HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.

Slides:



Advertisements
Similar presentations
Simulations des niveaux de radiations en arrêt machine M. Brugger, D. Forkel-Wirth, S. Roesler (SC/RP)
Advertisements

Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Exemption, Clearance, Discharges
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains S. Bally, O. Beltramello, I. Bergstrom, N. De Bortoli, H.Vincke,
Metal Suspension and Exemption Planning Sayed Rokni, Jim Allan, James Liu, Olga Ligeti, Amanda Sabourov, Joachim Vollaire ES&H Radiation Protection Department.
Activation of equipment - overview Chris Theis, Helmut Vincke - DGS/RP.
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Ralf Trant on behalf of the HSE team Health, safety and environment.
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
Vacuum Interventions in Radioactive Environments J.M. Jimenez AT Department / Vacuum Group.
ActiWiz – optimizing your nuclide inventory at proton accelerators with a computer code Helmut Vincke, Chris Theis DGS/RP 1 RSO committee – 1/3/2012 Remote.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
Dose Measurements S. Roesler (DGS-RP) Collimation WG – IR3 passive absorbers 4 June 2012.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
HTS Tl-based coatings for FCC beam screens - Radiation Protection Aspects - Markus WIDORSKI, DGS-RP Information on ActiWiz: Courtesy of Chris Theis, DGS-RP.
Radiation Protection at the LHC Lessons Learned D. Forkel-Wirth, D. Perrin, S. Roesler, C. Theis, Heinz Vincke, Helmut Vincke, J. Vollaire CERN-SC-RP-SL.
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
ActiWiz – optimizing your nuclide inventory at proton accelerators with a computer code Helmut Vincke, Chris Theis CERN 1 RSO committee – 1/3/2012 NBI.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains O. Beltramello, H. Vincke, G. Corti on behalf of the Working.
Radiation Protection: How (radio)active are we going to be? S. Roesler (on behalf of DGS-RP) Chamonix 2011 LHC Performance Workshop January 24-28, 2011.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
The Panorama of the Future Radioactive Areas from now to 2020 S. Roesler on behalf of DGS-RP Workshop on remote manipulations and diagnostics in radioactive.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Neutron double differential distributions, dose rates and specific activities from accelerator components irradiated by 50 – 400 MeV protons F. Cerutti.
Procedure for Removal of Material and Waste from LHC P. Bonnal, N. Conan, I. Brunner, D. Forkel-Wirth, H. Menzel, S. Roesler, C. Tromel, L. Ulrici, with.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
1 Assessment of previous ORE evaluation by comparison with 3D exposure analysis. Analysis of the main difference contributors and optimisation of the calculation.
Radiological impacts from nuclear industrial facilities on the public and the environment : Their magnitude and the next 50 years forecast Sylvain Saint-Pierre.
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
Induced-activity experiment:
S. Roesler (on behalf of DGS-RP)
Radiation Protection Issues After 20 Years of LHC Operation
Long Shutdown for the LHC: Vacuum Beam Pipes
CATIA users meeting 07/06/2012 Material guidelines project – radiological hazard classification Helmut Vincke, Chris Theis on behalf of DGS/RP RSO committee.
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
1st HiLumi LHC / LARP Collaboration Meeting 2011 Nov 17th
C. Adorisio Extracted from the presentation given at
Presentation transcript:

HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP

Best Practices for ALARA - S. Roesler DGS-RP Outline 1. Reminder – legal constraints 2. Optimization during design 3. Dose rate outlook until 2035 Limitation Optimization / ALARA Radiological quantities to be assessed Design criteria Methodology Example (LHC collimators) Design options for ALARA Optimizing material selection (ActiWiz) Operational scenario LS1 & comparison with measurements Evolution until LS3 Predictions for HL-LHC until 2035

Best Practices for ALARA - S. Roesler DGS-RP Safety Code F – Limitation Radiation Workers Others Environment Category A: 20 mSv / yr Category B: 6 mSv / yr 1 mSv / yr 0.3 mSv / yr Design and operation !

Best Practices for ALARA - S. Roesler DGS-RP Safety Code F – Limitation Total number of working hours per year: 2000 hours (example: Supervised Area 3 µSv/h × 2000 h = 6 mSv) Low-occupancy: < 20% of working time

Best Practices for ALARA - S. Roesler DGS-RP Safety Code F – Optimization (ALARA) Design and operation ! Workers on CERN site 100 µSv / yr Outside of CERN (environment) 10 µSv / yr

Best Practices for ALARA - S. Roesler DGS-RP / 20 mSv / yr 1 mSv /yr 300 µSv / yr 100 µSv / yr 100 µSv / yr 10 µSv / yr Radiation Workers Other Workers Population Optimized (by definition) On CERN sites Outside of CERN Optimization / ALARA to be demonstrated Safety Code F – Limitation / Optimization Limits Optimization thresholds

Best Practices for ALARA - S. Roesler DGS-RP Periods of beam operation dose equivalent to personnel by stray radiation in accessible areas (example: dose in counting rooms of LHC experiments during operation) activation of effluents and air and their release into the environment as well as the resulting annual dose to the reference groups of the population (example: dose to reference group in the vicinity of LHC Point 1 after LS3) dose equivalent to personnel and environment in case of abnormal operation or accidents (examples: dose in counting rooms of LHC experiments during full beam loss, dose impact of fire) 2. Beam-off periods radioactivity induced by beam losses in beam-line components and related residual dose equivalent rates (example: dose equivalent rate maps in the UX and LSS) individual and collective doses to personnel during interventions on activated beam-line components or experiments (example: predictions of individual and collective dose for magnet exchange) 3.Decommissioning radionuclide inventory for waste disposal Radiological quantities

Best Practices for ALARA - S. Roesler DGS-RP / 20 mSv / yr 1 mSv /yr 300 µSv / yr 100 µSv / yr 100 µSv / yr 10 µSv / yr Radiation Workers Other Workers Population On CERN sites Outside of CERN Limits Optimization thresholds Optimization during design Prompt and residual radiation: Annual dose to reference group of population Prompt radiation: Dose equivalent to personnel involved in activity of the area Prompt radiation: Annual dose to personnel not involved in activity of the area Residual radiation: Individual and collective doses to personnel during interventions Design criterion: 2 mSv/intervention/year

Best Practices for ALARA - S. Roesler DGS-RP Intervention doses – Methodology 1.Calculation of residual dose rate maps 2.Calculation of individual and collective intervention doses 3.Revision of design and/or work scenario for cooling times typical for interventions on the respective component based on nominal operational parameters definition of geometry and materials as detailed as needed (and available) based on as realistic as possible work scenarios, including locations, duration, number of persons involved,.. identification of cooling times below which work will be impossible (design criterion: 2 mSv/intervention/year) communication of results and constraints to equipment groups start with work steps that give highest individual or collective doses consider optimization measures (distance, tooling, material choices, etc.) identify if remote handling is possible Start of iteration: New design ? Step 1 Revised work scenario ? Step 2

Best Practices for ALARA - S. Roesler DGS-RP Intervention doses – Example: LHC collimators 8 hours 1 week 4 months Cooling time Residual dose rate (mSv/h) after one year of operation at nominal intensity Aisle: 0.5-2mSv/h Close: 2-20mSv/h Aisle: mSv/h Close: 0.5-5mSv/h Aisle: mSv/h Close: 0.1-1mSv/h

Best Practices for ALARA - S. Roesler DGS-RP Intervention doses – Example: LHC collimators 1. Work by collimation team

Best Practices for ALARA - S. Roesler DGS-RP Intervention doses – Example: LHC collimators using vacuum connections with chain clamps reduces the individual dose by almost 40% 2. Work by vacuum team a permanent bake-out equipment lowers the individual and collective dose by a factor of five

Best Practices for ALARA - S. Roesler DGS-RP Intervention doses – Example: LHC collimators 4. Summary of work of all involved groups - minimum waiting time at least one week - use of quick-connect flanges necessary - installation of permanent bake-out equipment is important Conclusions:

Best Practices for ALARA - S. Roesler DGS-RP Optimization during design – Design Options 1.Material choice Low activation properties to reduce residual doses and minimize radioactive waste (optimization with ActiWiz code, see below) Avoid materials for which no radioactive waste elimination pathway exists (e.g., highly flammable metallic activated waste) Radiation resistant 2.Optimized handling Easy access to components that need manual intervention (e.g., valves, electrical connectors) or complex manipulation (e.g., cables) Provisions for fast installation/maintenance/repair, in particular, around beam loss areas (e.g., plugin systems, quick-connect flanges, remote survey, remote bake-out) Foresee easy dismantling of components 3.Limitation of installed material Install only components that are absolutely necessary, in particular in beam loss areas Reduction of radioactive waste

Best Practices for ALARA - S. Roesler DGS-RP Optimization during design – Material choice Goal: Minimize doses received by personnel during maintenance and repair Reduce downtime due to faster access and less restrictions for manipulation Reduce costs for waste disposal Consider radiological hazards in the choice of construction materials Tool to optimize material choices: ActiWiz (Authors: C.Theis and Helmut Vincke)  Computer code based on a risk model using pre-calculated FLUKA results. Considers external exposure and radioactive waste disposal  Provides radiological hazard assessment for arbitrary materials within a few seconds  Catalogue, produced with ActiWiz, listing pre-processed risk factors for typical accelerator construction materials as well as natural elements  Web-based catalogue (ActiWeb) allowing user friendly comparison of pre-processed materials Materials not available in the catalogue can be processed with ActiWiz Web-site:

Best Practices for ALARA - S. Roesler DGS-RP Optimization during design – ActiWiz

Best Practices for ALARA - S. Roesler DGS-RP Optimization during design – ActiWiz

Best Practices for ALARA - S. Roesler DGS-RP Optimization during design – ActiWiz Steel 316L Cast iron Main contributor: 54 Mn produced on Iron Main contributors: 60 Co (61%) produced on Cobalt 54 Mn (37%) produced on Iron 20 years irradiation 2 years cooling Dose rate Activity Dose rate

Best Practices for ALARA - S. Roesler DGS-RP Monitoring of activation – Material samples M-pipe: stainless steel Bus bar: copper Superconducting cable: mainly copper, niobium, titanium Thermal screen: aluminum Solder: tin-silver (old) tin-lead (new) - samples put in plastic bags and attached to the outside of interconnections - in total 148 bags at most critical and representative positions Example: interconnections

Best Practices for ALARA - S. Roesler DGS-RP Operational scenario Year of LHC Operation Peak / levelled luminosity [cm -2 s -1 ] Integrated luminosity [fb -1 ] ≤ E+3430 LS E E E+3450 LS E E E+3460 LS E E E LS E E E LS E E E E Source: S.Myers, RLIUP Workshop

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – LS1 Example: TAS at Point 5 FLUKA geometry: courtesy FLUKA team

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – LS1 Example: TAS at Point 5

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – LS3 Example: Triplet at Point 5 FLUKA geometry: courtesy FLUKA team 500 µSv/h 200 µSv/h cooling time dependence

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – Evolution Example: Triplet at Point 5 LS1 LS2 LS3 one month of cooling 200 µSv/h 50 µSv/h Factors LS3 / LS1 Luminosity: 2.5 Energy:

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – 2035 Example: HL-LHC Triplet at Point 1 FLUKA geometry: courtesy FLUKA team cooling time dependence 1 mSv/h 1.8 mSv/h

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – 2035 Example: HL-LHC Triplet at Point 1 1 mSv/h 400 µSv/h one month of cooling

Best Practices for ALARA - S. Roesler DGS-RP Dose rates – LS3 vs LS mSv/h 200 µSv/h one month of cooling

Best Practices for ALARA - S. Roesler DGS-RP Summary Optimization / ALARA is a legal requirement and starts with the design of a facility. A wide range of options, tools and models is available to achieve this goal. Optimization of the design is applied since many years for the LHC. The residual dose rate increase until LS3 depends on operational scenario, cooling time and material and is about a factor of 4 for the above mentioned conditions. Residual doses beyond LS3 depend (in addition) strongly on the new layout of installed components. Thus, scaling factors can only be reliably given for sections of the accelerator or experiments that will not change in LS3. Updated residual dose rate results are available for the present LSS1/5 and are being computed for the HL-LHC upgrade (thanks to the FLUKA team for sharing inputs!).

Best Practices for ALARA - S. Roesler DGS-RP Additional information

Best Practices for ALARA - S. Roesler DGS-RP / 20 mSv / yr Radiation Workers Optimization during operation – ALARA procedure CERN dose objective: operational periods 2 mSv / yr long shutdowns 3 mSv / yr ALARA categories for individual interventions Primary criteria Secondary criteria ALARA committee Detailed work-and-dose planning 100 µSv / yr