NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March 30 2011 Insulation Short Beam Tests – Failure Modes Ripple Loads on PF PF4/5.

Slides:



Advertisements
Similar presentations
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Advertisements

NSTX Thomson Scattering and NB Analysis Update: Maxwell Generated EM Loads and ANSYS WB Static Stresses
Outline  Spring Functions & Types  Helical Springs  Compression  Extension  Torsional.
MIT Plasma Science and Fusion Center Fusion Technology & Engineering Division J.H. Schultz, P. Titus, J.V. Minervini M.I.T. Plasma Science and Fusion Center.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
NSTX outer TF leg analysis (with diamonds not uniformly distributed) *Full 360º model *Al blocks connected to springs to simulate umbrella structure (stiffness.
Figure 1 – NSTX Upper Umbrella Assembly Upgrade Design: Version 3.
Lecture #19 Failure & Fracture
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Workshop A12 Fatigue.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Chapter 6 Fatigue Failure Theories
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
PROBLEM mm x y 800 mm P = 1500 N z y 50 mm 100 mm
1 THERMAL & MECHANICAL PRELIMINARY ANALYSIS ELM COIL ALTERNATE DESIGN Interim Review July 26-28, 2010 In-Vessel Coil System Interim Review – July 26-28,
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Proposed TF Joint Design C Neumeyer 2/26/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet been performed.
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
2D STRESS ANALYSIS OF THE TS MAGNET PROTOTYPE Stefania Farinon and Pasquale Fabbricatore.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
NSTX Center Stack Upgrade Workshop Requirements & Design Point C Neumeyer Jan 22, 2009.
KDEMO Structural Analysis P. Titus June ! KDEMO coil axisymmetric analysis pfcb 21 1, 1.52,0.70,.9,1.3,8,10 !CS1 2, 1.52,2.10,.9,1.3,8,10 !CS2.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus February 24, 2010 PF3 Dome Bracket 1/8 inch Weld Stress PF4,5 Stress with 6 Support.
NSTXU-CALC Vessel Port Rework for NB and Thomson Scattering
NSTXU-CALC TF Flex Joint and TF Bundle Stub
Supported by NSTX Centerstack Upgrade Project Meeting P. Titus October Aluminum Block Analyses.
05/04/05 FEM Analysis of PA 44 Engine Mount PIPER SEMINOLE –PA-44 TWIN ENGINE AIRCRAFT.
Supported by NSTX Centerstack Upgrade Project Meeting P. Titus October Rib and Tab Weld Fracture Mechanics.
Figure 1 – NSTX Upper Umbrella Assembly Upgrade Design: Version 3.
Failure Criteria and stress concentration
In-Vessel Coil System Conceptual Design Review – September, Vertical Stability Coil Structural Analyses P. Titus, July
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus January 27, 2010 Umbrella Leg Sliding Blocks TF OOP Support to the Vessel Seismic (Static.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus/EA Branch November 17, 2010 Lid/Cover/Flex Aluminum Block Bolting Stress And Stresses.
Results of Linear Stress Analyses for Modular Coils and Coil structure For 2T High Beta Currents at 0 Seconds and Initial Coil Shrinkage of in/in.
Analyses of Bolted Joint for Bolt Preload and Shear Load
Figure 1 – NSTX Upper Umbrella Assembly Upgrade Design: Version 3.
NSTX NSTX Center Stack Upgrade, PF1a/b/c Stress Analysis (draft)25 April NSTX Supported by NSTX Center Stack Upgrade 25 April, 2011 Structural Analysis.
Heat Transfer Simulation for the Welding of the T-Section.
NSTX TF Flag Joint Torque Collar Chit Review C Neumeyer 9/11/3.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus April 14, 2010 PF4/5 Terminal Stress Existing PF4/5 Support Weld Algorythm Moment Influence.
Shear Stresses in Concrete Beams
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus/EA Branch February Global Model Update Status P4 Quench Vessel/Bellows Analysis.
NCSX NCSX Preliminary Design Review1 Conventional Coils and Structure Phil Heitzenroeder, Len Myatt, and Mike Viola for the NCSX Engineering Team.
BoltJoin ppt P. Rogoff 3/24/2011. NSTX Supported by P. R. 3/9/2011 Update Ring Bolted Joint Design and Recommend the Joint Geometry using bolts.
issues 40 min. rep. rate Fabrication of flex sections –Water jet cut copper –Copper flat cable –Others – electroform brazed straps –Shape –OOP support.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
NCSX R&D Activity Update Jim Chrzanowski June 11, 2003.
FEM Analysis of the Stage3 Support Frame H.M. Fan March 14, 2007.
AWB NSTX TF Flag Joint Design Review April 10, 2003 Art Brooks.
A View of NCSX Structural System and Load Path for the Base Support Structure.
Final_Bellows.ppt. The purpose for these analyses was to justify and select the appropriate NSTX Center Stack Update project VV Bellows. The bellows should.
REQUIREMENTS & ASSUMPTIONS C Neumeyer 4/10/3. FIELD AND CURRENT Base GRD requirement: 3kG at R 0 =0.854m with 4.5 sec flat top, once every 300s
Analysis of TF Load Paths and Vacuum Vessel Loading H. M. Fan Jan. 22, 2009.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March F.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus Feb 3, 2010 Dome Rib Tab Weld Stress Removing TF OOP Support to the Vessel.
A PROPOSED TF JOINT DESIGN FOR THE NSTX CENTERSTACK UPGRADE Robert D Woolley 25 February 2009.
TORSION OF A SHAFT WITH A SHOULDER FILLET
NSTX TF outer leg analysis Because the stress on umbrella structure is too high, there are some ideas to reduce it, like adding a case to enhance the stiffness.
Bolt Pretension with Contact. Nonlinear Structural Analysis Goals Goal: – In this workshop our goal is to investigate the behavior of the pipe clamp assembly.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting
ID: M2PoB-03 [41] Evaluation of the cryogenic mechanical properties of the insulation material for ITER Feeder superconducting joint Zhixiong Wu1, Rongjin.
Structural analysis of the CBM magnet coil
( BDA 3033 ) CHAPTER 6 Theories of Elastic Failures
( BDA 3033 ) CHAPTER 6 Theories of Elastic Failures
Presentation transcript:

NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March Insulation Short Beam Tests – Failure Modes Ripple Loads on PF PF4/5 Existing Support Analysis

Top flag Von Mises Top flag hoop stress 315 MPa (45.7 ksi) 257 MPa (37.3 ksi) 73.7 MPa (10.7 ksi) Han Zhang Current Diffusion/Thermal/Stress Model We Expect De-Lamination

Figure 33 - Bonded tape delaminated from copper turn Figure 34 - Sleeve of bonded glass fiber tape where copper turn slid out TFTR D&D PROJECT FINAL EXAMINATION AND TESTING OF THE TFTR TF-COILS December 18, 2002 Irving J. Zatz

Broke at only 100 lbs Broke at Kapton Bonds Withstood 21kV after air gap tracking fixed.

U.S. ITER Large-Scale Compression-Fatigue Tests of CS Coil Insulation 27 June 2008

Stresses Due to OH2 Reverse Current Fault, Alcator C-Mod Belleville Preload is Applied as Nodal Forces on the Top of the model Analysis Predicted De-Bonding but Not Failure Inspection Showed Crazing Here No Operational Problems have been Experienced

Conclusion: Some De-Lamination is Expected Parting Planes must be predictable and not Cause Tearing of Fiberglass Insulator OH Kapton Interleaved Insulation Will Part Reliably – Like Old ITER Design Recent Measured Results for the CTD 425 System Show Preferential Failures at Copper Bond Surface, But Sufficient Shear Strength to Support TF Torsional Loads

With Plasma No Plasma Without Existing Support Strut

With Existing Support Strut 180 Mpa or 26ksi is Marginal for Static Weld Allowable Present 96 Scenarios produce ~22 ksi (next Slide) Won’t Pass Fatigue.

Results from Influence Coefficient Multiplication for Sx in RSYS 5 (cylindrical). With No Column This Stress Can be Considered from PF5 Loads Only +13kA/- 24 kA Scenario from Latest ( as of March 2011) Design Point Spreadsheet

Present Column Doesn’t Do Much and Doesn’t Compare Well with the Added 3.5 inch Column Could we Replace it?

TF Ripple Loads – Figure Created by Subtracting the PF+TF Load File from the PF Only File, Then Plotting Only PF Loads

TF Ripple Loads on PF 4 and 5 Upper Plotted with TF leg Segments to Show Torque Loading Near the TF Legs TF Ripple Loads on PF Coils are Included in Willard’s, Han’s, Andrei’s and Titus’ Loads – But not Influence Coefficient Calculations.