CLIC Controls – for the CDR Mick Draper Accelerator Control group, CERN.

Slides:



Advertisements
Similar presentations
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
R. Garoby 3/03/2006PAF progress1 PAF Progress 3/03/2006 M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, J. Wenninger 
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Introdcution to Workpackage/Activity Reflection D. Schulte.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Context of CERN-LAPP collaboration HS,
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Registered participants participants from outside Cern.
LCLS_II High Rep Rate Operation and Femtosecond Timing
ICE SECTION The coolest place to be! Elias Métral
Detector building Notes of our discussion
CONS and HL-LHC day Analysis of needs from BE-CO
Instrumentation for Accelerators Technologies for the HL-LHC
Input to Strategy currently planned
LHC experiments Requirements and Concepts ALICE
CLIC Klystron-based Design
M.Jonker CTC MPO-WG status
CTF3 Collaboration Technical Meeting January 2008
What Should We Do?.
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
CLIC/ILC Collaboration Meeting: Objectives & Organization
Measurements, ideas, curiosities
CLIC Beam Instrumentation
Presentation transcript:

CLIC Controls – for the CDR Mick Draper Accelerator Control group, CERN

CLIC Controls Talk outline – Mea Culpa – Scope – Key points to address – Status

CLIC Controls – mea culpa I really came here to grab people who had not yet produced their CDR contribution – But got landed with this talk Since IWLC2010, in Geneva, there has been little concrete progress (at CERN) on the design on the CLIC control system: – J. Serrano has produced a final version of the “Fine-timing” section for the CDR. – There is a first draft of the CONTROLS section for the CDR. With the exception of the description of the ACM, the CDR draft is still qualitative than quantitative Really was meant as a draft for comments! – Waiting for the comments ! – No specific R&D has been done for a new control system

CLIC Controls – Scope The “CLIC control system” will be implicated in all areas of the CLIC complex. Will consist of several sub-systems which will take care of individual parts of the complex – Final organisation will be determined by the needs of the operations teams. For the moment, the working assumption is that most of the complex will need only standard or ‘state of the art’ controls solutions. – The exceptions are: The main linacs LLRF, some instrumentation & TBA which need fs-level timing

CLIC Controls – Challenges If all goes well, here we are talking about computer systems which will be deployed in years from now. – I don’t have a crystal ball so can’t know what tomorrow’s servers will look like, so we assume: we will see an evolution and not a revolution and that there will no radical move away from today’s architectures We assume that we will be using the same s/w technology as today – Must not fall into the trap of specifying architecture choices too soon or they will already be out of date before they are installed (c.f. LHC Front-end systems)

CLIC Controls – Challenges With the CERN accelerator complex, we have learned from many years of practical experience and so, I expect, the future CLIC Control system to based on the same principals: – Modularity Lets us re-use components throughout the complex – 3-tier architecture Equipment-tier – interaction with the h/w Middle-tier – contains the business logic (middleware) Client-tier – GUIs for operating the machines

CLIC Controls – Challenges Strict limitations of heat dissipation into Main Linacs tunnel. – Force us to adopt a novel architecture Development of the CLIC Front-End Acquisition nd Control Module (ACM) – see previous talk – Scale of the 3 TeV project Enormous numbers of instruments to be read-out – 50 Hz cycle-time How to handle the data rate Need to define well what we want to keep – The LHC experiments are the experts in data reduction so if we need help we know who to ask

CLIC Controls – Timing Challenges Timing (see Fine Timing section in CDR) – LLRF Reference clock signal distribution requires 50fs jitter – Beam Instrumentation Longitudinal profile monitors. – Clock precision of few 10s of femtoseconds – 2-beam acceleration Needs very precise synchronisation between MB and DM – Use kickers to modify the trajectory – Required precision is about 40fs

CLIC Controls – Timing Solutions Continuous Wave (CW) system Pulsed system – Technical issues Both systems have been tested only over several hundred metre long fibres – 25km needed for CLIC is well beyond the current state of the art Laser coherence length Brillouin scattering with the fibres – Limits optical power which can be transmitted (CW system) Should build demonstrators of both CW and Pulsed systems – Who wants to get involved ??

CLIC Controls – ACM LAPP (Annecy) working on prototype – See previous talk Having seen John Osborne’s CES chapter, we can use “stub caverns” (every 878m) – Keeps electronics away from radiation – Take signals from 400+ ACM’s via fibres – Concentrate and do first processing – Next level of concentration will be at the surface buildings. – Final data concentration will be in “server farm” close to the control centre

CLIC Controls – Future Plans The 2 CERN Controls groups have not yet “engaged” with the wider CLIC community; – There is contact between CERN and CRNS for the ACM Need to start a more formal collaboration Make sure that h/w developments are compatible – Or at least minimize the incompatibilities – First contacts between the CERN Timing team and DESY DESY are the experts on the CW approach to fs timing – There is a Fieldbus working group at CERN Mostly dominated by the CERN experiments Need to establish CLIC’s requirements as part of this group Decide how/if CERN’s “White Rabbit” initiative can be integrated We need to create an active CLIC Controls Collaboration to discuss: – Architecture issues – potential showstoppers – How best to harness existing efforts and expertise !!

CLIC Controls

CLIC Controls – Scope The proposed 3TeV CLIC is a very large accelerator complex; consisting of: – Sources – Injectors – Damping and Combiner rings – Transfer lines – Main Beam (MB) and Drive Beam (DB) linacs – Experimental area(s)