negatively affect the success of an IT project include advances in technology during the project's execution, infrastructure changes that impact security and data management and unknown dependent relationships among hardware, software, network infrastructure and data. IT projects may also succumb to the first-time, first-use penalty which represents the total risk an organization assumes when implementing a new technology for the first time. Because the technology hasn’t been implemented or used before in the organization, there are likely to be complications that will affect the project’s likelihood of success.total risk an organization assumes when implementing a new technology for the first time. Because the technology hasn’t been implemented or used before in the organization, there are likely to be complications that will affect the project’s likelihood of success.

6.Relocation Project  Engaging a project management to handle your organization’s relocation can reduce administrative burden tremendously. CPM One Source’s relocation and installation teams have been trained not only in the art of moving and installing, but also customer service. Project Managers will be assigned to manage each project from start to finish, ensuring ease and project success.

7.Process Industrial Project  the primary production processes are either continuous, or occur on a batch of materials that is indistinguishable. For example,KE, FMCG such as food processing company making sauce may make the sauce in a continuous, uninterrupted flow from receipt of ingredients through packaging.

8.New product development Project  There is complete process of bringing a newproduct to market. New product development is described in the literature as the transformation of a market opportunity into a product available for sale ‪ [1] ‬ and it can be tangible (that is, something physical you can touch) or intangible (like a service, experience, or belief). A good understanding of customer needs and wants, the competitive environment and the nature of the market represent the top required factors for the success of a new product. ‪ [2] ‬ Cost, time and quality are the main variables that drive the customer needs. Aimed at these three variables, companies develop continuous practices and strategies to better satisfy the customer requirements and increase their market share by a regular development of new products.product to market. New product development is described in the literature as the transformation of a market opportunity into a product available for sale ‪ [1] ‬ and it can be tangible (that is, something physical you can touch) or intangible (like a service, experience, or belief). A good understanding of customer needs and wants, the competitive environment and the nature of the market represent the top required factors for the success of a new product. ‪ [2] ‬ Cost, time and quality are the main variables that drive the customer needs. Aimed at these three variables, companies develop continuous practices and strategies to better satisfy the customer requirements and increase their market share by a regular development of new products.