“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005.

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Developments Transmission Workgroup 3rd November 2011.
Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
A regulatory framework for gas quality treatment facilities: recap and update.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Lessons from developments in the past ten years – GB experience Alison Kay – National Grid, Transmission Commercial Director.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Bacton blending feasibility study Gas Quality Workshop 23 April 2007 Dr Nick Bates, National Grid Gas Transmission.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
The calculation of the NTS Optional Commodity tariff (NTS Shorthaul) in the Enduring Exit Period Richard Hounslea/Debra Hawkin National Grid NTS, Gas Charging.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Transmission Workstream 6 January 2011
Entry Capacity Overrun price calculation
Transmission Workgroup – 1st December 2011
European Transparency Requirements
Amendment to NEA & NExA Measurement Provisions Change Process
Exit Capacity Substitution and Revision
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Joint Office Presentation for Modification 0678
QSEC auction timetable
MOD Deemed applications – User pays initial thoughts.
Draft Mod: Update of default System Marginal Prices
Transmission Workstream 1st September 2005
Assured Pressures Proposal
Entry Overrun Calculation
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Transmission Workstream 6th November 2008
Information Provision for Transitional Exit Capacity
Stefan Leedham Transmission Workstream 2nd November 2006
Presentation transcript:

“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005

Proposal - Summary  Interconnector UK has requested increases in its contractual limits in respect of:  upper Wobbe Number  Total Sulphur  The requested parameters remain compliant with the Gas Safety (Management) Regulations  The requested Sulphur specification is compatible with the first phase of EASEE-gas harmonisation proposed to be in place from 1 st October 2006

Specification of the new gases  The proposed changes to the NEPs at the European Interconnector sub-terminal at Bacton would: -  Allow more diverse sources of imported gas to be brought into the UK;  Secure greater flexibility in the operation of the European Interconnector;  The proposed limits would be implemented through amendment of the Network Entry Provisions

The proposed specification changes ParameterCurrent Specification Proposed Specification GS(M)R Specification Total Sulphur15 ppm (molar) 30.0 mg/m³ (Normal) 50 mg/m³ (Standard)) approx mg/m³ (Standard) approx mg/m³ (Standard) Wobbe No. upper limit: 54.0 MJ/m³ (Normal) [ ] MJ/m³ (Normal) MJ/m³ (Standard) 51.1 MJ/m³ (Standard) MJ/m³ (Standard)

Advantages of the Proposal  The Proposal, if implemented, could:  Allow access to greater volumes of European sourced gas that could be imported into the UK via the European Interconnector;  Better facilitate the achievement of securing effective competition between the relevant shippers and relevant suppliers  Enhance security of supply

Disadvantages of the Proposal  The Proposal, if implemented, could lead to:  CV shrinkage increases  However, National Grid NTS believes that any increases would be minimal  Increases in Sulphur content in the gas on the occasions when the European Interconnector is operating in import mode.  However, National Grid NTS believes that any increases would not exceed 4 mg/m³ (Standard)  Furthermore, any increases in either Wobbe Number or Total Sulphur would decrease as distance from the Bacton terminal increases.

Simplified NTS schematic Bacton Interconnector SEP

Potential increases in Sulphur mg/m 3 (st)

Way Forward  Submit Proposal at December Mod Panel