Super KEKB project WIN03 Oct 9 th, 2003 Nobu Katayama KEK
Octl 9th, 2003Nobu Katayama2 Outline § Belle/KEKB status § Super KEKB plan –Physics –Detector study –Accelerator study
Octl 9th, 2003Nobu Katayama3 KEKB status 1999/10 2003/7/1 > 50 fb 1 in years 2002, 2003 LER~1.55A HER~1.1A With SRF cm -2 s fb -1
Octl 9th, 2003Nobu Katayama4 Best day (May 12 th, 2003) pb -1 /day recorded
Octl 9th, 2003Nobu Katayama5 SVD 1 SVD = 54 ladders = 32 ladders SVD1SVD2 R BP 1.5 cm R BP 2.0cm R L1 3.0cm R L1 2.0cm R out 6.0cm R out 8.8cm
Octl 9th, 2003Nobu Katayama6 SVD 1.6SVD2.0 R BP / R L1 / R out 20/30/60 mm15/20/90 mm Acceptance 23º< <139º17º< <150º # of layer/# of ladders3 / 324 / 54 Max. length (mm) Orthogonal readoutBuilt in double metal layer Flexible printed circuit Isolation of detector bias Integrated capacitor on DSSD Optical isolator in a buffer circuit Fast triggerNoYes Shaping time ~1 s~0.5 s z (90deg.,p=2GeV/c) ~35 m~25 m Measured Signal to Noise ratio ~2025(lyr4)~36(lyr1) Radiation tolerance~2Mrad~20Mrad How much improved?
We have just started! More and more Bs Super KEKB
Octl 9th, 2003Nobu Katayama8 Mission 1: 300 fb 1 Precision test of KM unitarity Search for new physics in B and decays Identify SUSY breaking mechanism Bread’nd butter for B factories See quantum effect in penguin and box loop Very important if New physics = SUSY Mission 2: 3,000 fb 1 Mission 3: 30,000 fb 1 Mission of Super B Factory(ies)
Octl 9th, 2003Nobu Katayama9 In which processes can we find New Physics? § Rare decays –B X s , –B K* § CP violations –B K S and ’K S –B X s , § b c emitting charged Higgs § Forbidden decays by SM § Forbidden/rare decays of
Octl 9th, 2003Nobu Katayama10 CPV in penguin decays Belle (August 2003) A CP ( K S )= 0.96±0.50 A CP ( ’K S )= 0.43±0.27 A CP (J/ K S )= 0.731±0.057 Prove A CP ( K S, ’K S )≠A CP (J/ K S ) In SM, New phase in penguin loop may change this relation KEKB PEP-II Next B factory 5 discovery KSK+K-KS’KSKSK+K-KS’KS A CP
Octl 9th, 2003Nobu Katayama11 Atmospheric Neutrinos Can Make Beauty Strange? § Leptogenesis models inspired by the naïve SO(10) unification exist where the near-maximal mixture of and results in large mixing of RH super-b and super-s, giving O(1) effects on b s transitions such as –Asymmetry in B K s (effect is in first order) –B s mixing –b s (effect is of the order of |C g (NP)| 2 ) § Ref. R. Harnik, D. Larson, H. Murayama and A. Pierce (hep-ph/ ), D. Chang, A. Masiero and H. Murayama (hep-ph/ ) § Many other GUT inspired models are coming up!
Octl 9th, 2003Nobu Katayama12 Dominant Right-Right Mixing case
Octl 9th, 2003Nobu Katayama13 SUSY effect in B K* § § These measurements are excellent probe to search for SUSY § § Inclusive decay, b sll, is much less model dependent. An e + e B factory provides a unique opportunity to measure this by pseudo reconstruction technique A.Ali m( ) 2 distribution F/B asymmetry SM SUSY models with various parameters set
Octl 9th, 2003Nobu Katayama14 Rare decays of
Octl 9th, 2003Nobu Katayama15 Charged Higgs in tree decay B D (*) vs D - Large branching fraction: ~1% - Uncertainty in form factor cancels in the ratio (B g D )/ (B g D ). - polarization is more sensitive to H ±. M.Tanaka
Octl 9th, 2003Nobu Katayama16 Comparison with an LHC experiment (B D )/ (B D ) at B factory with 5,000 fb -1 B factories don’t really do tree diagrams of new particles with the exception of charged Higgs… But together with LHC measurements, we can determine tan !
Octl 9th, 2003Nobu Katayama17 What can we do? Compilation at the 5 th High Luminosity WS
Octl 9th, 2003Nobu Katayama18 KEKB upgrade strategy Present KEKB L= L=10 35 L~10 36 dt =500fb 1 One year shutdown to: replace vacuum chambers double RF power upgrade inj. linac g C-band larger beam current smaller y * long bunch option crab crossing I LER =1.5A 2.6A I LER =9.4A I LER =20A Constraint: 8GeV x 3.5GeV wall plug pwr.<100MW crossing angle<30mrad dt =3000fb 1 before LHC!!
Octl 9th, 2003Nobu Katayama19 Detector upgrade § Higher luminosity collider will lead to: –Higher background § radiation damage and occupancy in the vtx. detector § fake hits in the EM calorimeter § radiation problem in the tracker and KL detector –Higher event rate § higher rate trigger, DAQ and computing § Require special features to the detector –low p identification for s reconstruction eff. –hermeticity for “reconstruction”
Octl 9th, 2003Nobu Katayama20 / K L detection 14/15 lyr. RPC+Fe Tracking + dE/dx small cell + He/C 2 H 5 CsI(Tl) 16X 0 Aerogel Cherenkov counter + TOF counter Si vtx. det. 3 lyr. DSSD SC solenoid1.5T 8GeV e 3.5GeV e Detector upgrade: an example 2 pixel lyrs. + 3 lyr. DSSD tile scintillator pure CsI (endcap) remove inner lyrs. “TOP” + RICH New readout and computing systems
Octl 9th, 2003Nobu Katayama21 SVD occupancy and CDC hit rate § Current most inner layer of SVD’s occupancy is 3~5% § Current most inner layer of CDC’s occupancy is 2~3% § With luminosity, two layers of pixel + silicon (~15cm R) + CDC survives § With luminosity, Pixel + Silicon a la super BaBar design? Radius = 15cm Cathode Inner Main
Octl 9th, 2003Nobu Katayama22 Does CDC work with L>10 35 ? § § Smaller cell § § Faster gas § § Larger starting diameter Yes !!
Octl 9th, 2003Nobu Katayama23 Small Cell Chamber (with SVD2) ~20cm
Octl 9th, 2003Nobu Katayama24 XT curve for small cell measured Small cell Normal cell
Octl 9th, 2003Nobu Katayama25 New PID detector Present Belle: Aerogel Cherenkov counter both for barrel and endcap. TOP counter for barrel & Aerogel RICH for endcap Requirements: - Thin detector with high rate immunity - >3 /K separation up to 4GeV/c - low p / separation
Octl 9th, 2003Nobu Katayama26 Time of propagation (TOP) counter 20mm time & X sensitive PMTs Fused silica(n=1.47) Reflection mirror 200mm A few meters photon hits
Octl 9th, 2003Nobu Katayama27 Aerogel RICH for endcap § Single event display § Hit distribution
Super KEKB Accelerator upgrades
Octl 9th, 2003Nobu Katayama29 What’s impressive about KEKB § KEKB and PEP-II have achieved the highest luminosities in history of particle accelerator/collider § KEK and PEP-II have recorded more than 140 fb 1 of data and continue to accumulate Thanks to tremendous efforts by and ingenuity of the commissioning and operation groups
Octl 9th, 2003Nobu Katayama30 Features of KEKB § Super conducting RF cavities and ARES cavities –Holds more than 1A of beam current with SRF § IR region –3 m 100 m: the smallest beam size among the storage rings –Finite crossing angle § Solenoids for positron ring –Suppress photo-electron clouds § Flexible Optics –Real time monitor and correction system
Octl 9th, 2003Nobu Katayama31 Challenges with Super KEKB § High beam currents (LER 9.4A+HER4.1A) –Heating, breakdown will occur –Ultra high vacuum, beam lifetimes –Power consumption (80~100MW) –Stability of the beam/photo electron clouds –Injection –Noise/Background to detector § Beam-beam effect (tune shift of 0.05 assumed for ) –Beam-beam tune shift; unknown –For a double ring machine, more than 50 parameters must be optimized simultaneously –Hard to maintain the optimum beam conditions due to disturbances § Optics with very small focusing depth (3mm) –KEKB vertical beta is <6mm (world record) –Shorter bunch length:=more peak current gives more power dissipation, shorter lifetime
Octl 9th, 2003Nobu Katayama32 Towards Super KEKB § LER 9.4A + HER 4.1A (4~6 times as now) –Rewind solenoids –Double RF systems –Replace vacuum chambers of the both rungs –Cooling system § More focusing and shorter bunch (half as now) –New IR § Charge switch and better/faster injection –8GeV positron injection with a C-band linac –Damping ring –New positron production target § Crab crossing
Octl 9th, 2003Nobu Katayama33 Accelerator Upgrades for Super KEKB K. Izu 2003 § Crab cavities § More RF sources § More cavities § Super Belle § New IR § New beam pipe & bellows § Damping ring § Positron source § Charge switch by C-band
Octl 9th, 2003Nobu Katayama34 Machine parameters x = 20 cm x = 15 cm
Octl 9th, 2003Nobu Katayama35 Crab cavity developments crossing angle 22 mrad Head-on(crab) ◊ ◊ ◊ ◊ ◊ yy (Strong-weak simulation) (Strong-strong simulation) l Crab crossing may boost the beam-beam parameter up to 0.2! l Superconducting crab cavities are under development, will be installed in KEKB in K. Ohmi K. Hosoyama, et al
Octl 9th, 2003Nobu Katayama36 (Each building for 4 〜 6 RF units.) D8D7 D4 D10 D11 new D1D2 D5 LER-RF (ARES) HER-RF (ARES) HER-RF (SCC) 5 buildings should be added. 50% more RF cavities Double # of Klystrons #RF/#SRF 30/8 44/12 #Kly/ACPW(MW) 23/45 56/73
Octl 9th, 2003Nobu Katayama37 Energy exchange (HER : e + /LER : e ) § Advantages : –Effect of photoelectron cloud can be reduced. ■ Positron energy increases. –Injection time can be reduced. ■ Intensity of injector : e - > e + ■ Beam current : e - > e + § Unknowns : –Multipactering occurs in e + at HER or not ? ■ Height of vacuum chamber is smaller than LER. –Is fast ion instability safe for e - in LER ? ■ Electron energy decreases. § Major upgrade of injector linac is needed. –Energy upgrade : C-band scheme
Octl 9th, 2003Nobu Katayama38 Linac upgrades for 8 GeV e + 2-Bunches for Simultaneous Injection 1-st bunch -> e- Injection 2-nd bunch -> e+ production S-band accl. units are replaced with C-band units. Accl. Field 21 -> 41 MV/m e+ Damping Ring for lower emittance Achieved 40 MW (0.5ms, 50pps), > 40 MV/m (1m structure) Goal: 40 MW 40 MV/m
Octl 9th, 2003Nobu Katayama39 Summary § Belle and KEKB have achieved 1.06×10 34 cm 2 s 1 and 158 fb 1 § We have installed SVD2, two more RF cavities and come back online in 2 wks § We are hoping to upgrade KEKB and Belle to reach luminosity and to accumulate 3000fb 1 before 2010 when LHC starts producing results –Simulation tells us that we may reach 5 with head-on collision with crossing angles using the crab cavities